Plan Review Notes
Plan Review Notes For Permit 18050041
Permit Number 18050041
Review Stop E
Sequence Number 6
Notes
Date Text
2018-08-06 06:33:36ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 4X THE PLAN REVIEW FEE HAS BEEN ADDED TO THIS FOR THE
 SAME DEFECIENCIES ON PLAN REVIEW DOCUMENTS FOR 6
 REVIEWS AS PER F.S. 553.802B
  
 1. 6TH PLAN REVIEW WITH SAME DEFICIENCIES.
  
 2. HIGH VOLTAGE AND LOW VOLTAGE TOGETHER IN J-BOX.
 725.136B NEC
  
 3. DISCONNECT REQUIRED WITHIN SIGHT OF SIGN THAT
 DISCONNECTS THE BRANCH CIRCUIT/FEEDER CONDUCTORS BEFORE
 IT ENTERS THE SIGN. NEC 600.6A1
  
 4. DUE TO THE DISCONNECT REQUIREMENTS OF 600.6A(1) NEC
 AN ELEC SUB-PERMIT CAN'T BE ISSUED TO AN ES LICENSE
 HOLDER BECAUSE IT IS OUT OF THE SCOPE OF WORK FOR THEIR
 LICENSE. PLEASE HAVE LICENSED ELECTRICIAN PULL
 SUB-ELECTRICAL PERMIT.
  
 SIGN CONTRACTORS F.S. 489.505 (#19) AND F.A.C.
 61G6-7.001 SPECIALTY ELECTRICAL CONTRACTORS (#2 SIGN
 SPECIALTY CONTRACTOR)
  
 THE SCOPE OF CERTIFICATION INCLUDES THE STRUCTURAL
 FABRICATION INCLUDING CONCRETE FOUNDATION, ERECTION,
 INSTALLATION, ALTERATION, REPAIR, SERVICE AND WIRING OF
 ELECTRICAL SIGNS AND OUTLINE LIGHTING. THE SCOPE OF
 CERTIFICATION SHALL NOT INCLUDE THE PROVISION OF, OR
 ANY ELECTRICAL WORK BEYOND, THE LAST DISCONNECT MEAN OR
 TERMINAL POINTS. HOWEVER, A CONTRACTOR CERTIFIED UNDER
 THIS SECTION MAY PROVIDE THE ELECTRICAL ENTRANCE
 REQUIREMENTS FOR METERING AND MAIN DISCONNECT OF REMOTE
 BILLBOARDS OR SIGNS WHICH ARE INDEPENDENT OF ANY
 STRUCTURE OR BUILDING AND WHICH REQUIRE NO MORE THAN
 TWENTY-FIVE (25) KILOWATTS AT TWO HUNDRED FIFTY (250)
 VOLTS MAXIMUM.
  
  
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
 CODES IN EFFECT:
  
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE 2017 6TH ED.
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION
 NEC = NFPA 70 2014 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 V/R,
  
 FRANK GIAQUINTO
 ELECTRICAL INSPECTOR
 ELECTRICAL PLANS EXAMINER
 CITY OF WPB
 [email protected]
 CELL: 561-657-1653