Date |
Text |
2018-05-01 10:43:39 | 1) THE PAPERWORK SUBMITTED FROM TIE DOWN ENGINEERING IS |
| UNACCEPTABLE. COPIES OF SIGNED AND SEALED ENGINEERING |
| PLANS OR DOCUMENTS VIOLATES FL. ADMIN. CODE RULE |
| 61G15-23.001. |
| 61G15-23.001 SIGNATURE, DATE AND SEAL SHALL BE AFFIXED. |
| (1) A PROFESSIONAL ENGINEER SHALL SIGN, DATE AND SEAL: |
| (A) ALL FINAL PLANS, PRINTS, SPECIFICATIONS, REPORTS, |
| OR OTHER DOCUMENTS PREPARED OR ISSUED BY THE LICENSEE |
| AND BEING FILED FOR PUBLIC RECORD |
| |
| 61G15-23.003 PROCEDURES FOR PHYSICALLY SIGNING AND |
| SEALING PLANS, SPECIFICATIONS, REPORTS OR OTHER |
| DOCUMENTS. |
| ENGINEERING PLANS, SPECIFICATIONS, REPORTS OR OTHER |
| DOCUMENTS WHICH MUST BE SIGNED, DATED AND SEALED IN |
| ACCORDANCE WITH THE PROVISIONS OF SECTION 471.025, |
| F.S., AND RULE 61G15-23.001, F.A.C. MAY BE PHYSICALLY |
| SIGNED, DATED AND SEALED AS PROVIDED HEREIN BY THE |
| PROFESSIONAL ENGINEER IN RESPONSIBLE CHARGE. |
| (1) THE LICENSEE SHALL SIGN BY HAND AN ORIGINAL OF THE |
| LICENSEE'S SIGNATURE ON EACH PAGE REQUIRED TO BE |
| SEALED. A SCANNED, FACSIMILE, DIGITALLY CREATED OR |
| COPIED IMAGE OF THE LICENSEE'S SIGNATURE SHALL NOT BE |
| USED. |
| (2) THE LICENSEE MUST THEN USE A WET SEAL, A DIGITALLY |
| CREATED SEAL, OR AN EMBOSSING SEAL PLACED PARTIALLY |
| OVERLAPPING THE LICENSEE'S SIGNATURE ON EACH PAGE |
| REQUIRED TO BE SEALED. THE PLACEMENT OF THE SEAL SHALL |
| NOT RENDER THE SIGNATURE ILLEGIBLE. |
| NOTE: THIS ISSUE HAS BEEN BROUGHT TO THE ATTENTION OF |
| STATIC ELECTRICITY ON NUMEROUS OCCASSIONS YET THE |
| CONTINUANCE OF SUBMITTAL OF THESE DOCUMENTS CONTINUES. |
| THE LICENSE FOR THIS ENGINEER HAS BEEN NULL AND VOID |
| SINCE 2015. THESE DOCUMENTS HAVE BEEN UNACCEPTABLE IN |
| THE PAST, ARE UNACCEPTABLE IN THE PRESENT AND WILL BE |
| UNACCEPTABLE IN THE FUTURE. |
| |
| 2) THE GAS DRAWING REFERENCES GAS SIZING TABLE 402.4 |
| (36) WHICH IS FOR A 2 PSI SYSTEM BUT THE GAS DRAWING |
| DOES NOT SHOW THE 2 PSI SYSTEM. THE ONLY REFERENCE IS |
| TO 10 PSI SYSTEM. CLARIFY. |
| |
| 3) YOU HAVE SUBMITTED SIX DIFFERENT GAS SIZING TABLES |
| FROM GASTITE IN ADDITION TO REFERENCING A TABLE ON THE |
| GAS PLAN FOR A 2 PSI SYSTEM FROM THE 2017 FBC-FUEL GAS |
| CODE. AT THIS POINT, I HAVE NO IDEA WHAT TABLE(S) YOU |
| ARE USING TO SIZE THIS SYSTEM. IDENTIFY WHICH SIZING |
| TABLE IS BEING USED FOR EACH PRESSURE. REMOVE ANY |
| SIZING TABLE NOT BEING USED.WPB AEND. TO FBC SEC. |
| 107.2.1. |
| |
| 4) PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR |
| THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO |
| BE INSTALLED TO PREVENT FLOTATION. NFPA 58 SEC. |
| 6.6.1.6. |
| |
| 5) IDENTIFY THE LOCATION OF THE FIRST STAGE REGULATOR |
| ON THE PLANS. |
| |
| 6) SUBMIT ALL THE PAGES FOR THE INSTALLATION |
| INSTRUCTIONS FOR THE REGULATORS. 2017 FBC-FUEL GAS SEC. |
| 410.1. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |
| |
| |
| |
| |