Plan Review Notes For Permit 18040925 |
Permit Number |
18040925 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-05-21 09:22:35 | 1)THE GAS DRAWING REFERENCES GAS SIZING TABLE 402.4 | | (36) WHICH IS FOR A 2 PSI SYSTEM BUT THE GAS DRAWING | | DOES NOT SHOW THE 2 PSI SYSTEM. THE ONLY REFERENCE IS | | TO 10 PSI SYSTEM. CLARIFY. | | | | 2) PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR | | THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO | | BE INSTALLED TO PREVENT FLOTATION. NFPA 58 SEC. | | 6.6.1.6. | | | | 3) SUBMIT ALL THE PAGES FOR THE INSTALLATION | | INSTRUCTIONS FOR THE REGULATORS. 2017 FBC-FUEL GAS SEC. | | 410.1. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | | | | | | | | | |
|