Plan Review Notes
Plan Review Notes For Permit 18040430
Permit Number 18040430
Review Stop P
Sequence Number 2
Notes
Date Text
2018-05-19 03:18:201) SHT. #7 - SUBMIT A CLEAR AND LEGIBLE TDH CALCULATION
 WORKSHEET. WPB AMEND. TO FBC SEC. 107.2.1.
 2) SHT. 7 - THE TDH CALCULATION WORKSHEET THAT HAS BEEN
 SUBMITTED IS BASED ON THE 2006 EDITION OF APSP 7. THE
 2013 EDITION IS IN EFFECT AS OF DECEMBER 31, 2017. THE
 SIMPLIFIED TDH CALCULATION IS NO LONGER IN THE 2013
 APSP 7. SUBMIT NEW TDH CALCULATIONS BASED ON 2013 APSP-
 7 SEC. 4.4.9.
 3) SHT. 5 - THIS SHEET STILL NOTES THAT THE TDH
 CALCULATION IS BASED ON THE MAXIMUM FLOW FROM THE PUMP
 CURVE. THIS INFORMATION NEEDS TO BE DELETED FROM THE
 PLANS.
 4) THE TDH CALCULATIONS SHALL BE THE TOTAL FROICTION
 LOSS OF THE PIPE, FITTINGS VALVES, FILTER,
 CHLORINATOR,ETC., ALL SYSTEM COMPONENTS EXCEPT THE
 PUMP.
 5) SUBMIT A COPY OF THE SIGNED POOL CONTRACT TO CONFIRM
 VALUE OF THIS PROJECT.WPB AMEND. TO FBC SEC.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved