Date |
Text |
2018-05-31 17:44:01 | 1ST REVIEW: FBC 2017 6TH EDITION |
| |
| PLUMBING COMMENTS: |
| |
| 1. SHT. ALS-1-2 THE PLUMBING FIXTURE COUNT STATES A |
| OCCUPANT LOAD OF 90 THE 2ND FLOOR OCCUPANT LOAD IS |
| LISTED AT 119 PLEASE CLARIFY. PER WPB AMEND TO FBC |
| 107.2.1 |
| |
| 2. SHT. A9-5-1 THE SHOWER IN THE WOMENS APPEARS TO BE A |
| ALTERNATE ROLL-IN THE DEPTH OF THE SHOWER IS SHOWN AS |
| 371/4" THE CODE CALLS OUT FOR A HARD DIMENSION OF 36" |
| SHALL COMPLY WITH FBC PL 608.2.3 |
| |
| 3. SHT. A9-5-1 PLEASE SHOW DIMENSIONS OF THE SHOWER IN |
| THE MENS BATHROOM. PER WPB AMEND TO FBC 107.2.1 |
| |
| 4. SHT A9-5-2 SHT. A9-5-2 THE TOILET IN THE BATHROOMS # |
| 203,205,208 SHALL COMPLY WITH FBC PL 604.2 |
| |
| 5. SHT. A9-5-9 THE GRAB BARS FOR THE TOILET IN |
| BATHROOMS # 203,205, 208 SHALL COMPLY WITH FBC PL |
| 604.5.1 AND 604.5.2 , 609.4 |
| |
| 6. SHT. A9-5-9 THE SHOWERS IN BATHROOMS # 203,205,208 |
| SHALL COMPLY WITH FBC PL 608 PLEASE INDICATE ON THE |
| PLAN WHICH TYPE OF SHOWER COMPARTMENT THEY ARE DESIGNED |
| TO TO MEET AND SHOW ALL DIMENSIONS. PER WPB AMEND TO |
| FBC 107.2.1 |
| |
| 7. SHT A9-5-9 SHOW COMPLIANCE WITH FBC PL 608.3 THE |
| GRAB BARS IN-THE SOWERS FOR BATHROOMS # 203,205,208 |
| |
| 8. SHT. P5.1 THE SHOWER IN BATHROOM 203, 208 MEN'S |
| BATHROOM IN BASEMENT ARE SHOWING A HORIZONTAL DRY VENT |
| AND ARE NOT CODE COMPLIANT ALL DRY VENTS SHALL COMPLY |
| WITH FBC PL 905.3, 905.4 |
| |
| 9. SHT. P5.1 THE TOILET 203 IS NOT VENTED PROPERLY IT |
| SHALL BE VENTED BEFORE CONNECTING TO THE BUILDING |
| DRAIN. PER FBC PL 901.2.1 |
| |
| 10. SHT. P5.1 WHAT VENTING SYSTEM FROM FBC PL CH. 9 ARE |
| THE TOILETS IN THE BASEMENT BATHROOMS DESIGNED TO MEET |
| IF IT IS A CIRCUIT VENT IT SHALL HAVE A VENT BETWEEN |
| THE TWO MOST UP STREAM FIXTURES AND THE VENT HAS TO BE |
| DRY . PER FBC PL 914.2 |
| |
| 11. PROVIDE A SITE PLAN THAT SHOWS THE CONNECTION OF |
| THE SANITARY AND WATER TO THE CITY SYSTEMS. PER WPB |
| AMEND TO FBC 107.2.1 |
| |
| 12. THE NEW SANITARY FROM THE UPPER FLOORS CAN NOT |
| DISCHARGE TO THE SUMP PIT IN THE BASEMENT IT SHALL |
| CONNECT TO THE GRAVITY SYSTEM CONNECTED TO THE CITY |
| TAP. PER FBC PL 712.1 |
| |
| 13. I UNDERSTAND THAT THE SUMP PUMP WILL BE DONE BY |
| OTHER BUT PLEASE PROVIDE THE CAPACITY OF THE SUMP PIT |
| AND PUMP AND A BASIC PIPING DETAIL. |
| |
| |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| THE PREVIOUSLY REVIEWED SHEETS. |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| 561-805-6711 |
| [email protected] |
| |