Plan Review Notes
Plan Review Notes For Permit 18040033
Permit Number 18040033
Review Stop G
Sequence Number 1
Notes
Date Text
2018-04-03 15:29:5504/03/2018 1ST GAS REVIEW**DENIED**
  
 1) PER F.A.C RULE-61G1-16.001 COPIES OF SIGNATURE AND
 SEAL ARE NOT PERMITTED AND MUST BE WET
  
 2) VALUE OF JOB SEEMS LOW. PROVIDE A SIGNED BONA FIDE
 CONTRACT. 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE
 OPINION OF THE BUILDING OFFICIAL, THE CLAIMED VALUATION
 OF
 BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS,
 MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE
 UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE
 DENIED, UNLESS THE APPLICANT CAN SHOW
 DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED
 CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE
 APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL
 BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING
 ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE
 LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION
 COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.),
 AS PUBLISHED BY INTERNATIONAL CODE CONGRESS.
 FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE
 BUILDING OFFICIAL.
  
 3) AS YOU ARE CHANGING THE LOCATION OF THE 2ND STAGE
 REGUALTOR AND THE TANK PROVIDE A ISOMETRIC DRAWING TO
 INCLUDE THE CUT SECTION OF PIPING FROM THE NEW L.P TANK
 TO THE BUILDING INLET. FBC 107.3.5
  
 4) PLEASE PROVIDE 2 COPIES OF ALL PAPERWORK. YOU HAVE
 INCLUDED ONLY 1 SET OF GAS REGUALTOR MANUFACTURE
 INSTALLATION MANUAL. FBC 107.3.5
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  