2018-04-04 14:23:21 | 04/04/2018 1ST GAS REVIEW**DENIED** |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| |
| |
| |
| 1) SHOW PIPE SIZE ON OUTLET OF GAS METER. SUBMIT AN |
| ISOMETRIC DRAWING THAT CLEARLY SHOWS THE LENGTH OF ALL |
| CUT SECTIONS OF PIPE PER 2017 FBC-FUEL GAS, SECS. |
| 402.4.1, 402.4.2. OR 2017 FBC-RES SEC. G2413.4.1, |
| G2413.4.2 |
| |
| 2) CITY RECORDS SHOW EXISTING GAS SYSTEM ( POOL HEATER) |
| LIST THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU |
| LOAD ON THE SYSTEM. REFER TO THE 2017 FBC-FUEL GAS |
| SECS.401.8, 402.2, AND TABLES 402.4 (1) THRU 402.4 (37) |
| OR 2017 FBC-RES. SEC. G2413.3, G2413.4 AND TABLES |
| G2413.4 (1 ) THROUGH G2413.4 (21). THE PLANS INDICATE |
| AN EXISTING GAS METER. THE BTU LOAD OF THE EXISTING GAS |
| SYSTEM MUST BE ADDED INTO THE TOTAL BTU LOAD ON THE |
| SYSTEM TO ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. |
| IF UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO |
| ENSURE A SAFE OPERATING SYSTEM. SUBMIT A GAS PIPING |
| RISER DIAGRAM THAT SHOWS THE TYPE OF EXISTING |
| APPLIANCE, THE BTU LOAD OF EACH APPLIANCE, THE PIPE |
| SIZE AND TYPE OF PIPE TO EACH APPLIANCE, AND THE |
| DISTANCE OF THE LONGEST LENGTH OF PIPING FROM THE POINT |
| OF DELIVERY TO THE MOST REMOTE OUTLET AND THE LOAD OF |
| THE SECTION. NOTE: IF THE EXISTING SYSTEM IS LESS THAN |
| A 2 PSI SYSTEM AND THE SYSTEM PRESSURE IS INCREASED TO |
| 2 PSI, A LINE PRESSURE REGULATOR IS REQUIRED AT ALL THE |
| EXISTING APPLIANCES. FGC SECS. 401.4, 401.8, 402.1, |
| 402.2, 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, |
| G2413.2, G2413.3. |
| |
| 3) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| INSTALLATION MANUAL FOR THE STOVE TO VERIFY COMPLIANCE |
| WITH STANDARDS NFPA 54, NFPA 58, AND FBC-2017 FUEL GAS |
| CODE SEC. 402.2, AND 301.3 OR 2017 FBC-RES. SEC. |
| G2404.3. GAS APPLIANCES SHALL BE LISTED AND LABELED. |
| THE INSTALLATION MANUALS FOR ALL GAS APPLIANCES / |
| EQUIPMENT SHALL BE ONSITE AT THE TIME OF INSPECTION. |
| FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| |
| 4) ) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED |
| GAS APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| ADDITION TO THE REQUIRED VENTILATION AIR. 2017 FBC-FUEL |
| GAS SEC.304.9.3 OR FBCR G2407.9.3 |
| |
| |
| TIM HUNT |
| PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| 561-805-6695 |
| [email protected] |
| |
| |
| |