Plan Review Notes
Plan Review Notes For Permit 18031402
Permit Number 18031402
Review Stop M
Sequence Number 3
Notes
Date Text
2019-01-10 11:00:33MECHANICAL PROVISOS:
  
 1) COMMISSIONING OF THE BREWERY OR DISTILLERY SYSTEM
 SHALL BE PERFORMED BY BMC CONSULTING ENGINEERS, AND A
 SIGNED AND SEALED LETTER OR REPORT CERTIFYING THE
 INSTALLATION AND FUNCTIONING OF THE SYSTEM SHALL BE
 PROVIDED.
  
 2) MANUFACTURER?S SPECIFICATIONS AND INSTALLATION
 INSTRUCTIONS FOR THE CHILLER AND ALL BREWERY EQUIPMENT
 SHALL BE ONSITE AT TIME OF INSPECTION.
  
 3) ACCESS AND VENTILATION SHALL BE PROVIDED FOR THE
 CHILLER IN THE MEZZANINE.
  
 4) THE VENTILATION SYSTEM IN THE BREWERY ROOM SHALL
 OPERATE CONTINUOUSLY.
  
 5) MANUFACTURER?S SPECIFICATIONS AND THE LOUVER NOA
 AND/OR FLORIDA PRODUCT APPROVAL SHALL BE ONSITE AT TIME
 OF INSPECTION.
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved