Plan Review Notes For Permit 18030986 |
Permit Number |
18030986 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-03-26 08:26:46 | THE FOLLOWING ITEMS MUST BE RECEIVED OR COMPLETED PRIOR | | TO ISSUANCE. | | | | 1) CONFIRMATION LETTER FROM F.P.L. THAT THERE IS NO | | ELECTRICAL SERVICE TO STRUCTURE. | | | | 2) A SEWER LATERAL CAPPING PERMIT PULLED AND WHEN WORK | | IS COMPLETED, A #703 FINAL PLUMBING REQUESTED AND | | PASSED. | | | | 3) CONFIRMATION FROM UTILITIES THAT THE WATER METER HAS | | BEEN PULLED. PLEASE BE ADVISED, THE DEMO MUST BE KEPT | | WET FOR DUST CONTROL. | | EITHER, A) YOU SUPPLY WATER TO THE JOB AND KEEP THE | | DEMO WET. | | B) RENT A HYDRANT METER THROUGH THE WATER DEPARTMENT | | FOR THE DURATION OF THE DEMOLITION. ( THE PREFERRED | | METHOD ) | | C) INSTALL A BACKFLOW PREVENTER AND HOSE BIB. THIS WILL | | REQUIRE ITS OWN PERMIT AS THE TYPE OF BACKFLOW IS | | REGULATED AND THE INSTALLATION WILL NEED TO BE | | INSPECTED. | | | | 4) ENGINEERING AND HISTORIC WILL NEED TO APPROVE THIS | | APPLICATION. I WILL MOVE IT TO ENGINEERING NOW. | | | | ANY QUESTIONS, FEEL FREE TO CALL TOM @ 561-805-6669 | | | | |
|