Plan Review Notes
Plan Review Notes For Permit 18030986
Permit Number 18030986
Review Stop B
Sequence Number 1
Notes
Date Text
2018-03-26 08:26:46THE FOLLOWING ITEMS MUST BE RECEIVED OR COMPLETED PRIOR
 TO ISSUANCE.
  
 1) CONFIRMATION LETTER FROM F.P.L. THAT THERE IS NO
 ELECTRICAL SERVICE TO STRUCTURE.
  
 2) A SEWER LATERAL CAPPING PERMIT PULLED AND WHEN WORK
 IS COMPLETED, A #703 FINAL PLUMBING REQUESTED AND
 PASSED.
  
 3) CONFIRMATION FROM UTILITIES THAT THE WATER METER HAS
 BEEN PULLED. PLEASE BE ADVISED, THE DEMO MUST BE KEPT
 WET FOR DUST CONTROL.
 EITHER, A) YOU SUPPLY WATER TO THE JOB AND KEEP THE
 DEMO WET.
 B) RENT A HYDRANT METER THROUGH THE WATER DEPARTMENT
 FOR THE DURATION OF THE DEMOLITION. ( THE PREFERRED
 METHOD )
 C) INSTALL A BACKFLOW PREVENTER AND HOSE BIB. THIS WILL
 REQUIRE ITS OWN PERMIT AS THE TYPE OF BACKFLOW IS
 REGULATED AND THE INSTALLATION WILL NEED TO BE
 INSPECTED.
  
 4) ENGINEERING AND HISTORIC WILL NEED TO APPROVE THIS
 APPLICATION. I WILL MOVE IT TO ENGINEERING NOW.
  
 ANY QUESTIONS, FEEL FREE TO CALL TOM @ 561-805-6669
  
  