Plan Review Notes
Plan Review Notes For Permit 18030485
Permit Number 18030485
Review Stop P
Sequence Number 1
Notes
Date Text
2018-03-28 08:38:3303/28/2018 1ST PLUMBING REVIEW**DEIEND**
  
 1) VALUE OF JOB IS TOOLOW. PROVIDE A BONA FIDE SIGNED
 CONTRACT. PLEASE BE ADVISED THIS MUST INCLUDE ALL
 MATERIAL, LABOR, OVERHEAD, PROFITS. WPB AMEND TO THE
 FBC 109.3. THERE IS NO BUILDING PERMIT OR APPLICATION
 SO ALL COST INCLUDING CABINETS, REPAIRING OF FLOOR/
 TILE MUST BE INCLUDED IN JOB VALUE.
  
 2) PROVIDE DETAIL ON HOW YOU INTENTED TO CAP OFF
 EXISTING TUB DRAIN AND ALSO PROVIDE FIRE STOPPING
 DETAIL. BUILDING PERMIT MAY BE REQUIRED.FBC 107.2.1
  
 3) PROVIDE PLAN SHOWING TOTAL HEIGHT OF SINK COUNTER
 TOP.BUILDING WAS BUILT UNDER FAIR HOUSING ACT AND ALL
 REQUIRED FIXTURES MUST REMAIN IN COMPLAINCE WITH FHA
 7.52
  
 4) PROVIDE FLOOR PLAN SHOWING REQUIRED CLEAR FLOOR
 SPACE FOR ALEAST 1 OF THE 2 SINKS. FHA 7.47, 7.48
  
 TIM HUNT
 PLUMBING INSPECTOR/ PLUMBING PLANS REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695