Date |
Text |
2018-03-09 13:20:52 | 03/09/2018 1ST GAS REVIEW**DENIED** |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| |
| THE MASTER PERMIT # 16110325 DOES NOT SHOW ANY GAS |
| APPLIANCES. |
| |
| |
| 1) VALUE* JOB VALVE SEEM LOW, PROVIDED BONA FIDE SIGN |
| CONTRACT. WPB AMEND TO THE FBC 109.3 BUILDING PERMIT |
| VALUATIONS. |
| IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE |
| CLAIMED VALUATION OF |
| BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| DENIED, UNLESS THE APPLICANT CAN SHOW |
| DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION |
| COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), |
| AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. |
| FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| BUILDING OFFICIAL. |
| |
| 2) PROVIDE REQUIRED MAKE UP AIR FOR ALL ROOMS THAT WILL |
| HAVE A GAS APPLIANCES IN THEM. SUBMIT CALCULATIONS FOR |
| COMBUSTION AIR PER THE 2014 FBC-FUEL GAS CODE |
| SEC.304.1, 614.5 (CLOTHES DRYERS) OR 2014 FBC-RES. SEC. |
| G 2407.1 AND G2439.4 (CLOTHES DRYERS). SUBMIT |
| CALCULATIONS FOR COMBUSTION AIR PER THE 2014 FBC-FUEL |
| GAS CODE SEC.304.1, 614.5 (CLOTHES DRYERS) OR 2014 |
| FBC-RES. SEC. G 2407.1 AND G2439.4 (CLOTHES DRYERS). ) |
| SUBMIT COMBUSTION AIR CALCULATIONS FOR THE ADDED GAS |
| APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED BY THE |
| BUILDING?S MECHANICAL VENTILATION SYSTEM, THE SYSTEM |
| SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN |
| ADDITION TO THE REQUIRED VENTILATION AIR. FGC |
| SEC.304.9.3 OR FBCR G2407.9.3 |
| |
| 3) TYPE OF GAS (LP OR NATURAL). FBC 107.2.1 |
| |
| 4) YOU ARE MISSING THE FIRE PLACE IN THE BTU |
| 7. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| SEC. G2413.2. |
| |
| 5) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| SEC. G2413.2. |
| |
| 6) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE |
| PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM |
| THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE |
| DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL |
| GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4 |
| (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4, |
| G2412.8, G2413.1, G2413.2, & G2413.3. |
| |
| TIM HUNT |
| PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER |
| CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| 561-805-6695 |
| [email protected] |
| |