2018-02-15 15:13:11 | RESIDENTIAL (R3) ALTERATION, SECOND BUILDING REVIEW |
| CHECKLIST. |
| CODE: FBC 6TH EDITION (2017). |
| |
| 1- REVISED INSTALLATION SCHEDULE SUBMITTED: |
| A) THE DESIGN CRITERIA INFORMATION SHOWN DOESN'T MATCH |
| ACTUAL BUILDING. ALSO, THERE IS INFORMATION IN THE |
| DESIGN CRITERIA THAT DOESN'T SEEM TO APPLY FOR THIS |
| PROJECT. IF USING THIS INFORMATION, THEN PROVIDE |
| COMPLETE SITE SPECIFIC SIGNED AND SEALED CALCULATIONS |
| USING ONLY THE REQUIRED INFORMATION TO OBTAIN THE |
| DESIGN PRESSURES. SEC. 107.2.1.3 CITY AMENDMENTS. |
| NOTE: IF USING THE FBC TABLES, THEN JUST SPECIFY THE |
| CURRENT CODE (2017), BUILDING MEAN ROOF HEIGHT, |
| LOCATION OF OPENINGS (END OR INTERIOR) AND BUILDING |
| EXPOSURE. |
| |
| B) INSTALLATION SCHEDULE IS MISSING THE GLASS |
| SEPARATION DISTANCE. SEC. R301.1 FBC-RESIDENTIAL. |
| GLASS SEPARATION IS REQUIRED TO BE IN THE INSTALLATION |
| SCHEDULE. THE PURPOSE OF THE INSTALLATION SCHEDULE IS |
| TO INCLUDE ALL THE PROPOSED INSTALLATION TO FACILITATE |
| REVIEW AND INSPECTIONS. SEE CITY INSTALLATION SCHEDULE |
| SAMPLE THAT SHOWS ALL THE INFORMATION THAT IS REQUIRED |
| TO BE INCLUDED. CONTRACTOR MAY USE THE CITY |
| INSTALLATION SCHEDULE OR PROVIDE ANY OTHER FORMAT AS |
| LONG AS ALL THE REQUIRED INFORMATION IS INCLUDED. |
| |
| C) CLARIFY WHAT DOES CONNECTION TYPE 3/8"WM SPECIFIED |
| FOR OPENINGS #1 AND #2 ON TOP CONNECTION STANDS FOR?. |
| DETAIL SECTION "A" DOESN'T SPECIFY THIS. SEC. 107.2.1 |
| CITY AMENDMENTS. |
| |
| D) CLARIFY WHAT DOES CONNECTION TYPE "ADJ SILL" |
| SPECIFIED FOR ALL OPENINGS AT BOTTOM CONNECTION STANDS |
| FOR?. DETAIL SECTION "H" DOESN'T SPECIFY THIS. SEC. |
| 107.2.1 CITY AMENDMENTS. |
| |
| E) SIZE OF LAG SCREWS SPECIFIED ON TOP CONNECTION USING |
| SECTION OR TYPE "U" IS NOT CLEAR. INSTALLATION SCHEDULE |
| CALLS FOR THREE 5/16 X 3 LAG SCREWS, WHILE NOTE BELOW |
| THE INSTALLATION SCHEDULE CALLS FOR THREE 5/16 X 3.5" |
| LAGS. REVISE AS REQUIRED TO MATCH. NOTE: THE SPECIFIED |
| SCREW NEEDS TO HAVE MIN. 2" PENETRATION OF THREADED |
| AREA. SEE SECTION DETAIL "U" AND REVISE LAG SCREW SIZE |
| TO INCLUDE THE THICKNESS OF THE EXISTING SOFFIT. SEC. |
| 107.2.1 CITY AMENDMENTS. |
| |
| F) PROVIDE COMPLETE SPECIFICATIONS FOR TYPE OF ANCHOR |
| TO BE USED. SPECIFY ANCHOR DIAMETER AND LENGTH TO |
| VERIFY COMPLIANCE WITH THE PRODUCT APPROVAL |
| REQUIREMENTS FOR MINIMUM EMBEDMENT. SEC. R301.1 |
| FBC-RESIDENTIAL. NOTE: ANCHOR TYPE SPECIFIED AT BOTTOM |
| CONNECTION OF OPENINGS #3 AND #4 IS TAPCON. ACCORDING |
| TO SPECIFICATION #1(A) ON PAGE 13 OF 20 THE CONCRETE |
| NEEDS TO HAVE A MINIMUM STRENGTH OF 3KSI. IT LOOKS LIKE |
| THESE ACCORDION SHUTTERS ARE GOING TO BE MOUNTED ON THE |
| PATIO SLAB. TYPICALLY, PATIO CONCRETE SLABS DON'T HAVE |
| THE STRUCTURAL CONCRETE STRENGTH OF 3KSI. THEREFORE THE |
| TAPCON MAY NOT BE USED. IT LOOKS LIKE THE 1/4" BLUE TAP |
| CONCRETE ANCHORS ONLY REQUIRE 2KSI CONCRETE STRENGTH. |
| THIS CONNECTOR MAY BE USED INSTEAD. REVISE ANCHOR TYPE |
| AND SPACING AS REQUIRED OR PROVIDE PROOF THAT THE PATIO |
| CONCRETE SLAB HAS 3KSI STRENGTH. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| (561)805-6712 |