2018-02-09 13:00:26 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| |
| 1) THE SUBMITTED PLANS FOR THIS PERMIT APPEAR TO BE |
| GENERAL DOCUMENTS OF THE ENTIRE PROJECT. THE |
| APPLICATION STATES FOR BUILDING # 1, 906 17TH ST; |
| HOWEVER, IT APPEARS TO BE OF ALL THE BUILDINGS IN THIS |
| PROJECT. |
| |
| |
| PER NFPA 1 |
| 1.7.12.3 THE CONSTRUCTION DOCUMENTS FOR EACH PHASE |
| SHALL BE COMPLETE IN THEMSELVES, SO THAT REVIEW AND |
| INSPECTION CAN PROPERLY BE MADE. PRELIMINARY PLANS OF |
| THE TOTAL BUILDING SHALL BE SUBMITTED WITH THE |
| CONSTRUCTION DOCUMENTS, AND WITH SUFFICIENT DETAIL, SO |
| THAT PROPER EVALUATION CAN BE MADE. AREAS AND ITEMS NOT |
| INCLUDED IN THE PHASE TO BE PERMITTED SHALL BE SHOWN AS |
| NOT INCLUDED. |
| |
| PER NFPA 72 |
| |
| 7.4.4 SHOP DRAWINGS SHALL INCLUDE THE FOLLOWING |
| INFORMATION: |
| (1) NAME OF PROTECTED PREMISES, OWNER, AND OCCUPANT |
| (WHERE APPLICABLE) |
| (2) NAME OF INSTALLER OR CONTRACTOR |
| (3) LOCATION OF PROTECTED PREMISES |
| |
| |
| EACH SUBMITTED PLAN SHALL BE SPECIFIC TO THE BUILDING |
| THAT IT REPRESENTS. |
| |
| |
| |
| 2) THE SUBMITTED PLANS DO NOT INCLUDE THE CORRECT |
| ADDRESS AS REFLECTED ON THE APPLICATION. |
| |
| THE ADDRESS ON THE APPLICATION IS 907 17TH ST. THE |
| ADDRESS ON THE SUBMITTED PLANS IS 808 17TH ST. |
| |
| PER NFPA 72 |
| |
| 7.4.4 SHOP DRAWINGS SHALL INCLUDE THE FOLLOWING |
| INFORMATION: |
| |
| (3) LOCATION OF PROTECTED PREMISES |
| |
| PLEASE PROVIDE THE CORRECT ADDRESS OF THE CORRECT |
| BUILDING ON THE SUBMITTED SET OF PLANS. |
| |
| |
| |
| 3) SHEETS FA 2.00A & 2.00 B -THERE IS NO INDICATION OF |
| THE LOCATION OF THE FAAP IN BUILDING # 1. |
| |
| PER NFPA 72 |
| 7.4.7 CONTROL UNIT DIAGRAMS SHALL BE PROVIDED FOR ALL |
| CONTROL EQUIPMENT (I.E., EQUIPMENT LISTED AS EITHER A |
| CONTROL UNIT OR CONTROL UNIT ACCESSORY), POWER |
| SUPPLIES, BATTERY CHARGERS, AND ANNUNCIATORS AND SHALL |
| INCLUDE THE FOLLOWING INFORMATION: |
| (2) LOCATION(S) OF CONTROL EQUIPMENT |
| |
| IT IS RECOMMENDED THAT THE FAAP BE LOCATED WITHIN THE |
| ELECTICAL ROOM ON THE 1ST FLOOR. |
| |
| |
| |
| |
| 4) SHEET FA 1.00 - THE IS ONLY ONE FACP AND FAAP FOR |
| FOUR BUILDINGS. THERE SHOULD BE ONE FACP AND 4 FAAP; |
| ONE FOR EACH BUILDING. |
| |
| PER NFPA 72 |
| |
| 10.18.3* ANNUNCIATOR ACCESS AND LOCATION. |
| 10.18.3.1 ALL REQUIRED ANNUNCIATION MEANS SHALL BE |
| READILY ACCESSIBLE TO RESPONDING PERSONNEL. |
| 10.18.3.2 ALL REQUIRED ANNUNCIATION MEANS SHALL BE |
| LOCATED AS REQUIRED BY THE AUTHORITY HAVING |
| JURISDICTION TO FACILITATE AN EFFICIENT RESPONSE TO THE |
| SITUATION. |
| |
| 10.18.5.3 WHERE THE SYSTEM SERVES MORE THAN ONE |
| BUILDING, EACH BUILDING SHALL BE ANNUNCIATED |
| SEPARATELY. |
| |
| IT IS RECOMMENDED THAT THE FAAP BE LOCATED WITHIN THE |
| ELECTICAL ROOM ON THE 1ST FLOOR OR AT ANOTHER |
| ACCEPTABLE AND AGREEABLE LOCATION. |
| |
| |
| |
| 5) SHEET FA 1.00 - THERE IS AN INDICATION THAT THE |
| ALARM CAN ONLY BE RESET AT THE FACP |
| |
| IT IS RECOMMENDED AND IF POSSIBLE, THAT THE SYSTEM CAN |
| BE SILENCED AND RESET FROM EACH FAAP. |
| |
| |
| |
| 6) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| |
| 7) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |