Plan Review Notes For Permit 18020254
Permit Number 18020254
Review Stop P
Sequence Number 1
Notes
Date Text
2018-03-12 12:03:061ST REVIEW: FBC 2017 6TH EDITION
  
 PLUMBING COMMENTS:
  
 1. PLEASE PROVIDE PLUMBING FIXTURE COUNT BREAK DOWN
 WITH OCCUPANT LOAD FOR EACH AREA PER OCCUPANT TYPE ON
 THE 1ST + 2ND FLOOR, THE ONE THAT WAS ON SHT. GN-1 IS
 CONFUSING UNDER THE BUSINESS OCCUPANCY IT LIST REQUIRED
 2 TOILETS FOR MEN AND WOMEN PROVIDED 1 TOILET THAT
 SEEMS LESS THE REQUIRED AMOUNT. PLEASE CLARIFY PER WPB
 AMEND TO FBC 107.2.1
  
 2. IF THE COVERED ENTRY CANOPY HAS A PARAPET THAT WOULD
 CAUSING WATER TO POND UP IF THE MAIN STORM DRAIN GOT
 CLOGGED AN OVERFLOW DRAIN OR SCUPPER WILL BE REQUIRED.
 PER FBC PL 1108.1
  
 3. 3. SHT. A-406-A DETAIL #1 NOTES AN ADA TRANSFER TUB
 BUT IT SHOWS ROLLS IN SHOWER PLEASE CLARIFY. PER WPB
 AMEND TO FBC 107.2.1
  
 4. SHT. A-407, 408, 409 DETAIL #1, A THE END OF THE
 GRAB BAR ON THE SIDE WALL OF THE TOILET SHALL BE A MIN.
 OF 54? OFF THE REAR WALL IT IS SHOWN AT 48? PLEASE
 CHECK ALL DETAILS SHOWING THE SIDE WALL GRAB BAR. PER
 FBC ACC 604.5.1
  
 5. SHT. A-407, 408, 409, PLEASE SHOW THE DEPTH
 DIMENSION OF THE STANDARD TOILET STALL. PER FBC PL
 405.3.1
  
 6. SHT. A-407, 408, 409, 414 DETAIL B, C, F THE GRAB
 BARS SHALL BE SHOWN TO BE MEASURED FROM FINISHED FLOOR
 TO THE TOP OF THE GRIPPING SURFACE THEY ARE SHOWN
 MEASURED 36? TO THE CENTER OF THE BAR IF INSTALLED THIS
 WAY THEY WILL NOT BE CODE COMPLIANT PLEASE CHECK ALL
 DETAILS. PER FBC ACC 609.4
  
 7. SHT. A-407, 408, 409, 414 DETAILS E, C, B, THE RIM
 OF THE LAVATORY IS SHOWN OVER 34? IT SHALL BE 34
 MAX PLEASE CHECK ALL DETAILS. PER FBC ACC 606.3
  
 8. SHT. A 414 PLEASE SHOW THE REQUIRED CLEAR FLOOR
 SPACE FOR THE TRANSFER SHOWER. PER FBC ACC 608.2.1
  
 9. SHT. A 414 THE SEAT IN THE TRANSFER SHOWER SHALL BE
 WITHIN 3? OF THE FRONT OF THE SHOWER. PER FBC ACC 610.3
  
 10. SHT. A 414 PLEASE SHOW COMPLIANCE WITH SHOWER
 CONTROLS AND SPAY UNIT. PER FBC ACC 608.5.1
  
 11. SHT. 417 DETAIL # 1, H, D THE END OF THE GRAB BAR
 ON THE SIDE WALL OF THE TOILET SHALL BE A MIN. OF 54?
 OFF THE REAR WALL IT IS SHOWN AT 48? PLEASE CHECK ALL
 DETAILS SHOWING THE SIDE WALL GRAB BAR. PER FBC ACC
 604.5.1
  
 12. SHT. 417 DETAIL #C, D,E,H THE GRAB BARS SHALL BE
 SHOWN TO BE MEASURED FROM FINISHED FLOOR TO THE TOP OF
 THE GRIPPING SURFACE THEY ARE SHOWN MEASURED 36? TO THE
 CENTER OF THE BAR IF INSTALLED THIS WAY THEY WILL NOT
 BE CODE COMPLIANT PLEASE CHECK ALL DETAILS. PER FBC ACC
 609.4
  
 13. SHT. A-4.15 PLEASE SHOW COMPLIANCE FOR THE WARMING
 KITCHEN SINK SHALL COMPLY WITH FBC ACC 606.2 AND 606.3
  
 14. SHT. P-102 SANITARY PIPE NOT SHOWN FOR COMMON
 BATHROOMS ON 2ND FLOOR PLEASE CLARIFY. PER WPB AMEND TO
 FBC 107.2.1
  
 15. SHT P-104 SHOWS A TRANSFER TUB FOR ROOM 1009 THE
 ACCESSIBLE ROOM MATRIX LIST ROLLS IN SHOWER FOR ROOM
 1009 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 16. THE HOT WATER PIPING AND RECERC PIPING SHALL BE 1?
 WALL THICKNESS. PER FBC ENERGY C404.4
  
 17. SHT. P-601 CONDENSING WATER HEATER SCHEDULE IS
 BLANK PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 18. SHT. P-503 THE WATER HEATER PIPING DETAIL SHOWS THE
 COLD SUPPLY CONNECTING TO THE INLET OF THE STORAGE TANK
 IT SHALL CONNECT TO INTAKE OF THE BOILER. PER
 MANUFACTURE INSTALL GUIDE
  
 19. PROVIDE SE (SESCO) SOVENT TITE RUFF DESIGN MANUAL.
 PER WPB AMEND TO FBC 107.2.1
  
 20. PROVIDE A PLAN REVIEW AND APPROVAL OF THE SE
 (SESCO) TITE RUFF SOVENT SYSTEM FOR THIS PROJECT. PER
 FBC PL 316.1.3
  
 21. PLEASE PROVIDE EXPANDED SANITARY AND WATER
 ISOMETRICS FOR THE COMMON AREA BATHROOMS AND KITCHEN ON
 THE 1ST AND 2ND FLOOR. PER WPB AMEND TO FBC
 107.3.5.1.3(13)
  
 22. PLEASE PROVIDE SIZING CALCULATIONS FOR THE GREASE
 INTERCEPTOR. PER FBC PL 1003.2
  
 23. P- 701 IT APPEARS THAT THE VENT FOR THE COMMON
 BATHROOMS ARE CONNECTING TO THE SOVENT AERATORS THIS
 DOES NOT COMPLY WITH SOVENT DESIGN MANUAL VENTS FROM
 CONVENTIONAL SYSTEMS SHALL VENT SEPARATELY THROUGH THE
 ROOF OR CONNECT SEPARATELY TO THE SOVENT STACK.
  
 24. SHT. A-0.01 THE SHEET INDEX LIST A STORM ISOMETRIC
 IT IS MISSING FROM SUBMITTED DRAWINGS, IN THE PRE
 SUBMITTAL MEETING WE WERE TOLD THE EXISTING STORM WAS
 TO REMAIN IF THIS IS STILL THE CASE PLACE NOTE ON PLAN
 AND PROVIDE DRAWINGS WITH DETAILS FOR COVERED ENTRY
 ROOF DRAINS. PLEASE CLARIFY PER WPB AMEND TO FBC
 107.3.5.1.3(13)
  
 25. SHT. P 701 THE ISOMETRIC DRAWING IS TO CONGESTED TO
 DETERMINE CODE COMPLIANCE FOR CLARIFICATION JUST SHOW
 PIPING FOR 1ST AND 2ND FLOOR WITH THE STACKS LABEL TO
 MATCH THE FLOOR PLAN AND STACKS ON SHT. P-702. PER WPB
 AMEND TO FBC 107.3.5.1.3(13)
  
 26. PLEASE SIZE THE PIPING AND LABEL THE FIXTURES ON
 THE SANITARY AND WATER ISOMETRIC DRAWINGS SHTS. P-701,
 702, 703, 704. PER WPB AMEND TO FBC 107.3.5.1.3(13)
  
 27. SHT. P 703 THE ISOMETRIC DRAWING IS TO CONGESTED TO
 DETERMINE CODE COMPLIANCE FOR CLARIFICATION JUST SHOW
 PIPING FOR 1ST AND 2ND FLOOR WITH THE STACKS LABEL TO
 MATCH THE FLOOR PLAN AND STACKS ON SHT. P-704. PER WPB
 AMEND TO FBC 107.3.5.1.3(13)
  
 28. SHT. P-503 DETAIL #2 AND THE GAS WATER HEATER
 DIRECT VENT COMBUSTION DETAIL SHOW TWO DIFFERENT VENT
 AND INTAKE SYSTEMS PLEASE PROVIDE A SIT SPECIFIC
 VENTING DETAIL. PER WPB AMEND TO FBC 107.2.1
  
 29. THE POOL BATHROOMS SHALL COMPLY WITH FBC PL 403.6
  
 30. SANITARY PIPING OVER THE KITCHEN AREA SHALL BE
 SHIELDED TO INTERCEPT POTENTIAL DRIPS OR LEAKS. PER US
 FOOD CODE
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected] REVIEW: FBC 2017 6TH EDITION
  
 PLUMBING COMMENTS:
  
 1. PLEASE PROVIDE PLUMBING FIXTURE COUNT BREAK DOWN
 WITH OCCUPANT LOAD FOR EACH AREA PER OCCUPANT TYPE ON
 THE 1ST + 2ND FLOOR, THE ONE THAT WAS ON SHT. GN-1 IS
 CONFUSING UNDER THE BUSINESS OCCUPANCY IT LIST REQUIRED
 2 TOILETS FOR MEN AND WOMEN PROVIDED 1 TOILET THAT
 SEEMS LESS THE REQUIRED AMOUNT. PLEASE CLARIFY PER WPB
 AMEND TO FBC 107.2.1
  
 2. IF THE COVERED ENTRY CANOPY HAS A PARAPET THAT WOULD
 CAUSING WATER TO POND UP IF THE MAIN STORM DRAIN GOT
 CLOGGED AN OVERFLOW DRAIN OR SCUPPER WILL BE REQUIRED.
 PER FBC PL 1108.1
  
 3. 3. SHT. A-406-A DETAIL #1 NOTES AN ADA TRANSFER TUB
 BUT IT SHOWS ROLLS IN SHOWER PLEASE CLARIFY. PER WPB
 AMEND TO FBC 107.2.1
  
 4. SHT. A-407, 408, 409 DETAIL #1, A THE END OF THE
 GRAB BAR ON THE SIDE WALL OF THE TOILET SHALL BE A MIN.
 OF 54? OFF THE REAR WALL IT IS SHOWN AT 48? PLEASE
 CHECK ALL DETAILS SHOWING THE SIDE WALL GRAB BAR. PER
 FBC ACC 604.5.1
  
 5. SHT. A-407, 408, 409, PLEASE SHOW THE DEPTH
 DIMENSION OF THE STANDARD TOILET STALL. PER FBC PL
 405.3.1
  
 6. SHT. A-407, 408, 409, 414 DETAIL B, C, F THE GRAB
 BARS SHALL BE SHOWN TO BE MEASURED FROM FINISHED FLOOR
 TO THE TOP OF THE GRIPPING SURFACE THEY ARE SHOWN
 MEASURED 36? TO THE CENTER OF THE BAR IF INSTALLED THIS
 WAY THEY WILL NOT BE CODE COMPLIANT PLEASE CHECK ALL
 DETAILS. PER FBC ACC 609.4
  
 7. SHT. A-407, 408, 409, 414 DETAILS E, C, B, THE RIM
 OF THE LAVATORY IS SHOWN OVER 34? IT SHALL BE 34
 MAX PLEASE CHECK ALL DETAILS. PER FBC ACC 606.3
  
 8. SHT. A 414 PLEASE SHOW THE REQUIRED CLEAR FLOOR
 SPACE FOR THE TRANSFER SHOWER. PER FBC ACC 608.2.1
  
 9. SHT. A 414 THE SEAT IN THE TRANSFER SHOWER SHALL BE
 WITHIN 3? OF THE FRONT OF THE SHOWER. PER FBC ACC 610.3
  
 10. SHT. A 414 PLEASE SHOW COMPLIANCE WITH SHOWER
 CONTROLS AND SPAY UNIT. PER FBC ACC 608.5.1
  
 11. SHT. 417 DETAIL # 1, H, D THE END OF THE GRAB BAR
 ON THE SIDE WALL OF THE TOILET SHALL BE A MIN. OF 54?
 OFF THE REAR WALL IT IS SHOWN AT 48? PLEASE CHECK ALL
 DETAILS SHOWING THE SIDE WALL GRAB BAR. PER FBC ACC
 604.5.1
  
 12. SHT. 417 DETAIL #C, D,E,H THE GRAB BARS SHALL BE
 SHOWN TO BE MEASURED FROM FINISHED FLOOR TO THE TOP OF
 THE GRIPPING SURFACE THEY ARE SHOWN MEASURED 36? TO THE
 CENTER OF THE BAR IF INSTALLED THIS WAY THEY WILL NOT
 BE CODE COMPLIANT PLEASE CHECK ALL DETAILS. PER FBC ACC
 609.4
  
 13. SHT. A-4.15 PLEASE SHOW COMPLIANCE FOR THE WARMING
 KITCHEN SINK SHALL COMPLY WITH FBC ACC 606.2 AND 606.3
  
 14. SHT. P-102 SANITARY PIPE NOT SHOWN FOR COMMON
 BATHROOMS ON 2ND FLOOR PLEASE CLARIFY. PER WPB AMEND TO
 FBC 107.2.1
  
 15. SHT P-104 SHOWS A TRANSFER TUB FOR ROOM 1009 THE
 ACCESSIBLE ROOM MATRIX LIST ROLLS IN SHOWER FOR ROOM
 1009 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 16. THE HOT WATER PIPING AND RECERC PIPING SHALL BE 1?
 WALL THICKNESS. PER FBC ENERGY C404.4
  
 17. SHT. P-601 CONDENSING WATER HEATER SCHEDULE IS
 BLANK PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 18. SHT. P-503 THE WATER HEATER PIPING DETAIL SHOWS THE
 COLD SUPPLY CONNECTING TO THE INLET OF THE STORAGE TANK
 IT SHALL CONNECT TO INTAKE OF THE BOILER. PER
 MANUFACTURE INSTALL GUIDE
  
 19. PROVIDE SE (SESCO) SOVENT TITE RUFF DESIGN MANUAL.
 PER WPB AMEND TO FBC 107.2.1
  
 20. PROVIDE A PLAN REVIEW AND APPROVAL OF THE SE
 (SESCO) TITE RUFF SOVENT SYSTEM FOR THIS PROJECT. PER
 FBC PL 316.1.3
  
 21. PLEASE PROVIDE EXPANDED SANITARY AND WATER
 ISOMETRICS FOR THE COMMON AREA BATHROOMS AND KITCHEN ON
 THE 1ST AND 2ND FLOOR. PER WPB AMEND TO FBC
 107.3.5.1.3(13)
  
 22. PLEASE PROVIDE SIZING CALCULATIONS FOR THE GREASE
 INTERCEPTOR. PER FBC PL 1003.2
  
 23. P- 701 IT APPEARS THAT THE VENT FOR THE COMMON
 BATHROOMS ARE CONNECTING TO THE SOVENT AERATORS THIS
 DOES NOT COMPLY WITH SOVENT DESIGN MANUAL VENTS FROM
 CONVENTIONAL SYSTEMS SHALL VENT SEPARATELY THROUGH THE
 ROOF OR CONNECT SEPARATELY TO THE SOVENT STACK.
  
 24. SHT. A-0.01 THE SHEET INDEX LIST A STORM ISOMETRIC
 IT IS MISSING FROM SUBMITTED DRAWINGS, IN THE PRE
 SUBMITTAL MEETING WE WERE TOLD THE EXISTING STORM WAS
 TO REMAIN IF THIS IS STILL THE CASE PLACE NOTE ON PLAN
 AND PROVIDE DRAWINGS WITH DETAILS FOR COVERED ENTRY
 ROOF DRAINS. PLEASE CLARIFY PER WPB AMEND TO FBC
 107.3.5.1.3(13)
  
 25. SHT. P 701 THE ISOMETRIC DRAWING IS TO CONGESTED TO
 DETERMINE CODE COMPLIANCE FOR CLARIFICATION JUST SHOW
 PIPING FOR 1ST AND 2ND FLOOR WITH THE STACKS LABEL TO
 MATCH THE FLOOR PLAN AND STACKS ON SHT. P-702. PER WPB
 AMEND TO FBC 107.3.5.1.3(13)
  
 26. PLEASE SIZE THE PIPING AND LABEL THE FIXTURES ON
 THE SANITARY AND WATER ISOMETRIC DRAWINGS SHTS. P-701,
 702, 703, 704. PER WPB AMEND TO FBC 107.3.5.1.3(13)
  
 27. SHT. P 703 THE ISOMETRIC DRAWING IS TO CONGESTED TO
 DETERMINE CODE COMPLIANCE FOR CLARIFICATION JUST SHOW
 PIPING FOR 1ST AND 2ND FLOOR WITH THE STACKS LABEL TO
 MATCH THE FLOOR PLAN AND STACKS ON SHT. P-704. PER WPB
 AMEND TO FBC 107.3.5.1.3(13)
  
 28. SHT. P-503 DETAIL #2 AND THE GAS WATER HEATER
 DIRECT VENT COMBUSTION DETAIL SHOW TWO DIFFERENT VENT
 AND INTAKE SYSTEMS PLEASE PROVIDE A SIT SPECIFIC
 VENTING DETAIL. PER WPB AMEND TO FBC 107.2.1
  
 29. THE POOL BATHROOMS SHALL COMPLY WITH FBC PL 403.6
  
 30. SANITARY PIPING OVER THE KITCHEN AREA SHALL BE
 SHIELDED TO INTERCEPT POTENTIAL DRIPS OR LEAKS. PER US
 FOOD CODE
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  