Date |
Text |
2018-02-08 09:30:56 | RESIDENTIAL (R3) ALTERATION, BUILDING REVIEW COMMENTS. |
| CODE: FBC 6TH EDITION (2017). |
| |
| 1- PROPOSED INSTALLATION IS NOT CLEAR. DRAWING #2 OF 10 |
| OF FLORIDA PRODUCT APPROVAL FL12856-R6 SUBMITTED SHOWS |
| AN "H" HEADER AND "F" TRACK CIRCLED AS THE PROPOSED |
| INSTALLATION, WHILE DRAWING #3 OF 10 SHOWS "DIRECT |
| MOUNT SECTION CIRCLED WITH NO "H" HEADER OR "F" TRACK |
| INSTALLATION. REVISE AS REQUIRED TO MATCH TO VERIFY |
| PROPOSED INSTALLATION. NOTE: CONNECTION TYPES ARE |
| DIFFERENT FOR EACH DIFFERENT APPLICATION. THAT'S WHY IS |
| IMPORTANT TO KNOW THE EXACT PROPOSED INSTALLATION. SEC. |
| 107.2.1 CITY AMENDMENTS. |
| |
| 2- INSTALLATION SCHEDULE SPECIFIES CONCRETE BLOCK AS |
| THE SUBSTRATE WHERE THE STORM PANELS ARE GOING TO BE |
| INSTALLED. BUT, ANCHOR SCHEDULE ON SHEET #8 OF 10 OF |
| FLORIDA PRODUCT APPROVAL SUBMITTED SHOWS ANCHOR |
| SCHEDULE CIRCLED FOR CONCRETE SUBSTRATE. REVISE AS |
| REQUIRED. NEED TO USE THE ANCHOR SCHEDULE FOR CONCRETE |
| BLOCK AND REVISE ANCHOR TYPE, SPACING AND EDGE DISTANCE |
| ACCORDINGLY. OR, PROVIDE PROOF THAT THE SUBSTRATE IS |
| CONCRETE WITH THE STRENGTH REQUIRED BY THE CONCRETE |
| ANCHOR SCHEDULE. SEC. 107.2.1 CITY AMENDMENTS. |
| |
| 3- CLARIFY WHY THE INSTALLATION SCHEDULE SUBMITTED |
| INDICATES THAT SHUTTERS ARE GOING TO BE INSTALLED |
| HORIZONTALLY IF BASED ON THE SHUTTER SPAN SHOWN, IT |
| LOOKS LIKE THE PANELS ARE GOING TO BE INSTALLED |
| VERTICALLY NOT HORIZONTALLY. REVISE AS REQUIRED. SEC. |
| 107.2.1 CITY AMENDMENTS. |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| (561)805-6712 |
| [email protected] |