Plan Review Notes For Permit 18011134 |
Permit Number |
18011134 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-02-05 06:38:52 | 1) SUBMIT TWO LEGIBLE COPIES OF THE COMPLETE | | INSTALLATION MANUAL FOR THE FIRST STAGE REGULATOR. | | IDENTIFY ON THE MANUAL THE SPECIFIC MODEL OF THE | | REGULATOR BEING INSTALLED. 2017 FBC-FUEL GAS SEC.305.1, | | WPB AMEND. TO FBC SEC. 107.2.1. | | 2) SUBMIT 2 COPIES OF THE COMPLETE INSTALLATION MANUAL | | FOR THE SECOND STAGE REGULATOR. IDENTIFY ON THE MANUAL | | THE SPECIFIC MODEL OF THE REGULATOR BEING INSTALLED. | | 2017 FBC-FUEL GAS SEC.305.1, WPB AMEND. TO FBC SEC. | | 107.2.1. | | 3) SUBMIT THE MANUFACTURER'S SPECIFICATIONS FOR THE | | GENERATOR TO CONFIRM THE BTU LOAD. 2017 FBC-FUEL GAS | | SEC.402.2. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | |
|