Plan Review Notes For Permit 18011120 |
Permit Number |
18011120 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-02-02 06:35:02 | 1) SUBMIT MANUFACTURING SPECIFICATIONS FOR THE | | GENERATOR.WPB AMEND. TO FBC SEC. 107.2.1. | | 2) THE UNDERGROUND TANK IS SHOWN IN THE MIDDLE OF | | DRIVEWAY ON THE SURVEY. INDICATE HOW THE LP TANK IS | | GOING TO BE PROTECTED FROM DAMAGE. PROTECTION SHALL BE | | PROVIDED IN ACCCORDANCE WITH 2014 NFPA 58 SEC.6.6.6.1 | | (E). | | NFPA 58 - 6.6.6.1* ASME CONTAINER ASSEMBLIES INTENDED | | FOR UNDERGROUND INSTALLATION, INCLUDING INTERCHANGEABLE | | ABOVEGROUND ? UNDERGROUND CONTAINER ASSEMBLIES, SHALL | | BE INSTALLED UNDERGROUND IN ACCORDANCE WITH 6.6.6.1(A) | | THROUGH 6.6.6.1(M). | | (E) THE INSTALLATION OF A BURIED CONTAINER SHALL | | INCLUDE PROTECTION | | FOR THE CONTAINER AND PIPING AGAINST PHYSICAL DAMAGE | | FROM VEHICULAR TRAFFIC. | | 3) INDICATE HOW THE FIRST STAGE REGULATOR IS GOING TO | | BE VENTED WHEN THE TANK IS IN THE MIDDLE OF THE | | DRIVEWAY.THE VENT SHALL COMPLY WITH NFPA 58 SEC. | | 6.6.6.1 ( H) - THE DISCHARGE OF THE REGULATOR VENT | | SHALL BE ABOVE THE | | HIGHEST PROBABLE WATER LEVEL. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | | | |
|