Plan Review Notes For Permit 18011037 |
Permit Number |
18011037 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2018-02-20 14:01:26 | DENIED | | | | 1) GENERAC COMPLIES WITH THE NFPA (37) SEC 4.1.4 AND | | HAS CHANGED GUIDELINES FOR INSTALLATION OF THE | | GENERATOR YOU ARE INSTALLING TO 18 INCHES FROM THE BACK | | SIDE OF THE GENERATOR TO A STATIONARY WALL OR BUILDING | | AND NO WINDOWS OR OPENING IN THE WALL ARE PERMITTED | | WITHIN 5 FEET FROM ANY POINT OF THE GENERATOR. THE | | SPECIFICATION FOR THE MANUAL YOU SUMMITED IS FROM | | 12/4/15 AND IT IS OUTDATED, PLEASE SUBMIT THE UPDATED | | ONES FROM 9/15/17 WHICH HAVE THE ABOVE CLEARANCES | | SPECIFIED. WPB AMENDMENTS TO THE FBC SEC. 107.2.1 | | INFORMATION ON CONSTRUCTION DOCUMENTS. | | | | 2) THE APPLICABLE SIZING TABLES USED TO SIZE THE GAS | | ARE NOT THE 2017 FBC FG CODE, PLEASE PROVIDE UPDATED | | SHEETS TO REFLECT THE WORK BEING DONE. WPB AMENDMENTS | | TO THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION | | DOCUMENTS. | | | | LUIS A. CRESPO | | PLUMBING INSPECTOR / | | PLUMBING PLAN REVIEW | | [email protected] | | 561-805-6720 | | |
|