Plan Review Notes
Plan Review Notes For Permit 18010982
Permit Number 18010982
Review Stop G
Sequence Number 1
Notes
Date Text
2018-01-29 05:42:2701/29/2018 PLUMBING AND GAS 1ST REVIEW**DENIED**
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
  
 1) THE JOB COST MUST INCLUDE ALL LABOR AND MATERIAL TO
 INCLUDE THE NEW EQUIPMENT. PROVIDE BONA-FIDE SIGNED
 CONTRACT AND MATERIAL COST OF EQUIPMENT. FBC 109.3
  
 2) TYPE OF GAS (LP OR NATURAL). FBC 107.2.
  
 3) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2014
 FBC-FUEL GAS CODE SEC.304.1, 614.5 (CLOTHES DRYERS) OR
 2014 FBC-RES. SEC. G 2407.1 AND G2439.4 (CLOTHES
 DRYERS). SUBMIT COMBUSTION AIR CALCULATIONS FOR THE
 ADDED GAS APPLIANCES. WHERE COMBUSTION AIR IS PROVIDED
 BY THE BUILDING?S MECHANICAL VENTILATION SYSTEM, THE
 SYSTEM SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE
 IN ADDITION TO THE REQUIRED VENTILATION AIR. FGC
 SEC.304.9.3 OR FBCR G2407.9.3.
  
  
 4) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES.
 SEC. G2413.2.
  
 5) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1
  
 6) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE
 LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION
 AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN
 RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER
 HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND
 DRAWN. WPB AMEND. TO FBC SEC. 107.2.1
  
 7) INDICATE ON THE PLAN IF THE TANKLESS WATER HEATER IS
 REPLACING AN EXISTING TANKLESS WATER HEATER OR IS IT
 REPLACING A STORAGE TANK TYPE WATER HEATER OR IS IT
 BEING ADDED TO THE EXISTING HOT WATER SYSTEM? INDICATE
 ON THE APPLICATION IN THE DESCRIPTION OF WORK. FBC
 107.2.1
  
 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 FBC-FUEL
 GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2412.4,
 G2412.8, G2413.1, G2413.2, & G2413.3.
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]