Date |
Text |
2019-03-28 08:54:17 | 1ST REVIEW FBC-2014 MECHANICAL |
| PERMIT #17121018 |
| 410 N. ROSEMARY |
| 3/27/2019 |
| |
| CODES IN EFFECT: |
| FBC B- FLORIDA BUILDING CODE FIFTH EDITION 2014 |
| FBC M- FLORIDA MECHANICAL CODE FIFTH EDITION 2014 |
| FBC EC- FLORIDA ENERGY CONSERVATION CODE FIFTH EDITION |
| 2014 |
| FBC FG- FLORIDA FUEL GAS CODE FIFTH EDITION 2014 |
| FS- FLORIDA STATUTES |
| FAC- FLORIDA ADMINISTRATIVE CODE |
| WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| EDITION 2014 |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| THE MECHANICAL PLANS HAVE FAILED FOR THE DEFICIENCIES |
| AND OMISSIONS LISTED NUMERICALLY BELOW. PLEASE REVIEW |
| ALL COMMENTS, INCLUDING THOSE LISTED FOR ADVISORY |
| PURPOSES, AND RESUBMIT CORRECTED PLANS AND REQUIRED |
| DOCUMENTS. WHEN RESUBMITTING, PLEASE PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. |
| PRIOR TO MECHANICAL PERMIT ISSUANCE, THE GENERAL |
| CONTRACTOR AND MECHANICAL SUB-CONTRACTOR FOR THE |
| PROJECT ARE REQUESTED TO ATTEND A MEETING AT THE WPB |
| BUILDING DEPARTMENT WITH THE STAFF- CHIEF MECHANICAL |
| INSPECTOR, PLANS EXAMINER, AND OTHERS- TO DISCUSS |
| TIMELINES AND GUIDELINES FOR INSPECTIONS AND THE |
| DOCUMENT SUBMITTAL PROCESS . FURTHER INFORMATION WILL |
| FOLLOW ONCE ALL PLANS ARE APPROVED. |
| |
| 1) SUBMIT AC COOLING AND HEATING CALCULATIONS- SECTION |
| C403.2.1 FBC EC: DESIGN LOADS ASSOCIATED WITH HEATING, |
| VENTILATING AND AIR CONDITIONING OF THE BUILDING SHALL |
| BE DETERMINED IN ACCORDANCE WITH ANSI/ASHRAE/ACCA |
| STANDARD 183 OR ACCA MANUAL N OR BY AN APPROVED |
| EQUIVALENT COMPUTATIONAL PROCEDURE USING THE DESIGN |
| PARAMETERS SPECIFIED IN CHAPTER 3. HEATING AND COOLING |
| LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD REDUCTIONS |
| THAT ARE ACHIEVED WHERE ENERGY RECOVERY SYSTEMS ARE |
| UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE WITH THE |
| ASHRAE HVAC SYSTEMS AND EQUIPMENT HAND-BOOK BY AN |
| APPROVED EQUIVALENT COMPUTATIONAL PROCEDURE. DESIGN |
| LOADS SHALL BE ATTACHED TO THE CODE COMPLIANCE FORM |
| SUBMITTED TO THE BUILDING DEPARTMENT WHEN THE BUILDING |
| IS PERMITTED OR, IN THE EVENT THE MECHANICAL PERMIT IS |
| OBTAINED AT A LATER TIME, THE SIZING CALCULATION SHALL |
| BE SUBMITTED WITH THE APPLICATION FOR THE MECHANICAL |
| PERMIT. |
| |
| 2) SUBMIT AN ENERGY COMPLIANCE REPORT - SECTION C401.2 |
| FBC EC. COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF |
| THE FOLLOWING: |
| 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1, |
| EXCLUDING SECTION 9.4.1.1(G) OF THE STANDARD. |
| 2. THE REQUIREMENTS OF SECTIONS C402 THROUGH C405. IN |
| ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY WITH |
| SECTION C406 AND TENANT SPACES SHALL COMPLY WITH |
| SECTION C406.1.1. |
| 3. THE REQUIREMENTS OF SECTIONS C402.5, C403.2, C404, |
| C405.2, C405.3, C405.5, C405.6 AND C407. THE BUILDING |
| ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85 PERCENT |
| OF THE STANDARD REFERENCE DESIGN BUILDING. |
| PLEASE REVIEW SECTION C101.5.1 FBC EC: THE FLORIDA |
| BUILDING COMMISSION SHALL APPROVE SPECIFIC COMPUTER |
| SOFTWARE. THE CODE OFFICIAL SHALL BE PERMITTED TO |
| APPROVE WORKSHEETS, COMPLIANCE MANUALS AND OTHER |
| SIMILAR MATERIALS THAT MEET THE INTENT OF THIS CODE. |
| |
| 3) COMMISSIONING OF THE MECHANICAL AND SERVICE WATER |
| HEATING SYSTEMS IS REQUIRED PER SECTION 508.2 FBC EC. |
| PLEASE SUBMIT A COMMISSIONING PLAN PER SECTION |
| C408.2.1: |
| A COMMISSIONING PLAN SHALL BE DEVELOPED BY A LICENSED |
| DESIGN PROFESSIONAL, ELECTRICAL ENGINEER, MECHANICAL |
| ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE |
| FOLLOWING ITEMS: |
| 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL |
| BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING, |
| INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF |
| THE ACTIVITIES. |
| 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR |
| SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO |
| BE PERFORMED. |
| 3. FUNCTIONS TO BE TESTED INCLUDING, BUT NOT LIMITED |
| TO, CALIBRATIONS AND ECONOMIZER CONTROLS. |
| 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED. |
| TESTING SHALL AFFIRM WINTER AND SUMMER DESIGN |
| CONDITIONS AND FULL OUTSIDE AIR CONDITIONS. |
| 5. MEASURABLE CRITERIA FOR PERFORMANCE' |
| REFER TO SECTIONS C408.2.4, C408.2.5, AND C408.2.5.4 |
| FOR PRELIMINARY AND FINAL REPORT REQUIREMENTS AND |
| SUBMITTALS. PLEASE NOTE THAT A FINAL REPORT SHALL BE |
| SUBMITTED TO THE BUILDING?S OWNERSHIP AND A COPY OF |
| THAT REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL |
| FOR FINAL MECHANICAL INSPECTION APPROVAL AND CO OF THE |
| BUILDING. |
| |
| 4) DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS |
| SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| FOR REVIEW BY THE BUILDING OFFICIAL. |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. |
| PLEASE REVIEW THE FOLLOWING LIST AND PROVIDE A LIST ON |
| THE PLANS OR UPLOAD THE LIST IN DOCUMENT FORM. |
| |
| REQUIRED SUBMITTALS LISTED BELOW SHALL HAVE SHOP |
| DRAWING STAMPS BY THE EOR AND BE IN THE FIELD AT TIME |
| OF INSPECTION. |
| A) FIRE DAMPERS AND FIRE/SMOKE DAMPERS. |
| B) MOTORIZED AND BAROMETRIC DAMPERS |
| C) DUCT SMOKE DETECTORS |
| D) EXHAUST FANS |
| E) LOUVERS FOR EXHAUST AND OUTSIDE AIR INTAKES |
| INCLUDING MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT |
| APPROVALS AND/OR MIAMI-DADE NOA'S |
| F) AC STAND NOA?S OR FL. PRODUCT APPROVALS |
| G) DUCT FIRE WRAPPING |
| H) CLOTHES DRYERS INCLUDING THE VENTLESS DRYERS IN THE |
| SUITES S. |
| I) COOKING APPLIANCES AND EXHAUST HOODS IN THE COMMON |
| AREAS AND THE SUITES. (RESTAURANT KITCHEN UNDER |
| SEPARATE PERMIT, NOT INCLUDED).JI) BATHROOM AND LAUNDRY |
| EXHAUST TERMINATION CAPS |
| SUBMITTALS TO BE PROVIDED TO THE BUILDING DEPARTMENT |
| FOR REVIEW. |
| A) SIGNED AND SEALED STRUCTURAL ENGINEERING FOR |
| INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND |
| APPLIANCES. ALTERNATELY, SIGNED AND SEALED, OR |
| DELEGATED ENGINEERING MAY BE AVAILABLE ONSITE AT THE |
| TIME OF INSPECTION. PLEASE NOTE THAT DELEGATED |
| ENGINEERING SHALL BEAR THE SHOP DRAWING STAMP OF THE |
| STRUCTURAL ENGINEER RECORD. |
| B) GENERATORS AND FUEL TANKS AND ALL ASSOCIATED |
| EQUIPMENT, VENT FLUES, AND FUEL OIL PIPING. |
| C) BOILERS AND WATER HEATERS INCLUDING COMBUSTION AIR |
| DUCTS AND VENT FLUES. |
| D) COMMISSIONING REPORTS |
| |
| 5) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR KITCHEN |
| EXHAUST HOODS, FIRE SUPPRESSION SYSTEMS, AND WALK-IN |
| COOLERS AND FREEZERS. |
| REGARDING THE KITCHEN EXHAUST, THE FOLLOWING CODE |
| SECTIONS MAY IMPACT THE HVAC DESIGN FOR THE MAIN |
| BUILDING. |
| A) SECTION 508.1.2 FBC M AIR BALANCE: DESIGN PLANS FOR |
| A FACILITY WITH A COMMERCIAL KITCHEN VENTILATION SYSTEM |
| SHALL INCLUDE A SCHEDULE OR DIAGRAM INDICATING THE |
| DESIGN OUTDOOR AIR BALANCE. THE DESIGN OUTDOOR AIR |
| BALANCE SHALL INDICATE ALL EXHAUST AND REPLACEMENT AIR |
| FOR THE FACILITY, PLUS THE NET EXFILTRATION IF |
| APPLICABLE. THE TOTAL REPLACEMENT AIR AIRFLOW RATE |
| SHALL EQUAL THE TOTAL EXHAUST AIRFLOW RATE PLUS THE NET |
| EXFILTRATION. B) SECTION 508.1.1 MAKEUP AIR |
| TEMPERATURE: THE TEMPERATURE DIFFERENTIAL BETWEEN |
| MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE SHALL |
| NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT WHERE THE |
| ADDED HEATING AND COOLING LOADS OF THE MAKEUP AIR DO |
| NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM. |
| C) SECTION 506.3.13: EXHAUST TERMINATION LOCATIONS AND |
| CLEARANCE REQUIREMENTS ETC. |
| |
| 6) M1.00 & A1.04: THE O/A INTAKE FOR AHU-1 & 2 SHALL BE |
| A MINIMUM 10' FROM THE PROPERTY LINE- SECTION 401.4 (1) |
| FBC M. THE LOCATION IS NOT IN COMPLIANCE. |
| |
| 7) M1.00 & A.900: FIRE DAMPERS SHALL BE INSTALLED IN |
| THE LOUVERED DOOR OPENINGS AT THE STORAGE, PUMP, FIRE |
| PUMP, AND BOILER ROOMS- SECTION 607.5.2 FBC M. |
| |
| 8) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS |
| PENETRATING THE FIRE-RATED WALLS AT THE LUGGAGE, FCC, |
| AND MAIN MECHANICAL ROOM WALLS- SECTION 607.5.2 FBC M. |
| |
| 9) M1.00 & A.900: FIRE DAMPERS MISSING FOR DUCTS |
| PENETRATING THE FIRE-RATED WALLS AT THE CONFERENCE |
| ROOM- SECTION 607.5.2 FBC M. A) PLEASE INCLUDE THE FR |
| DIFFUSERS IN THE SCHEDULE ON SHEET M10.00. |
| |
| 10) M1.00 & A.900: FIRE DAMPER MISSING FOR THE 20X14 |
| DUCT PENETRATING THE FIRE-RATED BAR ROOM WALL- SECTION |
| 607.5.2 FBC M. |
| |
| 11) M1.00: CU-1 AND CU-2 ARE OUTDOOR CONDENSING UNITS |
| WHICH MUST BE INSTALLED IN ACCORDANCE WITH THEIR |
| LISTING AND LABELING- SECTION 304.1 FBC M. |
| |
| 12) M1.00: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| RETURN AIR SYSTEMS OF AHU-1 & 2- SEE SECTION 606.2.1 |
| FBC M. |
| |
| 13) M1.00: PLEASE PROVIDE AN EQUIPMENT SCHEDULE AND |
| LAYOUT PLAN FOR THE KITCHENETTE- SEE SECTION 917 FBC M |
| COOKING APPLIANCES. |
| |
| 14) M.100: EXHAUST VENTILATION IS REQUIRED FOR THE |
| KITCHENETTE AT A RATE OF 25 CFMS CONTINUOUS OR 100 CFMS |
| INTERMITTENT. CLARIFY IF AN EXHAUST HOOD WILL BE |
| INSTALLED- SEE SECTION 506 FBC M. |
| |
| 15) M1.00, BOILER: A) A FULL REVIEW OF THE BOILER AND |
| ROOM CANNOT BE PERFORMED WITHOUT MORE INFORMATION ABOUT |
| THE BOILER INCLUDING AN EQUIPMENT SCHEDULE AND TYPE OF |
| POWER- GAS OR ELECTRIC. PLEASE NOTE THAT GAS FIRED |
| BOILERS REQUIRE GAS PIPING PLANS, AND COMBUSTION AIR |
| AND VENTING PLANS AND CALCULATIONS- SECTIONS 304, 402 |
| AND 503 FBC FG. |
| |
| 16) M1.00: PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE |
| AIR HANDLERS- SECTION 307.2.1 FBC M. |
| |
| 17) M1.00 & M1.0A- EMERGENCY GENERATOR: |
| A) THE RADIATOR EXHAUST SHALL DISCHARGE DIRECTLY OR BE |
| DUCTED TO THE OUTDOORS- SECTION 7.7.4.2 NFPA-110-2016. |
| B) THE ENGINE EXHAUST PIPE SHALL DISCHARGE OUTSIDE OF |
| THE STRUCTURE PER SECTIONS 8.2.3.1 NFPA 37-2015, AND |
| SECTION 501.3 FBC M. |
| C) EF-3 SHALL DISCHARGE TO THE OUTDOORS- SECTION 501.3 |
| FBC M. A) INDICATE HOW THE FAN WAS SIZED- PROVIDE AN |
| EXHAUST VENTILATION CALCULATION. |
| D) EF-3 SHALL RUN CONTINUOUSLY AND NOT BE CONTROLLED BY |
| THE THERMOSTAT- SECTIONS 4.1.2.1.3 & 6.3.6.5.1 NFPA 37, |
| AND SECTION 502.4.2 FBC M. |
| E) REFER TO SECTION 7.7.1 NFPA 110- 2016 AND VERIFY |
| THAT THE VENTILATION AIRFLOW IN THE GENERATOR/TANK |
| (EPS) ROOM IS DESIGNED TO LIMIT THE MAXIMUM AIR |
| TEMPERATURE IN THE ROOM TO THE MAXIMUM AMBIENT AIR |
| TEMPERATURE REQUIRED BY THE GENERATOR MANUFACTURER. |
| CONSIDERATION SHALL BE GIVEN TO ALL THE HEAT EMITTED TO |
| THE ROOM BY THE ENERGY CONVERTER, EXHAUST PIPES, AND |
| ALL OTHER HEAT PRODUCING EQUIPMENT- SECTION 7.7.1.1. |
| DESIGN OF THE HEATING, COOLING, AND VENTILATION SYSTEM |
| SHALL AMONG OTHER THINGS, INCLUDE PROVISIONS FOR |
| FACTORS SUCH AS HEAT, COLD, HUMIDITY, LOUVERS, ETC.- |
| SECTION 7.7.7. |
| F) THE LOUVERED AIR INTAKE OPENING INTO THE PARKING |
| GARAGE IS PROHIBITED PER SECTION 7.7.3 NFPA 110 WHICH |
| REQUIRES VENTILATION AIR TO BE TAKEN FROM THE OUTDOORS. |
| IN ADDITION PLEASE NOT THAT A FIRE DAMPER WOULD BE |
| REQUIRED IN THE LOUVERED OPENING, HOWEVER DAMPERS ARE |
| NOT PERMITTED IN VENTILATION OPENINGS INTO THE ROOM- |
| SECTION 7.7.2.3 NFPA 110. |
| G) VERIFY THAT THE GENERATOR IS CLASSIFIED AS A LEVEL 1 |
| PER SECTION 4.4 NFPA 110, AND PROVIDE THE UL 2200 |
| CERTIFICATE OF COMPLIANCE- SECTION 915.1 FBC M. |
| H) PLEASE PROVIDE A CLEARER COPY OF THE FUEL TANK |
| DIAGRAM AND SPECIFICATIONS- SECTION 107.2.1 WPB. |
| |
| 18) M2.00: THE O/A INTAKES FOR AHU-6 & 7, AND THE |
| LAUNDRY ROOM MAKEUP AIR SHALL BE A MINIMUM 10' FROM THE |
| PROPERTY LINE- SECTION 401.4 (1) FBC M. THE LOCATIONS |
| ARE NOT IN COMPLIANCE. |
| |
| 19) M2.00: THE EXHAUST OUTLET FOR THE POOL EXHAUST |
| SYSTEM SHALL BE A MINIMUM 10' FROM THE PROPERTY LINE- |
| SECTION 501.3.1 (2) FBC M. THE LOCATION IS NOT IN |
| COMPLIANCE. |
| |
| 20) M2.00: VERIFY THE BOTTOM OF SF-1 IS A MINIMUM 8' |
| ABOVE THE FINISHED GARAGE FLOOR- SECTION 394.6 FBC M. |
| |
| 21) M2.00: FIRE DAMPER MISSING AT THE 20X20 DUCT |
| PENETRATION FROM AHU-6 THROUGH THE FIRE-RATED MECH |
| RM/GARAGE WALL. |
| |
| 22) M2.00: SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| DRYERS - SECTION 504.6.2 |
| |
| 23) M2.00: VERIFY THE DRYER EXHAUST FAN WILL RUN |
| CONTINUOUSLY OR BE INTERLOCKED TO OPERATE WHEN ANY OF |
| THE TWO UNITS ARE OPERATING. A) VERIFY THE MOTOR FOR |
| THE FAN IS LOCATED OUTSIDE OF THE AIRSTREAM. |
| |
| 24) M2.00: PROVIDE EQUIPMENT SCHEDULES AND SUBMIT |
| MANUFACTURER'S SPECIFICATIONS FOR THE BREAKROOM COOKING |
| APPLIANCE AND RECIRCULATING HOOD- SECTIONS 505, 506, |
| AND 917.1 FBC M. |
| |
| 25) M2.00: FIRE DAMPER SHALL BE INSTALLED IN THE |
| LOUVERED DOOR OPENINGS AT THE POOL EQUIPMENT ROOM - |
| SECTION 607.5.2 FBC M. |
| |
| 26) M2.00: A VESTIBULE WILL BE REQUIRED FOR THE POOL |
| EQUIPMENT ROOM IF THE ROOM CONTAINS A FUEL-FIRED POOL |
| HEATER- SECTION 305.3.2 FBC FG. |
| |
| 25) M3.00, M4.00, M6.00, M.700, M9.00, AND M10.00: |
| INDICATE HOW O/A IS BEING PROVIDED TO THE HOTEL ROOMS |
| AND PROVIDE CALCULATIONS- SECTION 401.2 FBC M. NOTE #5 |
| REFERENCES RTU-1 FOR O/A CALCULATIONS FOR THE ROOMS BUT |
| NO CALCS ARE PROVIDED. |
| |
| 26) M9.00: PLEASE INCLUDE THE CORRIDORS IN THE |
| VENTILATION CALCULATIONS- TABLE 403.3.1.1. FBC M. |
| |
| 27) M13.00: NOA #13-1017.09 IS OUTDATED. PLEASE PROVIDE |
| AN UPDATED COPY. PLEASE NOTE THIS MAY BE A DEFERRED |
| SUBMITTAL PER COMMENT #4. |
| |
| 28) M13.00: CLEARANCES UNDER THE CONDENSING UNITS SHALL |
| BE IN ACCORDANCE WITH TABLE 1509.6.5 FBC B. PLEASE |
| PLACE A NOTE ON THE DETAIL. |
| |
| 29) PROVIDE A COMPLETE CONDENSATE DISPOSAL PLAN FOR ALL |
| THE AIR HANDLERS- SECTION 307.2.1 FBC M. |
| |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| KEEP THEM WITH THE SUBMITTALS |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |
| |
| |