Date |
Text |
2018-08-28 15:37:54 | PERMIT 17 120974 |
| PLUMBING REVIEW SEQUENCE 2 |
| |
| COMMENTS FROM SEQUENCE 1 |
| |
| 1-SHEET P100 NOTE READS "GAS OUTER" |
| RESPONSE: REFER TO SHEET P100 FOR SPELLING REVISION |
| SEQUENCE 2 COMMENT(S): APPROVED |
| |
| 2-SHEET P100 SHOWS WATER SERVICE RUNNING TO BACK OF |
| PROPERTY WHERE THERE IS AN EXISTING HOME NOW; WILL THIS |
| BE DEMOLISHED? PLEASE CLARIFY PER WPB AMEND TO FBC |
| 107.2.1 |
| RESPONSE: EXISTING HOME |
| SEQUENCE 2 COMMENT(S): DENIED. PLEASE SEE REVIEW STOP |
| B-BUILDING, 2ND REVIEW,NOTE 3. RESPONSE BY RPJ TO |
| PLUMBING REVIEW FOR REVIEW 3 NOT REQUIRED |
| |
| 3-SHEET P102 IS MISSING FROM FROM PLAN SET.PLEASE |
| PROVIDE TWO FULL SETS OF PLANS PER WPB AMEND TO FBC |
| 107.2.1 |
| RESPONSE: REFER TO ATTACHED SHEET P102 (FURNISHED REV 1 |
| DATED 6-19-18) |
| SEQUENCE 2 COMMENT(S): STORM PIPING FOR COURTYARD IS |
| NOT SIZED AND SQUARE FOOTAGE IS NOT INDICATED; CORRECT |
| AND RESUBMIT |
| |
| 4-PLEASE LABEL THE BATHROOMS ON THE ISOMETRIC DRAWING |
| PER WPB AMEND TO FBC 107.2.1 |
| RESPONSE: PLEASE REFER TO SHEET P201 |
| SEQUENCE 2 COMMENT(S): SANITARY ISOMETRIC IS LABELED, |
| HOWEVER "POWDER" FOR THE POWDER ROOM IS MISPELLED |
| "POWER"; CORRECT AND RESUBMIT |
| |
| 5-PROVIDE STORM WATER ISOMETRIC PER WPB AMEND TO FBC |
| 107.3.5.3(11) |
| RESPONSE: WPB AMENDMENT ONLY APPLIES TO FBC 2010, NOT |
| 2014. PERMIT DRAWINGS INCLUDE SANITARY, WATER AND GAS |
| PIPING RISERS. STORM DRAINAGE SYSTEM INDICATED IN FLOOR |
| PLANS IS PROPERLY SIZED WITH RESPECTIVE FLOOR AREAS |
| INDICATED. FBC RESIDENTIAL DOES NOT REQUIRE PIPING |
| RISERS. |
| SEQUENCE 2 COMMENT(S): WPB DID NOT ADOPT 2014 BUT |
| ADOPTED 2017 WHEN IT BECAME AVAILABLE, THEREFORE THE |
| 2010 APPLIES TO THE 2014 FBC; CORRECT AND RESUBMIT. |
| |
| 6-SHEET P201; THE TOILET FOR BATHROOM #2 SHALL CONNECT |
| TO THE BATHROOM GROUP WITH THE SHOWER AND LAVATORY PER |
| FBC RES P3108.1 |
| RESPONCE: NOT NOTED ON RPJ LETTER, BUT SHEET P201 HAS |
| BEEN CORRECTLY MODIFIED TO MEET THIS REQUIREMENT |
| SEQUENCE 2 COMMENT(S): SHEET P201 MODIFICATION |
| APPROVED. PLEASE REVISE PLAN VIEW ON SHEET P104 TO |
| REFLECT THE CHANGE. |
| |
| 7-THE VALVES FOR THE STACKABLE WASHING MACHINES SHALL |
| BE ACCESSIBLE PER FBC RES P2803.9.3 |
| RESPONCE: NOT NOTED ON RPJ LETTER, BUT SHEET P201 HAS |
| BEEN CORRECTLY MODIFIED TO MEET THIS REQUIREMENT |
| SEQUENCE 2 COMMENT(S): SHEET P201 MODIFICATION |
| APPROVED. PLEASE ADVISE IF THE APPURTENANCES SHOWN ON |
| THE WATER SUPPLY OUTLETS ON THE WATER RISER DIAGRAM FOR |
| THE WASHING MACHINES, ICE LINES AND DISH WASHERS ARE |
| WATER HAMMER ARRESTORS AS REQUIRED BY RES FBC 2903.5. |
| PLEASE ID THEM ON THE WATER RISER DIAGRAM. |
| |
| SEQUENCE 2 COMMENT(S): NEW ITEM |
| 1-RE: SHEET P103; GAZEBO STORM WATER PING FOR TRENCH |
| DRAIN IS NOT SHOWN. FURNISH PIPING AND SIZING AND |
| RESUBMIT. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| THE PREVIOUSLY REVIEWED SHEETS. |
| |
| JERALD SMITH |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| 561-805-6711 |