2018-06-21 08:57:58 | PLAN |
| REVIEW COMMENTS |
| |
| 3RD REVIEW: FBC FIFTH EDITION (2014) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) THE VALUE OF $9,200.00 STATED ON THE REVISION |
| APPLICATION IS NOT ADEQUATE FOR THE ADDITIONAL SCOPE |
| SPECIFIED ON THE DRAWING THAT WAS SUBMITTED. PROVIDE AN |
| ITEMIZED COST BREAK DOWN FOR THE PROPOSED REVISED SCOPE |
| OF WORK WITH AN ACCURATE TOTAL VALUE. FBC 109.3 |
| BUILDING PERMIT VALUATION. FOR PERMITTING PURPOSES, |
| VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL |
| REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC, |
| PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE |
| WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| |
| 2) COMPLIED. |
| |
| 3) COMPLIED. |
| |
| 4) COMPLIED. |
| |
| 5)THE PRODUCT APPROVAL (NOA NO. 17-1108.23) THAT IS |
| SPECIFIED ON THE PLANS FOR THE EXTERIOR DOORS IS FOR A |
| BI-FOLDING WINDOW. PLEASE REVISE PLANS AND SUBMIT THE |
| PRODUCT APPROVALS FOR THE OUTSWING EXTERIOR DOORS. FBC |
| 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS FOR |
| THOSE PRODUCTS WHICH ARE REGULATED BY FAC 61G20-3.001 |
| PER FLORIDA STATUTE 553.842 (5) THAT HAVE BEEN REVIEWED |
| AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| PROVIDE TWO COMPLETE PRODUCT APPROVALS WITH FL OR NOA |
| NUMBERS INCLUDING INSTALLATION INSTRUCTIONS AND MAXIMUM |
| DESIGN PRESSURES FOR EACH OF THE WINDOW/GLASS TYPES, |
| STRUCTURAL MULLIONS AND EXTERIOR DOOR TYPES. IF THE |
| WINDOWS ARE NOT LARGE MISSILE IMPACT RATED, THEN SUBMIT |
| PRODUCT APPROVALS FOR THE STORM PANELS ALONG WITH A KEY |
| PLAN AND INSTALLATION SCHEDULE. |
| |
| 6) COMPLIED. |
| |
| 7) COMPLIED. |
| |
| 8) COMPLIED. |
| |
| 9) THE APPROVED PLANS WILL NEED TO BE REVIEWED BY PALM |
| BEACH COUNTY TO DETERMINE IF ANY IMPACT FEES ARE DUE. |
| SEE THE IMPACT FEE REVIEW FOR DETAILS. |
| |
| 10) COMPLIED. |
| |
| 11) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT |
| A RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |
| COMMENTS HAS BEEN ADDRESSED. |
| |
| |
| |
| |
| |