2017-12-20 14:43:40 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, |
| FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| PLEASE CONSIDER THE FOLLOWING AS PROVISO: |
| |
| THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED |
| AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE |
| PROVISO COMMENTS WILL RESULT IN A FAILED FIRE |
| INSPECTION. |
| |
| |
| 1) PROVIDE THE MANUFACTURE?S SPECIFICATION CUT SHEETS |
| FOR THIS INSTALLATION ON FIRE FINAL FOR FIRE INSPECTORS |
| REVIEW. |
| |
| PER NFPA 96, |
| |
| 11.2 INSPECTION, TESTING, AND MAINTENANCE OF |
| FIRE-EXTINGUISHING SYSTEMS |
| |
| 11.2.2* ALL ACTUATION AND CONTROL COMPONENTS, INCLUDING |
| REMOTE MANUAL PULL STATIONS, MECHANICAL AND ELECTRICAL |
| DEVICES, DETECTORS, AND ACTUATORS, SHALL BE TESTED FOR |
| PROPER OPERATION DURING THE INSPECTION IN ACCORDANCE |
| WITH THE MANUFACTURER?S |
| PROCEDURES. |
| 11.2.3 THE SPECIFIC INSPECTION AND MAINTENANCE |
| REQUIREMENTS OF THE EXTINGUISHING SYSTEM STANDARDS AS |
| WELL AS THE APPLICABLE INSTALLATION AND MAINTENANCE |
| MANUALS FOR THE LISTED SYSTEM AND SERVICE BULLETINS |
| SHALL BE FOLLOWED. |
| |
| PER NFPA 17A |
| |
| 6.4 APPROVAL OF INSTALLATIONS. THE COMPLETED SYSTEM |
| SHALL BE TESTED BY TRAINED PERSONNEL AS REQUIRED BY THE |
| MANUFACTURER?S LISTED INSTALLATION AND MAINTENANCE |
| MANUAL. |
| 6.4.1 THE TESTS SHALL DETERMINE THAT THE SYSTEM HAS |
| BEEN PROPERLY INSTALLED AND WILL FUNCTION AS INTENDED. |
| 6.4.2* WHERE REQUIRED BY THE AUTHORITY HAVING |
| JURISDICTION, THE APPROVAL TESTS SHALL INCLUDE A |
| DISCHARGE TEST, IN ACCORDANCE WITH THE MANUFACTURER?S |
| LISTED INSTALLATION MANUAL, TO VERIFY THAT THE SYSTEM |
| IS PROPERLY INSTALLED AND FUNCTIONAL. |
| |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |