2017-12-18 10:06:04THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 1) TEST TO ENSURE THE FOLLOWING IS COMPLIANT INCLUDING,
 BUT NOT LIMITED TO, DBA AT THE PILLOW HEIGHT.
  
  
 14.4.1.2* REACCEPTANCE TESTING.
 14.4.1.2.1 REACCEPTANCE TESTING SHALL BE PERFORMED AS
 REQUIRED IN 14.4.1.2.1.1 THROUGH 14.4.1.2.1.4.
 14.4.1.2.1.1 WHEN AN INITIATING DEVICE, NOTIFICATION
 APPLIANCE, OR CONTROL RELAY IS ADDED, IT SHALL BE
 FUNCTIONALLY TESTED.
 14.4.1.2.1.2 WHEN AN INITIATING DEVICE, NOTIFICATION
 APPLIANCE, OR CONTROL RELAY IS DELETED, ANOTHER DEVICE,
 APPLIANCE, OR CONTROL RELAY ON THE CIRCUIT SHALL BE
 OPERATED.
 14.4.1.2.1.3 WHEN MODIFICATIONS OR REPAIRS TO CONTROL
 EQUIPMENT HARDWARE ARE MADE, THE CONTROL EQUIPMENT
 SHALL BE TESTED IN ACCORDANCE WITH TABLE 14.4.2.2,
 ITEMS 1(A) AND 1(D).
 14.4.1.2.1.4 WHEN CHANGES ARE MADE TO SITE-SPECIFIC
 SOFTWARE, THE FOLLOWING SHALL APPLY:
 (1) ALL FUNCTIONS KNOWN TO BE AFFECTED BY THE CHANGE,
 OR IDENTIFIED BY A MEANS THAT INDICATES CHANGES, SHALL
 BE 100 PERCENT TESTED.
 (2) IN ADDITION, 10 PERCENT OF INITIATING DEVICES THAT
 ARE NOTDIRECTLY AFFECTED BY THE CHANGE, UP TO A MAXIMUM
 OF 50 DEVICES, ALSO SHALL BE TESTED AND CORRECT SYSTEM
 OPERATION SHALL BE VERIFIED.
 (3) AREVISED RECORD OF COMPLETION IN ACCORDANCE WITH
 10.18.2.1 SHALL BE PREPARED TO REFLECT THESE CHANGES.
 14.4.1.2.2 CHANGES TO ALL CONTROL UNITS CONNECTED OR
 CONTROLLED BY THE SYSTEM EXECUTIVE SOFTWARE SHALL
 REQUIRE A 10 PERCENT FUNCTIONAL TEST OF THE SYSTEM,
 INCLUDING A TEST OF AT LEAST ONE DEVICE ON EACH INPUT
 AND OUTPUT CIRCUIT TO VERIFY CRITICAL SYSTEM FUNCTIONS
 SUCH AS NOTIFICATION APPLIANCES, CONTROL FUNCTIONS, AND
 OFF-PREMISES REPORTING.
 14.4.2* TEST METHODS.
 14.4.2.1* AT THE REQUEST OF THE AUTHORITY HAVING
 JURISDICTION, THE CENTRAL STATION FACILITY INSTALLATION
 SHALL BE INSPECTED FOR COMPLETE INFORMATION REGARDING
 THE CENTRAL STATION SYSTEM, INCLUDING SPECIFICATIONS,
 WIRING DIAGRAMS, AND FLOOR PLANS THAT HAVE BEEN
 SUBMITTED FOR APPROVAL PRIOR TO INSTALLATION OF
 EQUIPMENT AND WIRING.
 14.4.2.2* SYSTEMS AND ASSOCIATED EQUIPMENT SHALL BE
 TESTED ACCORDING TO TABLE 14.4.2.2.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709