Date |
Text |
2018-01-04 08:05:41 | 2ND REVIEW: FBC 2014 5TH EDITION |
| |
| PLUMBING COMMENTS: PREVIOUS COMMENTS NOT COMPLIED WITH. |
| I SUGGEST A MEETING BE SET UP TO EXPEDITE APPROVAL OF |
| THIS REVISION MY CONTACT INFO IS BELOW. |
| |
| 1. THE APPROVED SET OF DRAWINGS WAS SIGNED AND SEALED |
| BY DESIGN PROFESSIONAL ANY REVISIONS SHALL BE SIGNED |
| AND SEALED BY THE SAME DESIGN PROFESSIONAL. PER WPB |
| AMEND TO FBC 107.2 AND FS 61G15-23.003 |
| |
| 2. PLEASE PROVIDE REVISED FLOOR PLAN SHT. P.1. PER WPB |
| AMEND TO FBC 107.2.1 |
| |
| NEW COMMENT: |
| |
| 1. PER FBC FG TABLE 402.4(2) YOUR DEVELOPED LENGTH |
| WOULD BE ROUNDED UP TO 30' AND MAX BTU LOAD FOR 1" PIPE |
| IS 374,000 WHICH MAKES YOUR FIRST SECTION OF PIPE |
| UNDERSIZED. IT SHALL BE 11/4" TO ALLOW FOR A BTU LOAD |
| OVER 374,000. |
| |
| 2. ON THE ORIGINAL SET OF PLANS IT SHOWS THE TANKLESS |
| HEATER WITH A MAX BTU LOAD OF 199,000 THE REVISED |
| DRAWING SHOWS IT AT 190,000. PLEASE PROVIDE THE |
| MANUFACTURE SPECIFICATIONS OF ALL THE GAS APPLIANCES TO |
| MORE ACCURATELY CALCULATE THE BTU LOAD OF THE SYSTEM. |
| PER WPB AMEND TO FBC 107.2.1 |
| |
| 3. PROVIDE A RISER DIAGRAM THAT SHOWS THE LENGTH OF OF |
| EACH CUT SECTION OF PIPE TO MORE ACCURATELY CALCULATE |
| THE BTU LOAD OF THE SYSTEM. PER WPB AMEND TO FBC |
| 107.2.1 |
| |
| |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| THE PREVIOUSLY REVIEWED SHEETS. |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| 561-805-6711 |
| [email protected] |
| |