2018-06-27 11:30:10 | TCO PROPOSED SEPARATION REVIEW |
| |
| THE FOLLOWING IS AN UNOFFICIAL REVIEW BASED ON THE |
| LIMITED PLAN SUBMITTAL SHEET. |
| |
| THE FIRE PREVENTION BUREAU DOES NOT HAVE AN OBJECTION |
| TO A PROPOSED TCO; HOWEVER, THE FOLLOWING COMMENTS WILL |
| NEED TO BE ADDRESSED AND OFFICIAL PLANS WILL NEED TO BE |
| SUBMITTED FOR REVIEW AND APPROVAL. |
| |
| THIS REVIEW DOES NOT GRANT APPROVAL TO OCCUPY ANY SPACE |
| OR AREA. |
| |
| |
| 1) SHEET A 13.1 - PROVIDE AN OUT OF SERVICE, OOS, SIGN |
| AT ELEVATOR # 2. |
| |
| |
| |
| 2) SHEET 13.1 - THERE ARE TWO STATEMENTS INDICATED AT |
| EACH SIDE OF THE SHADED CONSTRUCTION AREAS, "CONTROLLED |
| ACCESS TO CONSTRUCTION AREA. |
| |
| PLEASE PROVIDE A DETAILED EXPLANATION/DESCRIPTION OF |
| WHAT THIS STATMENT MEANS AND HOW WILL COMPLY WITH THE |
| LIFE SAFETY CODE ON TWO POINTS. |
| |
| HOW WILL THE GENERAL PUBLIC/OFFICE STAFF BE PROTECTED |
| FROM ENETERING THE CONSTRUCTION AREAS? |
| |
| HOW WILL THESE AREAS PROVIDE FOR EXITING OF |
| CONSTRUCTION WORKERS IN THE EVENT OF EMERGENCY? |
| |
| |
| |
| |
| 3) SHEET A 13.2 - PROVIDE A DETAILED EXPLANATION ON HOW |
| EACH STAIRWELL DOOR TO THE CONSTRUCTION AREAS BE |
| SECURED FROM THE CONSTRUCTION AREA ON TWO POINTS? |
| |
| HOW WILL THE GENERAL PUBLIC/OFFICE STAFF BE PROTECTED |
| FROM ENETERING THE CONSTRUCTION AREAS? |
| |
| HOW WILL THESE AREAS PROVIDE FOR EXITING OF |
| CONSTRUCTION WORKERS IN THE EVENT OF EMERGENCY? |
| |
| |
| |
| 4) SHEET A 13.2 - PROVIDE A DETAILED EXPLANATION ON HOW |
| THE ELEVATOR WILL BE CONTROLLED TO NOT LET PEOPLE OFF |
| AT THE 2ND FLOOR CONSTRUCTION AREA. |
| |
| |
| |
| 5) SHEET A 13.2 - PROVIDE PROVIDE AN OUT OF SERVICE, |
| OOS, SIGN AT ELEVATOR # 2. |
| |
| |
| |
| 6) SHEET A 13.3 - ELEVATOR # 2 IS NOT SHADED AND SHALL |
| HAVE A OOS SIGN IN PLACE. |
| |
| |
| 7) SHEET A 13.3 - THE IS AN ACCESS STAIR INDICATED TO |
| THE 4TH FLOOR. THERE IS NO 4TH FLOOR PLAN ATTACHED. |
| |
| PROVIDE A DETAILED EXPLANATION REGARDING THE 4TH FLOOR |
| USE AND PROVIDE ALL APPLICABLE PLAN SHEETS OR |
| CONTROLLED CONSTRUCTION AREA. |
| |
| |
| 8) ALL LIFE SAFETY SYSTEMS, FIRE ALARM AND FIRE |
| SPRINKLER, SHALL BE FULLY OPERATIONAL, TESTED AND |
| APPROVED THROUGH REVISED SHOP DRAWINGS, PRIOR TO ANY |
| OCCUPANCY. |
| |
| THE LIFE SAFETY SYSTEMS SHALL BE MAINTAINED AND |
| OPERATIONAL ALL ALL TIMES DURING THE TCO PHASE. |
| |
| ANY TIME EITHER SYSTEM IS DOWN FOR MORE THAN 4 HOURS |
| YOU ARE REQUIRED TO CONDUCT A FIRE WATCH UNTIL IT IS |
| FULLY OPERATIONAL. |
| |
| PLEASE REVIEW AND PROVIDE AN NOTE OF COMPLIANCE AND |
| ACKNOWLEDGEMENT. |
| |
| |
| 9) PROVIDE DETAILED RESPONSES TO ALL OTHER CITY |
| DISCIPLINE COMMENTS WITH APPROVAL. |
| |
| |
| 10) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |
| |
| |
| |