2018-01-25 12:50:28 | 2ND REVIEW FBC-2014 MECHANICAL |
| PERMIT #17120042 |
| 1/25/18 |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| 1) COMMENTS #2, 3, 4, & 5 FROM THE 1ST REVIEW STILL |
| EXIST. THE REVISED ENERGY AND AC CALCULATIONS WERE NOT |
| SUBMITTED-, AND THE SYSTEM RISER DIAGRAM WAS NOT |
| CORRECTED. SEE BELOW: |
| |
| (2) THE ENERGYGAUGE COMPLIANCE REPORT IS LISTING DATA |
| FOR ZONES AND AHU IDENTIFICATIONS THAT DO NOT MATCH |
| WITH THE PLANS- THERE ARE NO ZONES SHOWN ON THE PLANS, |
| AND THE AHU'S SHOWN ON THE PLANS ARE LABELED 1-1, 1-2, |
| 2-1, 2-2, 3-1, 3-2, AND 4-1. |
| |
| (3) THE AC CALCULATIONS ARE INDICATING THAT THE SYSTEMS |
| SELECTED (AS SHOWN ON THE ENERGY CALCULATIONS ) ARE |
| OVERSIZED- SEE SECTION C403.2.2 FBC-14 ENERGY |
| CONSERVATION. |
| |
| (4) THE ENERGY REPORT IS MISSING COMPLIANCE DATA FOR |
| THE CHILLER, THE 3-TON MINI SPLIT SYSTEM, AND THE |
| PIPING SYSTEM. |
| |
| (5) M7.2: THE SYSTEM RISER DIAGRAM SHOWS TWO CHILLERS, |
| TWO ERV'S, AND WFC SYSTEMS THAT ARE NOT SHOWN ON THE |
| PLANS - PLEASE CLARIFY. |
| |
| 2) REGARDING THE MAKEUP AIR TRANSFER DUCTS FROM THE |
| CORRIDORS TO THE REST ROOMS, PLEASE SEE SECTION 601.2 |
| EXCEPTION 1 AND PROVIDE CALCULATIONS TO VERIFY |
| COMPLIANCE. |
| |
| 3) M0.1 & M6.3: THE EXHAUST AIR CALCULATION TABLE SHOWS |
| A TOTAL OF 300 CFMS OF EXHAUST AIR PROVIDED, HOWEVER |
| THE EF SCHEDULE SHOWS A TOTAL OF 2500 CFMS PROVIDED. |
| |
| 4) COMMENT #7 FROM THE 1ST REVIEW STILL EXISTS. THE |
| REVISED PLANS DO NOT CLARIFY IF ALL OF THE VAV'S |
| SHARING THE COMMON RETURN AIR PLENUMS WILL SHUT DOWN IF |
| A SMOKE DETECTOR ACTIVATES. PLEASE REVIEW THE EXCEPTION |
| LISTED UNDER SECTION 606.2.2. |
| |
| 606.2.2 COMMON SUPPLY AND RETURN AIR SYSTEMS. |
| WHERE MULTIPLE AIR-HANDLING SYSTEMS SHARE COMMON SUPPLY |
| OR RETURN AIR DUCTS OR PLENUMS WITH A COMBINED DESIGN |
| CAPACITY GREATER THAN 2,000 CFM (0.9 M3/S), THE RETURN |
| AIR SYSTEM SHALL BE PROVIDED WITH SMOKE DETECTORS IN |
| ACCORDANCE WITH SECTION 606.2.1. |
| |
| EXCEPTION: INDIVIDUAL SMOKE DETECTORS SHALL NOT BE |
| REQUIRED FOR EACH FAN-POWERED TERMINAL UNIT, PROVIDED |
| THAT SUCH UNITS DO NOT HAVE AN INDIVIDUAL DESIGN |
| CAPACITY GREATER THAN 2,000 CFM (0.9 M3/S) AND WILL BE |
| SHUT DOWN BY ACTIVATION OF ONE OF THE FOLLOWING: |
| |
| 1. SMOKE DETECTORS REQUIRED BY SECTIONS 606.2.1 AND |
| 606.2.3. |
| |
| 2. AN APPROVED AREA SMOKE DETECTOR SYSTEM LOCATED IN |
| THE RETURN AIR PLENUM SERVING SUCH UNITS. |
| |
| 3. AN AREA SMOKE DETECTOR SYSTEM AS PRESCRIBED IN THE |
| EXCEPTION TO SECTION 606.2.1. |
| |
| IN ALL CASES, THE SMOKE DETECTORS SHALL COMPLY WITH |
| SECTIONS 606.4 AND 606.4.1. |
| |
| 5) THE SUBMITTALS FOR THE FIRE DAMPER AND FIRESTOPPING |
| ARE VERY POOR COPIES THAT HAVE LARGE AMOUNTS OF PRINT |
| AND DIAGRAMS MISSING- PLEASE PROVIDE GOOD COPIES. |
| |
| 6) REGARDING THE REQUEST FOR THE WIND LOAD ENGINEERING |
| TO BA DEFERRED SUBMITTAL PLEASE REVIEW THE FOLLOWING: |
| |
| 1) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS. |
| FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| NOT SUBMITTED AT THE TIME OF THE |
| APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| REVIEW BY THE BUILDING OFFICIAL. |
| |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| OFFICIAL. |
| 2) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT |
| APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE |
| DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN |
| WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| FOR JURISDICTIONAL APPROVAL. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| KEEP THEM WITH THE SUBMITTALS. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |