Date |
Text |
2018-05-27 16:05:14 | ****PROVISOS**** |
| |
| SAMANTHA HILL |
| BUILDING PLANS EXAMINER |
| [email protected] |
| 561-805-6724 |
| |
| FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) |
| FBC B = FBC BUILDING |
| FBC R = FBC RESIDENTIAL |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| |
| A. THIS PARCEL IS LOCATED IN A SPECIAL FLOOD HAZARD |
| AREA; FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT |
| APPLICATION 1979 FIRMS + 1' FREEBOARD; MINIMUM |
| ELEVATION = 8.0' NGVD29, PROPOSED LOWEST FINISHED FLOOR |
| ELEVATION = 9.0' NGVD29 |
| A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS |
| RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS |
| (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT |
| ISSUANCE) |
| A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE |
| OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE |
| POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW |
| A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS |
| REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR |
| TCO. |
| |
| B. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE |
| FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS |
| SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF |
| RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR |
| PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS, |
| STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS |
| REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW |
| AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION. |
| |
| COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH |
| PRESSURES SHOWN ON SHEET S0.0.5) |
| |
| C. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE |
| REQUIRED FOR: |
| LIGHT POLES/SITE LIGHTING |
| FIRE ALARM |
| FIRE SPRINKLER |
| LOW VOLTAGE |
| ACCESS |
| LANDSCAPING |
| IRRIGATION |
| ALL OTHER ITEMS OTHER THAN BMEP |
| |
| D. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A |
| PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL. |
| |
| E. AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED |
| PRIOR TO C.O. |
| |
| F. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE |
| SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE |
| ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED |
| PRIOR TO CONCRETE POUR. |
| |
| G. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS |
| REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION. |
| |
| |