Plan Review Notes
Plan Review Notes For Permit 17110857
Permit Number 17110857
Review Stop B
Sequence Number 3
Notes
Date Text
2018-05-27 16:05:14****PROVISOS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
  
 A. THIS PARCEL IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA; FLOOD MAP IN EFFECT AT TIME OF FOUNDATION PERMIT
 APPLICATION 1979 FIRMS + 1' FREEBOARD; MINIMUM
 ELEVATION = 8.0' NGVD29, PROPOSED LOWEST FINISHED FLOOR
 ELEVATION = 9.0' NGVD29
 A "CONSTRUCTION DRAWING" ELEVATION CERTIFICATE IS
 RECOMMENDED AT THIS TIME TO AVOID FUTURE DELAYS
 (CORRECTIONS, IF APPLICABLE, WILL NOT DELAY PERMIT
 ISSUANCE)
 A "BUILDING UNDER CONSTRUCTION" ELEVATION CERTIFICATE
 OR FORM BOARD SURVEY IS REQUIRED PRIOR TO CONCRETE
 POUR. THIS MAY BE SENT VIA EMAIL FOR PRELIMINARY REVIEW
 A "FINISHED CONSTRUCTION" ELEVATION CERTIFICATE IS
 REQUIRED PRIOR TO FINAL INSPECTION AND/OR CO AND/OR
 TCO.
  
 B. DEFERRED SUBMITTALS REQUESTED BY ARCHITECT, SEE
 FOLLOWING LIST (MAY NOT BE A COMPLETE LIST); DOCUMENTS
 SHOWING COMPLIANCE ARE TO BE REVIEWED BY DESIGNER OF
 RECORD PRIOR TO SUBMITTAL (ARCHITECT OR ENGINEER FOR
 PRODUCT APPROVALS AND OTHER SPECIFICATION DOCUMENTS,
 STRUCTURAL ENGINEER OF RECORD APPROVAL AND REVIEW IS
 REQUIRED FOR DELEGATED ENGINEERING). SUBMITTAL, REVIEW
 AND APPROVAL ARE REQUIRED PRIOR TO INSTALLATION.
  
 COMPONENT & CLADDING PRODUCT APPROVALS (COMPLY WITH
 PRESSURES SHOWN ON SHEET S0.0.5)
  
 C. SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE
 REQUIRED FOR:
 LIGHT POLES/SITE LIGHTING
 FIRE ALARM
 FIRE SPRINKLER
 LOW VOLTAGE
 ACCESS
 LANDSCAPING
 IRRIGATION
 ALL OTHER ITEMS OTHER THAN BMEP
  
 D. PROVIDE THE RECORDED PLAT WHEN FINALIZED; EITHER A
 PDF VIA EMAIL OR ADVISE BOOK AND PAGE NUMBER VIA EMAIL.
  
 E. AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED
 PRIOR TO C.O.
  
 F. SHORING/RESHORE ENGINEERING IS REQUIRED TO BE
 SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE
 ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED
 PRIOR TO CONCRETE POUR.
  
 G. A CONSTRUCTION GUARD RAIL ENGINEERED DETAIL IS
 REQUIRED TO BE PROVIDED PRIOR TO INSTALLATION.
  
  