Plan Review Notes
Plan Review Notes For Permit 17110425
Permit Number 17110425
Review Stop B
Sequence Number 2
Notes
Date Text
2018-05-29 18:12:54PLAN
 REVIEW COMMENTS
 2ND REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) NEW COMMENT: THE SITE DRAINAGE PLAN C-1, THAT WAS
 SUBMITTED DOES NOT MATCH THE SIDE SET BACKS ON THE
 PROPOSED SITE PLAN THAT WAS APPROVED BY ZONING ON
 5/18/18.
 SUBMIT TWO SETS OF A DRAINAGE PLAN WITH ELEVATIONS TO
 SHOW COMPLIANCE WITH FBC-R401.3. SURFACE DRAINAGE SHALL
 BE DIVERTED TO A STORM SEWER CONVEYANCE OR OTHER
 APPROVED POINT OF COLLECTION THAT DOES NOT CREATE A
 HAZARD. LOTS SHALL BE GRADED TO DRAIN SURFACE WATER
 AWAY FROM FOUNDATION WALLS. THE GRADE SHALL FALL A
 MINIMUM OF 6 INCHES (152 MM) WITHIN THE FIRST 10 FEET
 (3048 MM). EXCEPTION: WHERE LOT LINES, WALLS, SLOPES OR
 OTHER PHYSICAL BARRIERS PROHIBIT 6 INCHES (152 MM) OF
 FALL WITHIN 10 FEET (3048 MM), DRAINS OR SWALES SHALL
 BE CONSTRUCTED TO ENSURE DRAINAGE AWAY FROM THE
 STRUCTURE. IMPERVIOUS SURFACES WITHIN 10 FEET (3048 MM)
 OF THE BUILDING FOUNDATION SHALL BE SLOPED A MINIMUM OF
 2 PERCENT AWAY FROM THE BUILDING.
 THIS INFORMATION IS REQUIRED ON THE SITE PLAN PER FBC
 107.2.5 SITE PLAN.
  
 2) COMPLIED.
  
 3) COMMENT NOT ADDRESSED TO SATISFACTION. I AM IN
 RECEIPT OF YOUR RESPONSE TO MY COMMENT ABOUT THE UPLIFT
 FOR THE (2) SIMPSON HETAL 20 ANCHORS NOT HAVING AN
 UPLIFT OF 3600 LBS. I AGREE THAT A HETA NAD A HETAL
 STRAP ARE NOT THE SAME. THE HETAL HAS A SEAT AND THE
 HETA DOES NOT. IF YOU LOOK IN THE ANCHOR TABLE ON PAGE
 291 OF THE 2017 SIMPSON CATALOG YOU WILL SEE THAT THEY
 BOTH HAVE THE SAME UPLIFT VALUE OF 1810 LBS. THE SEAT
 ONLY PROVIDES ADDITIONAL LATERAL LOADS. IF YOU READ
 NOTE #8 THAT IS LISTED ON THE RIGHT SIDE OF THE TABLE
 IT STATES THAT THE MINIMUM SPACING FOR MULTIPLE ANCHOR
 INSTALLATION IS 2 TIMES THE EMBEDMENT DEPTH FOR FULL
 LOAD AND REFERS YOU TO THE DOUBLE EMBEDDED ANCHOR
 SCHEDULE FOR LOADS ON CLOSER SPACED ANCHORS. THE EMBED
 DEPTH FOR THESE ANCHORS IS 5-1/16" WHICH REQUIRES THEM
 TO BE SPACED 10-1/8" APART TO GET THE FULL UPLIFT LOAD.
 IN THE GROUT FILLED CONCRETE MASONRY UNIT BOND BEAMS
 SPECIFIED ON THE PLANS (2) HETA ANCHORS WILL PROVIDE
 2,035 LBS OF UPLIFT CAPACITY ON A SINGLE TRUSS AND
 2,500 LBS OF UPLIFT CAPACITY ON A 2 OR 3 PLY TRUSS.
 ON SHEET 4 - 4 OF THE PLANS, THE ROOF FRAMING PLAN
 SPECIFIES (2) SIMPSON HETAL 20 ANCHORS FOR THE GIRDER
 TRUSS WITH AN UPLIFT OF 3600 LBS. THIS IS NOT CORRECT.
 THE SIMPSON CATALOG HAS AN UPLIFT LOAD CAPACITY OF 2700
 LBS. FOR (2) HETA ANCHORS ON A TWO PLY TRUSS. PLEASE
 CORRECT.
  
 4) NEED COPY OF THE PAID IMPACT FEE RECEIPT. SEE IMPACT
 FEE REVIEW.
  