Date |
Text |
2018-05-29 18:12:54 | PLAN |
| REVIEW COMMENTS |
| 2ND REVIEW: FBC FIFTH EDITION (2014) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) NEW COMMENT: THE SITE DRAINAGE PLAN C-1, THAT WAS |
| SUBMITTED DOES NOT MATCH THE SIDE SET BACKS ON THE |
| PROPOSED SITE PLAN THAT WAS APPROVED BY ZONING ON |
| 5/18/18. |
| SUBMIT TWO SETS OF A DRAINAGE PLAN WITH ELEVATIONS TO |
| SHOW COMPLIANCE WITH FBC-R401.3. SURFACE DRAINAGE SHALL |
| BE DIVERTED TO A STORM SEWER CONVEYANCE OR OTHER |
| APPROVED POINT OF COLLECTION THAT DOES NOT CREATE A |
| HAZARD. LOTS SHALL BE GRADED TO DRAIN SURFACE WATER |
| AWAY FROM FOUNDATION WALLS. THE GRADE SHALL FALL A |
| MINIMUM OF 6 INCHES (152 MM) WITHIN THE FIRST 10 FEET |
| (3048 MM). EXCEPTION: WHERE LOT LINES, WALLS, SLOPES OR |
| OTHER PHYSICAL BARRIERS PROHIBIT 6 INCHES (152 MM) OF |
| FALL WITHIN 10 FEET (3048 MM), DRAINS OR SWALES SHALL |
| BE CONSTRUCTED TO ENSURE DRAINAGE AWAY FROM THE |
| STRUCTURE. IMPERVIOUS SURFACES WITHIN 10 FEET (3048 MM) |
| OF THE BUILDING FOUNDATION SHALL BE SLOPED A MINIMUM OF |
| 2 PERCENT AWAY FROM THE BUILDING. |
| THIS INFORMATION IS REQUIRED ON THE SITE PLAN PER FBC |
| 107.2.5 SITE PLAN. |
| |
| 2) COMPLIED. |
| |
| 3) COMMENT NOT ADDRESSED TO SATISFACTION. I AM IN |
| RECEIPT OF YOUR RESPONSE TO MY COMMENT ABOUT THE UPLIFT |
| FOR THE (2) SIMPSON HETAL 20 ANCHORS NOT HAVING AN |
| UPLIFT OF 3600 LBS. I AGREE THAT A HETA NAD A HETAL |
| STRAP ARE NOT THE SAME. THE HETAL HAS A SEAT AND THE |
| HETA DOES NOT. IF YOU LOOK IN THE ANCHOR TABLE ON PAGE |
| 291 OF THE 2017 SIMPSON CATALOG YOU WILL SEE THAT THEY |
| BOTH HAVE THE SAME UPLIFT VALUE OF 1810 LBS. THE SEAT |
| ONLY PROVIDES ADDITIONAL LATERAL LOADS. IF YOU READ |
| NOTE #8 THAT IS LISTED ON THE RIGHT SIDE OF THE TABLE |
| IT STATES THAT THE MINIMUM SPACING FOR MULTIPLE ANCHOR |
| INSTALLATION IS 2 TIMES THE EMBEDMENT DEPTH FOR FULL |
| LOAD AND REFERS YOU TO THE DOUBLE EMBEDDED ANCHOR |
| SCHEDULE FOR LOADS ON CLOSER SPACED ANCHORS. THE EMBED |
| DEPTH FOR THESE ANCHORS IS 5-1/16" WHICH REQUIRES THEM |
| TO BE SPACED 10-1/8" APART TO GET THE FULL UPLIFT LOAD. |
| IN THE GROUT FILLED CONCRETE MASONRY UNIT BOND BEAMS |
| SPECIFIED ON THE PLANS (2) HETA ANCHORS WILL PROVIDE |
| 2,035 LBS OF UPLIFT CAPACITY ON A SINGLE TRUSS AND |
| 2,500 LBS OF UPLIFT CAPACITY ON A 2 OR 3 PLY TRUSS. |
| ON SHEET 4 - 4 OF THE PLANS, THE ROOF FRAMING PLAN |
| SPECIFIES (2) SIMPSON HETAL 20 ANCHORS FOR THE GIRDER |
| TRUSS WITH AN UPLIFT OF 3600 LBS. THIS IS NOT CORRECT. |
| THE SIMPSON CATALOG HAS AN UPLIFT LOAD CAPACITY OF 2700 |
| LBS. FOR (2) HETA ANCHORS ON A TWO PLY TRUSS. PLEASE |
| CORRECT. |
| |
| 4) NEED COPY OF THE PAID IMPACT FEE RECEIPT. SEE IMPACT |
| FEE REVIEW. |
| |