2018-03-13 05:41:16 | 1) THERE ARE TWO DIFFERENT GAS DRAWINGS IN THIS |
| SUBMITTAL PACKAGE. ONE SHOWS AN EXISTING GAS SYSTEM AND |
| GAS METER TO WHICH THE GAS LINE FOR THE GENERATOR IS |
| CONNECTED AND THE OTHER SHOWS A NEW GAS METER DEDICATED |
| TO THE GENERATOR. IN ADDITION, THE GAS PERMIT |
| APPLICATION DESCRIPTION OF WORK STATES "TIE INTO |
| EXISTING NG METER FOR GENERATOR INSTALL." ALSO, THE |
| RESPONSE LETTER FROM APS STATES THAT THIS IS A NEWW |
| NATURAL GAS LINE FROM THE METER TO THE GENERATOR ONLY. |
| NO OTHER APPLIANCES ARE ON THIS LINE WITH THE |
| GENERATOR. AT THIS POINT, I HAVE NO IDEA WHAT IS BEING |
| DONE OR HOW DUE TO THE CONFLICTING PLANS AND |
| INFORMATION THAT HAS BEEN SUBMITTED. CLARIFY. |
| 2) REMOVE ALL OLD PLANS AND DOCUMENTS FROM THIS |
| SUBMITTAL AND SUBMIT TWO COMPLETE SETS OF PLANS THAT |
| CLEARLY REFLECT THE SCOPE OF PROPOSED WORK TO BE DONE. |
| WPB AMEND. TO FBC SEC. 107.1, 107.2.1. |
| 3) THE REGULATOR SPECIFICATIONA THAT HAVE BEEN |
| SUBMITTED ARE FOR SERVICE REGULATORS WHICH ARE |
| INSTALLED BY THE GAS SUPPLIER. ARE YOU USING THESE AS |
| THE 2ND STAGE REGULATOR AT THE GENERATOR? CLARIFY. |
| 4) SHEET P1 IS BECOMING DIFFICULT TO READ IN AREAS WITH |
| SMALL PRINTING. SUBMIT TWO COPIES OF A CLEAR AND |
| LEGIBLE PLAN. WPB AMEND. TO FBC SEC. 107.2.1. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |