Plan Review Notes For Permit 17101263 |
Permit Number |
17101263 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2017-11-06 10:24:23 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | | | 1. DELEGATED ENGINEERING IS TO BE REVIEWED BY | | STRUCTURAL ENGINEER OF RECORD PRIOR TO SUBMITTAL, FBC | | 107. | | | | 2. DELEGATED ENGINEER CANNOT REDUCE DESIGN PRESSURES, | | SEE SHEET S3 PREPARED BY ONM&J. EITHER DELEGATED | | ENGINEER IS TO REVISE PLAN TO MEET PRESSURES SPECIFIED | | BY SEOR, OR SEOR IS TO REVISE SHEET S3. | | | | 3. A ROOF PRODUCT APPROVAL WAS SUBMITTED. THIS IS TO BE | | REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL, FBC | | 107. NOTE THAT IT IS PREFERABLE FOR THIS TO BE | | SUBMITTED WITH THE ROOF PERMIT APPLICATION. AT SOME | | POINT (PREFERABLY WITH THE PRODUCT APPROVAL SUBMISSION) | | RAS117 CALCULATIONS PREPARED BY A DESIGN PROFESSIONAL | | (IF REQUIRED) AND ASSEMBLY PROPOSED IS REQUIRED. THIS | | CAN BE DONE AT ANY TIME, BUT REQUIRED BEFORE ISSUANCE | | OF ROOF SUB PERMIT OR COMMENCEMENT OF ANY ROOF | | (COVERING) WORK. | | | | PAGES 13 - 15 OF THE NOA WERE HIGHLIGHTED. THIS | | INCLUDES TWO DIFFERENT ASSEMBLIES; ARE BOTH PROPOSED? | | ALSO INDICATE WHICH FASTENING OPTION IS PROPOSED. RAS | | 117 CALCULATIONS ARE REQUIRED FOR ALL OPTIONS. | | | | | | | | |
|