Date |
Text |
2017-11-21 12:11:46 | 1ST REVIEW: FBC 2014 5TH EDITION |
| |
| PLUMBING COMMENTS: |
| |
| 1. PLEASE SHOW CLEAR FLOOR SPACE FOR THE TOILET, URINAL |
| AND LAVATORY. PER FBC ACC 604.3.1, 605.3 AND 606.2 |
| |
| 2. PLEASE SHOW COMPLIANCE WITH FBC ACC 603.3 MIRRORS. |
| MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS SHALLL |
| BE INSTALLED WITH THE BOTTOM EDGE OF THE REFLECTING |
| SURFACE 40 INCHES (1015 MM) MAXIMUM ABOVE THE FINISH |
| FLOOR OR GROUND. MIRRORS NOT LOCATED ABOVE LAVATORIES |
| OR COUNTERTOPS SHALL BE INSTALLED WITH THE BOTTOM EDGE |
| OF THE REFLECTING SURFACE 35 INCHES (890 MM) MAXIMUM |
| ABOVE THE FINISH FLOOR OR GROUND. |
| |
| 3. PLEASE SHOW COMPLIANCE WITH FBC ACC 609.4 POSITION |
| OF GRAB BARS. |
| GRAB BARS SHALL BE INSTALLED IN A HORIZONTAL POSITION, |
| 33 INCHES MINIMUM AND 36 INCHES MAXIMUM ABOVE THE |
| FINISH FLOOR MEASURED TO THE TOP OF THE GRIPPING |
| SURFACE. |
| |
| 4. PLEASE SHOW COMPLIANCE WITH FBC ACC 604.7 |
| DISPENSERS. |
| TOILET PAPER DISPENSERS SHALL COMPLY WITH 309.4 AND |
| SHALL BE 7 INCHES MINIMUM AND 9 INCHES MAXIMUM IN FRONT |
| OF THE WATER CLOSET MEASURED TO THE CENTERLINE OF THE |
| DISPENSER. |
| |
| 5. PLEASE SHOW COMPLIANCE WITH FBC ACC 604.5.1 SIDE |
| WALL. |
| THE SIDE WALL GRAB BAR SHALL BE 42 INCHES LONG MINIMUM, |
| LOCATED 12 INCHES (305 MM) MAXIMUM FROM THE REAR WALL |
| AND EXTENDING 54 INCHES MINIMUM FROM THE REAR WALL. |
| |
| 6. SHT. A2.1 DETAIL 8 AND 5 SHOWS LAVATORY RIM AT 35" |
| OF FINISH FLOOR IT SHALL BE 34". PER FBC ACC 606.3 |
| |
| 7. PLEASE LIST APPLICABLE CODES. PER WPB AMEND TO FBC |
| 107.2.1 |
| |
| 8. PLEASE PROVIDE A BREAK DOWN OF OCCUPANT LOAD. PER |
| WPB AMEND TO FBC 107.2.1 |
| |
| 9. HOT WATER SYSTEM SHALL COMPLY WITH FBC PL 607.2 HOT |
| OR TEMPERED WATER SUPPLY TO FIXTURES. |
| THE DEVELOPED LENGTH OF HOT OR TEMPERED WATER PIPING, |
| FROM THE SOURCE OF HOT WATER TO THE FIXTURES THAT |
| REQUIRE HOT OR TEMPERED WATER, SHALL NOT EXCEED 50 FEET |
| . RECIRCULATING SYSTEM PIPING AND HEAT-TRACED PIPING |
| SHALL BE CONSIDERED TO BE SOURCES OF HOT OR TEMPERED |
| WATER. |
| |
| 10. THE WATER FILTER SHOWN ON SHT. K 2.0 DETAIL P.1 IS |
| NOT SHOWN ON WATER PIPE RISER PLEASE CLARIFY. PER WPB |
| AMEND TO FBC 107.2.1 |
| |
| 11. A BACKFLOW IS REQUIRED ON SUPPLY TO ICE MACHINE |
| WATER FILTER AND BEVERAGE DISPENSERS AND COFFEE |
| MACHINES. PER FBC PL 608.3, 608.16.1 AND 608.16.10 |
| |
| 12. ONLY FIXTURES THAT PRODUCE GREASEY WASTE SHALL |
| DISCHARGE THROUGH A GREASE INTERCEPTOR LIKE KITCHEN AND |
| FOOD PREP AREA AND MOP SIN, THE FIXTURES IN BAR AREA |
| SHALL NOT DISCHARGE THROUGH THE GREASE INTERCEPTOR. PER |
| FBC PL 1003.2 |
| |
| 13. LAVATORY'S SHALL COMPLY WITH FBC PL 416.5 TEMPERED |
| WATER FOR PUBLIC HAND-WASHING FACILITIES. |
| TEMPERED WATER SHALL BE DELIVERED FROM LAVATORIES AND |
| GROUP WASH FIXTURES LOCATED IN PUBLIC TOILET FACILITIES |
| PROVIDED FOR CUSTOMERS, PATRONS AND VISITORS. TEMPERED |
| WATER SHALL BE DELIVERED THROUGH AN APPROVED |
| WATER-TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE |
| 1070 OR CSA B125.3. |
| |
| 14. P;LEASE SHOW ICE MACHINE ON WATER RISER. PER WPB |
| AMEND TO FBC 107.2.1 |
| |
| 15. THE FIXTURE COUNT SHAL COMPLY WITH FBC PL 403.1.3 |
| POTTY PARITY. |
| IN ASSEMBLY OCCUPANCIES, RESTROOMS WHICH ARE OPEN TO |
| THE PUBLIC MUST HAVE A RATIO OF 3:2 WATER CLOSETS |
| PROVIDED FOR WOMEN AS THE COMBINED TOTAL OF WATER |
| CLOSETS AND URINALS PROVIDED FOR MEN, UNLESS THESE ARE |
| TWO OR FEWER SUCH FIXTURES FOR MEN, IN ACCORDANCE WITH |
| SECTION 553.86, FLORIDA STATUTES. |
| |
| EXCEPTION: THIS SECTION DOES NOT APPLY TO |
| ESTABLISHMENTS LICENSED UNDER CHAPTER 509, FLORIDA |
| STATUTES, IF THE ESTABLISHMENT DOES NOT PROVIDE MEETING |
| OR BANQUET ROOMS WHICH ACCOMMODATE MORE THAN 150 |
| PEOPLE, AND THE ESTABLISHMENT HAS AT LEAST THE SAME |
| NUMBER OF WATER CLOSETS FOR WOMEN AS THE COMBINED TOTAL |
| OF WATER CLOSETS AND URINALS FOR MEN. |
| |
| |
| 16. A TEST PORT IS REQUIRED ON THE DISCHARGE OF GREASE |
| INTERCEPTOR. PER WPB UTILITIES |
| |
| 17. PLEASE PROVIDE SIZING CALCULATIONS FOR THE GREAS |
| INTERCEPTOR. PER WPB AMEND TO FBC 107.2.1 |
| |
| 18. WATER SYSTEM SHALL COMPLY WITH FBC PL 604.9 WATER |
| HAMMER. |
| THE FLOW VELOCITY OF THE WATER DISTRIBUTION SYSTEM |
| SHALL BE CONTROLLED TO REDUCE THE POSSIBILITY OF WATER |
| HAMMER. A WATER-HAMMER ARRESTOR SHALL BE INSTALLED |
| WHERE QUICK-CLOSING VALVES ARE UTILIZED. WATER-HAMMER |
| ARRESTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE |
| MANUFACTURER?S INSTRUCTIONS. WATER-HAMMER ARRESTORS |
| SHALL CONFORM TO ASSE 1010. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| THE PREVIOUSLY REVIEWED SHEETS. |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| 561-805-6711 |
| [email protected] |
| |