2018-05-11 18:55:49 | PLAN |
| REVIEW COMMENTS |
| |
| 3RD REVIEW: FBC FIFTH EDITION (2014) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| NOTE: THE FIRST REVIEW WAS DONE UNDER THE 2017 FBC DUE |
| TO CLERICAL ERROR. |
| DENIED BY MECHANICAL |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) SUBMIT TWO SETS OF EQUIPMENT SIZING CALCULATION. FBC |
| ENERGY CONSERVATION - SECT. R403.7.1 EQUIPMENT SIZING. |
| HEATING AND COOLING EQUIPMENT SHALL BE SIZED IN |
| ACCORDANCE WITH ACCA MANUAL S BASED ON THE EQUIPMENT |
| LOADS CALCULATED IN ACCORDANCE WITH MANUAL J OR OTHER |
| APPROVED HEATING AND COOLING CALCULATION METHODOLOGIES, |
| BASED ON BUILDING LOADS FOR THE DIRECTIONAL ORIENTATION |
| OF THE BUILDING. THE MANUFACTURER AND MODEL NUMBER OF |
| THE OUTDOOR AND INDOOR UNITS (IF SPLIT SYSTEM) SHALL BE |
| SUBMITTED ALONG WITH THE SENSIBLE AND TOTAL COOLING |
| CAPACITIES AT THE DESIGN CONDITIONS DESCRIBED IN |
| SECTION 302.1. THIS CODE DOES NOT ALLOW DESIGNER SAFETY |
| FACTORS, PROVISIONS FOR FUTURE EXPANSION OR OTHER |
| FACTORS WHICH AFFECT EQUIPMENT SIZING. SYSTEM SIZING |
| CALCULATIONS SHALL NOT INCLUDE LOADS CREATED BY LOCAL |
| INTERMITTENT MECHANICAL VENTILATION SUCH AS STANDARD |
| KITCHEN AND BATHROOM EXHAUST SYSTEMS. NEW OR |
| REPLACEMENT HEATING AND COOLING EQUIPMENT SHALL HAVE AN |
| EFFICIENCY RATING EQUAL TO OR GREATER THAN THE MINIMUM |
| REQUIRED BY FEDERAL LAW FOR THE GEOGRAPHIC LOCATION |
| WHERE THE EQUIPMENT IS INSTALLED. |
| NEW COMMENT: THE EQUIPMENT SIZING CALCULATIONS AND |
| ENERGY CODE COMPLIANCE FORMS THAT WERE SUBMITTED ARE ON |
| THE 2017 FORMS. THIS PROJECT IS UNDER THE 2014 EDITION |
| OF THE FBC. |
| |
| 2) SUBMIT TWO SETS OF 2014 ENERGY CODE COMPLIANCE FORMS |
| FOR THE NEW GARAGE, OFFICE AND GAME ROOM STRUCTURE. FBC |
| ENERGY CONSERVATION - SECT. R103.1.1.2 CODE COMPLIANCE |
| CERTIFICATION. |
| NEW COMMENT: THE EQUIPMENT SIZING CALCULATIONS AND |
| ENERGY CODE COMPLIANCE FORMS THAT WERE SUBMITTED ARE ON |
| THE 2017 FORMS. THIS PROJECT IS UNDER THE 2014 EDITION |
| OF THE FBC. |
| |
| 3) NEW COMMENT: THE CODE COMPLIANCE FORMS ARE REQUIRED |
| TO BE SIGNED BY THE OWNER/AGENT. FBC ENERGY |
| CONSERVATION - SECT. R103.1.1.2 |
| |
| 4) NEW COMMENT: THE ENERGY CODE COMPLIANCE FORMS LIST 1 |
| BEDROOM AND THERE ARE NOT ANY BEDROOMS IN THIS |
| STRUCTURE SHOWN ON THE PLANS. REVISE. FBC 107.2.1 |
| |
| 5) NEW COMMENT: THE EQUIPMENT SIZING CALULATIONS AND |
| ENERGY FORMS DO NOT MATCH THE EQUIPMENT SCHEDULE ON THE |
| PLANS. THE SIZING CALCULATIONS SPECIFY 2.2 TONS AND |
| 23,200 BTUH AND THE PLANS LIST 3 TONS AND 36,000 BTUH. |
| PLEASE CORRECT FBC 107.2.1. |