2018-01-31 06:35:05 | 1)SUBMIT A SEPARATE PERMIT APPLICATION FOR THE GAS AND |
| A SEPARATE PERMIT APPLICATION FOR THE PLUMBING |
| CONNECTIONS TO THE TANKLESS WATER HEATER INSTALLATION |
| AND FOR THE NEW WATER LINES TO BE RUN. . WPB AMEND. TO |
| FBC SEC. 107.1. 2ND REQUEST |
| 2) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED ABOVE |
| GROUND.TO THE TANKLESS WATER HEATER.WPB AMENDMENTS TO |
| FBC SEC.107.2.1. |
| 3) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| OUTLET IN THE BUILDING AND / OR SYSTEM PER THE 2014 |
| FBC-FUEL GAS SEC.402.4.1 OR 2014 FBC-RES. SEC. G |
| 2413.3. 2ND REQUEST. |
| 4) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| SEC. G2413.2. 2ND REQUEST |
| 5) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / |
| INSTALLATION MANUAL FOR THE TANKLESS WATER HEATER.THE |
| INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT |
| SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC |
| SEC.305.1, FBC-RES. SEC.G2408.1.2ND REQUEST. |
| 6) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| AND DISTANCE OF ANY OPERABLE DOORS OR WINDOWS IN |
| RELATION TO THE WATER HEATER. THE LOCATION OF THE WATER |
| HEATER SHALL COMPLY WITH THE MANUFACTURER'S |
| INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND |
| DRAWN. WPB AMEND. TO FBC SEC. 107.2.1. 2ND REQUEST |
| 7) TWO COPIES OF A GAS SIZING TABLE FOR THE GAS HAS |
| BEEN SUBMITTED BUT THERE IS NO STANDARD OR INFORMATION |
| AS TO WHERE THIS TABLE IS FROM. THE TABLE NOTES IT IS |
| FOR NATURAL GAS AND PROPANE BOTH WHICH DOES NOT |
| CORRELATE WITH THE SIZING TABLE IN THE 2014 FBC-FUEL |
| GAS CODE. CLARIFY. |
| 8) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES |
| USED TO SIZE THE GAS SYSTEM ( PE PIPE) OR PLACE A NOTE |
| ON THE PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) |
| FROM THE GAS CODE OR OTHER STANDARD THAT WERE USED IN |
| THE DESIGN OF THIS GAS SYSTEM. REFER TO THE 2014 |
| FBC-FUEL GAS SECS. 401.4, 401.8 THRU 402.6.1 AND TABLES |
| 402.4 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. |
| G2412.4, G2412.8, G2413.1, G2413.2, & G2413.3. |
| 9) SUBMIT TWO COPIES OF THE SIZING TABLE FOR THE PIPE |
| BEING INSTALLED ABOVE GROUND.. COMPLY WITH 2014 |
| FBC-FUEL GAS. |
| 10) THREE COPIES OF A PLAN HAS BEEN SUBMITTED THAT HAS |
| BEEN DONE BY AN ARCHITECT. PLANS SUBMITTED BY AN |
| ARCHITECT SHALL BEAR A SEAL AND SIGNATURE COMPLYING |
| WITH FL. ADMIN. CODE RULE 61G1-16.001 & 61G1-16.003. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |