2018-11-21 12:19:19 | 2ND REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION, |
| WPB AMENDMENTS TO THE FBC. |
| PERMIT #17100767 |
| 11/21/18 |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| THE COMMENTS FROM THE 1ST REVIEW PRINTED BELOW WERE NOT |
| ADDRESSED AND STILL EXIST- PLEASE COMPLY. |
| |
| 1) THE BUILDING PLAN REVIEWER HAS DETERMINED THAT NO |
| PERMIT EXISTS FOR THE BUILDING AND AS A RESULT IT WILL |
| BE REVIEWED AS A NEW BUILDING. |
| |
| 2) THERE ARE NO MECHANICAL PLANS SUBMITTED HOWEVER |
| THERE IS AN AIR HANDLER SHOWN IN A CLOSET BY THE |
| OFFICE. PLEASE PROVIDE COMPLETE AC PLANS INCLUDING: |
| |
| A) AC EQUIPMENT SCHEDULE. |
| |
| B) DUCT LAYOUT PLAN. |
| |
| C) AIR DEVICE SCHEDULE. |
| |
| D) LOCATION OF CONDENSER AND FLOOD ELEVATION AND WIND |
| RESISTANCE COMPLIANCE. |
| |
| 3) CALCULATIONS REQUIRED: |
| |
| A) MINIMUM VENTILATION CALCULATIONS FOR THE OCCUPIED |
| AREA EITHER USING NATURAL OR MECHANICAL MEANS- SEE |
| SECTIONS 402, 403 AND TABLE 403.3 |
| |
| B) AC COOLING AND HEATING CALCULATIONS- C403.3.2 FBC-14 |
| ENERGY COMPLIANCE. |
| |
| C) ENERGY CALCULATIONS- SECTION C101 AND C401.2. |
| |
| D) EXHAUST VENTILATION CALCULATIONS FOR THE GARAGE - |
| SEE TABLE 403.3 AND SECTION 404 |
| |
| 4) PROVIDE AN EXHAUST VENTILATION SYSTEM FOR THE |
| GARAGE- SEE SECTION 404. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| KEEP THEM WITH THE SUBMITTALS. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |
| |