Plan Review Notes
Plan Review Notes For Permit 17090495
Permit Number 17090495
Review Stop P
Sequence Number 1
Notes
Date Text
2017-09-28 15:28:459/28/17 1ST REVIEW PLUMBING
  
 1) PER LINE #5 OF JOB PROPOSAL IT LIST THAT PVC WILL BE
 PUSH THROUGH THE BLOCK WALL AND A NEW PVC BALL VALVE
 WOULD THEN BE INSTALLED ON THE INSIDE WALL. MAIN VALVE
 MUST BE LOCATED OUTSIDE OF THE STRUCTURE AND MATERIAL
 USE OF PVC UP TO THAT VALVE IS APPROVED FOR OUTSIDE USE
 ONLY PER FPC 605.3. ANY MATERIAL USED AFTER THE FULL
 OPEN MAIN VALVE MUST COMPLY WITH TABLE 605.4 AS IT
 WOULD BE CONSIDERED AS WATER DISTRIBUTION PIPING.
  
 2) THERE IS CURRENTLY AN UNPERMITTED BACKFLOW AT THIS
 SITE THAT WAS CITED ON 8/16/17. THIS MATTER MUST BE
 RESOLVED BEFORE ANY OTHER PLUMBING PERMITS ARE ISSUED.
  
 TIM HUNT
 PLUMBING INSPECTOR / PLUMBING PLAN REVIEWER
 CITY OF WEST PALM BEACH DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 561-805-6695
 [email protected]
  