2017-11-15 12:03:11 | RESIDENTIAL (R3) REVISION SECOND MECHANICAL REVIEW |
| CHECKLIST. |
| CODE: FBC 5TH EDITION (2014). |
| |
| |
| 1- A/C EQUIPMENT SIZING CALCULATIONS SUBMITTED: PROVIDE |
| COMPLETE EQUIPMENT SIZING CALCULATIONS "BASED ON |
| BUILDING LOADS FOR THE DIRECTIONAL ORIENTATION OF THE |
| BUILDING" AS REQUIRED BY SEC. R403.6.1 FBC-ENERGY |
| CONSERVATION, 5TH EDITION (2014). |
| NOTE: IT LOOKS LIKE THE EQUIPMENT SIZING CALCULATIONS |
| WERE DONE BY THE SAME PERSON WHO DID THE ENERGY |
| CALCULATIONS. THE ENERGY CALCULATIONS NEED TO BE |
| REVISED. SEE BUILDING REVIEW COMMENTS ON ITEM #1 AND |
| REVISE A/C EQUIPMENT SIZING CALCULATIONS AS REQUIRED. |
| |
| RESPONSE: REPEAT COMMENT. NOT ADDRESSED. SAME |
| CALCULATIONS DATED AUGUST 25TH 2017 WERE SUBMITTED. |
| AND, ONLY THE SUMMARY PAGES WERE SUBMITTED. NEED THE |
| COMPLETE EQUIPMENT SIZING CALCULATIONS. IN ADDITION, |
| THE ENERGY CALCULATIONS WERE REVISED ON 10/23/17 |
| SHOWING THE ACTUAL ORIENTATION OF THE BUILDING, BUT THE |
| EQUIPMENT SIZING CALCULATIONS WERE NOT REVISED. |
| PROVIDE COMPLETE EQUIPMENT SIZING CALCULATIONS BASED ON |
| THE ACTUAL ORIENTATION OF THE BUILDING AS REQUIRED BY |
| SEC. R403.6.1 FBC-ENERGY CONSERVATION. |
| |
| |
| IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| (561)805-6712 |
| [email protected] |