Date |
Text |
2018-01-24 15:15:50 | 3RD REVIEW FBC-2014 RESIDENTIAL MECHANICAL |
| PERMIT #17081337 |
| 1/24/18 |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| 1) NEW MECHANICAL PLANS HAVE BEEN SUBMITTED HOWEVER NO |
| REVISED ENERGY OR AC LOAD CALCULATIONS HAVE BEEN |
| SUBMITTED. OF THE TWO PREVIOUS SETS THAT WERE |
| SUBMITTED, ONE SET IS ON AN OUTDATED 2010 ENERGYGAUGE |
| FORM, AND THE SECOND SET HAS BEEN VOIDED OUT. PLEASE |
| SUBMIT REVISED CALCULATIONS. |
| |
| 2) SHEET M.1: THE MAIN PLANS FOR THE PROJECT SHOW THE |
| AC CLOSET DOOR 5D IS A SOLID CORE WOOD DOOR, HOWEVER |
| THE AC PLANS INDICATE AIR WILL BE RETURNED THROUGH THE |
| DOORS- PLEASE CORRECT. |
| |
| 3) M.1: PROVIDE A EXHAUST VENTILATION PLAN FOR THE |
| KITCHEN- SEE TABLE M1507.4 FOR EXHAUST RATES- 100 CFM |
| INTERMITTENT OR 25 CFM CONTINUOUS. PLEASE NOTE THAT |
| RANGE HOODS SHALL COMPLY WITH SECTIONS M1503. |
| |
| 4) M.1: THE AC PLAN SHOWS NO AIR PROVIDED TO THE HALL |
| AND FOYER. SEE COMMENT #1 ABOVE AND PROVIDE AC |
| CALCUATIONS INCLUDING THE MANUAL J WORKSHEET. |
| |
| 5) M.1: PROVIDE STRUCTURAL DETAILS FOR INSTALLATION OF |
| THE CONDENSER PADS AND MOUNTING THE CONDENSERS TO THE |
| PADS. |
| |
| 6) M.1 & M.2: PROVIDE CONDENSATE DISPOSAL PLANS- |
| SECTION M1411.3. |
| |
| 7) M.2: PROVIDE A DRYER EXHAUST PLAN- SEE SECTION |
| M1502. |
| |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| KEEP THEM WITH THE SUBMITTALS. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |
| |