Date |
Text |
2017-08-29 11:36:34 | 1ST REVIEW: FBC 2014 5TH EDITION |
| |
| PLUMBING COMMENTS: |
| |
| 1. GRAB BARS SHALL BE MEASURED FROM TOP OF GRIPPING |
| SURFACE TO FINISH FLOOR. PER FBC ACC 609.4 |
| |
| 2. SHT. A2.1 DETAILS 2, 5, 9, AND UNDER KEY NOTE |
| DETAILS 8, 9 SHOW VERTICAL GRAB BARS, GRAB BARS SHALL |
| BE INSTALLED IN A HORIZONTAL POSITION ONLY. PER FBC ACC |
| 609.4 |
| |
| 3. PLEASE SHOW COMPLIANCE WITH FBC ACC 604.6 FLUSH |
| CONTROLS. |
| FLUSH CONTROLS SHALL BE HAND OPERATED OR AUTOMATIC. |
| HAND OPERATED FLUSH CONTROLS SHALL COMPLY WITH 309. |
| FLUSH CONTROLS SHALL BE LOCATED ON THE OPEN SIDE OF THE |
| WATER CLOSET |
| |
| 4. PLEASE EXPAND THE WATER RISER AND LABEL ALL |
| FIXTURES. WPB AMEND TO FBC 107.3.5.1.3(13) |
| |
| 5. THE RPZ BACKFLOW DEVISE ON WATER SERVICE SHALL BE |
| NEXT TO THE CITY METER PER WPB UTILITIES DEPT. |
| |
| 6. A SEPARATE PERMIT IS REQUIRED FOR THE RPZ ON THE |
| WATER SERVICE. |
| |
| 7. PLEASE PROVIDE MANUFACTURE SIZING CALCULATIONS FOR |
| GREASE INTERCEPTOR. PER WPB AMEND TO FBC 107.2.1. |
| |
| 8. PLEASE PROVIDE A SANITARY RISER. PER WPB AMEND TO |
| FBC 107.3.5.1.3(13) |
| |
| 9. PLEASE SHOW ON THE RISER DIAGRAMS THE REQUIRED TRAP |
| PRIMERS ON FLOOR DRAINS, THE AIR HAMMER ARRESTORS AND |
| SHUT OFFS ON THE DROPS. PER WPB AMEND TO FBC |
| 107.3.5.1.3(13) |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| THE PREVIOUSLY REVIEWED SHEETS. |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| 561-805-6711 |
| [email protected] |
| |