2017-08-30 10:23:261ST REVIEW FBC-2014 MECHANICAL , EXISTING BUILDING,
 ENERGY CONSERVATION.
 PERMIT #17080793
 8/30/17
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) REFER TO SECTION C101.4.4 FBC-14 ENERGY CONSERVATION
 AND SUBMIT AN ENERGY EFFICIENCY COMPLIANCE REPORT FOR
 THE CHANGE OF OCCUPANCY FROM M TO A-2. SEE SECTION
 C401.2 FOR COMPLIANCE PATH INFORMATION.
  
 2) SUBMIT COOLING AND HEATING CALCULATIONS FOR THE NEW
 AC SYSTEMS IN ACCORDANCE WITH SECTION C403.2.1 FBC-14
 ENERGY CONSERVATION.
 C403.2.1 CALCULATION OF HEATING AND COOLING LOADS.
 DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE
 PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR
 ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE
 COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT
 WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE
 MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE
 SIZING CALCULATION SHALL BE SUBMITTED WITH THE
 APPLICATION FOR THE MECHANICAL PERMIT.
 PLEASE NOTE THE ILLEGIBLE CALCULATION COPIED AND PASTED
 ON SHEET M-2 APPEARS TO HAVE BEEN PERFORMED USING
 MANUAL J FOR RESIDENTIAL SYSTEMS- NOT ACCEPTABLE- SEE
 ABOVE.
  
 3) THE M-1 PLAN AND THE EQUIPMENT SCHEDULE ARE
 INDICATING THE NEW AC SYSTEMS TO BE SPLIT-SYSTEMS,
 HOWEVER THEY ARE LABELED AS RTU'S ON THE LAYOUT PLAN-
 PLEASE CORRECT.
  
 4) M-2: PLEASE INDICATE THE SUPPLY AND RETURN CFMS AT
 EACH DIFFUSER AND GRILL SHOWN ON THE LAYOUT PLAN.
  
 5) M-2: SMOKE DETECTORS ARE REQUIRED IN THE RETURN AIR
 SYSTEMS OF EACH 5-TON AC SYSTEM PER SECTION 606.2.1.
 PLEASE SHOW THE LOCATIONS ON THE PLAN. PLEASE NOTE THAT
 AN EXEMPTION CAN BE APPLIED IF THE MANUFACTURER'S
 SPECIFICATIONS INDICATE SYSTEMS ARE NOT CAPABLE OF
 PRODUCING OVER 2000 CFMS OF SUPPLY AIR.
  
 6) M-2: INDICATE HOW OUTDOOR AIR IS BEING PROVIDED TO
 THE NEW AIR HANDLERS, AND COMPLY WITH SECTION
 C403.2.4.4. FOR REQUIRED DAMPER.
  
 7) M-2: PROVIDE DUCT HANGING AND CONNECTION DETAILS PER
 SMACNA STANDARDS.
  
 8) M-2: PROVIDE CONDENSATE DISPOSAL PLANS AND DETAILS
 PER SECTION 307.
  
 9) PROVIDE A MECHANICAL ROOF PLAN SHOWING THE LOCATIONS
 OF THE CONDENSERS AND THEIR DISTANCES FROM THE ROOF
 EDGES. PLEASE PROVIDE ADDITIONAL CLEARANCE DISTANCE
 MEASUREMENTS FOR O/A INTAKES TO EXHAUST AND VENT
 OPENINGS- SEE SECTIONS 304.11 AND 401.4.
  
 10) PROVIDE A FL. PRODUCT APPROVAL OR MIAMI-DADE NOA
 FOR THE CONDENSER STAND WITH REVIEW STAMP BY THE
 ENGINEER OF RECORD. THE EOR SHALL CIRCLE, HIGHLIGHT, OR
 OTHERWISE MARK ALL APPLICABLE INSTALLATION DETAILS AND
 DESIGN PRESSURES SHOWN IN THE DOCUMENT, AND ALSO
 PROVIDE THE WIND DESIGN CRITERIA ON THE PLAN- SECTION
 301.15.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved