Date |
Text |
2017-08-30 10:23:26 | 1ST REVIEW FBC-2014 MECHANICAL , EXISTING BUILDING, |
| ENERGY CONSERVATION. |
| PERMIT #17080793 |
| 8/30/17 |
| |
| PLAN REVIEW RESULTS: DENIED. |
| |
| 1) REFER TO SECTION C101.4.4 FBC-14 ENERGY CONSERVATION |
| AND SUBMIT AN ENERGY EFFICIENCY COMPLIANCE REPORT FOR |
| THE CHANGE OF OCCUPANCY FROM M TO A-2. SEE SECTION |
| C401.2 FOR COMPLIANCE PATH INFORMATION. |
| |
| 2) SUBMIT COOLING AND HEATING CALCULATIONS FOR THE NEW |
| AC SYSTEMS IN ACCORDANCE WITH SECTION C403.2.1 FBC-14 |
| ENERGY CONSERVATION. |
| C403.2.1 CALCULATION OF HEATING AND COOLING LOADS. |
| DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE |
| PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR |
| ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE |
| COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT |
| WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE |
| MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE |
| SIZING CALCULATION SHALL BE SUBMITTED WITH THE |
| APPLICATION FOR THE MECHANICAL PERMIT. |
| PLEASE NOTE THE ILLEGIBLE CALCULATION COPIED AND PASTED |
| ON SHEET M-2 APPEARS TO HAVE BEEN PERFORMED USING |
| MANUAL J FOR RESIDENTIAL SYSTEMS- NOT ACCEPTABLE- SEE |
| ABOVE. |
| |
| 3) THE M-1 PLAN AND THE EQUIPMENT SCHEDULE ARE |
| INDICATING THE NEW AC SYSTEMS TO BE SPLIT-SYSTEMS, |
| HOWEVER THEY ARE LABELED AS RTU'S ON THE LAYOUT PLAN- |
| PLEASE CORRECT. |
| |
| 4) M-2: PLEASE INDICATE THE SUPPLY AND RETURN CFMS AT |
| EACH DIFFUSER AND GRILL SHOWN ON THE LAYOUT PLAN. |
| |
| 5) M-2: SMOKE DETECTORS ARE REQUIRED IN THE RETURN AIR |
| SYSTEMS OF EACH 5-TON AC SYSTEM PER SECTION 606.2.1. |
| PLEASE SHOW THE LOCATIONS ON THE PLAN. PLEASE NOTE THAT |
| AN EXEMPTION CAN BE APPLIED IF THE MANUFACTURER'S |
| SPECIFICATIONS INDICATE SYSTEMS ARE NOT CAPABLE OF |
| PRODUCING OVER 2000 CFMS OF SUPPLY AIR. |
| |
| 6) M-2: INDICATE HOW OUTDOOR AIR IS BEING PROVIDED TO |
| THE NEW AIR HANDLERS, AND COMPLY WITH SECTION |
| C403.2.4.4. FOR REQUIRED DAMPER. |
| |
| 7) M-2: PROVIDE DUCT HANGING AND CONNECTION DETAILS PER |
| SMACNA STANDARDS. |
| |
| 8) M-2: PROVIDE CONDENSATE DISPOSAL PLANS AND DETAILS |
| PER SECTION 307. |
| |
| 9) PROVIDE A MECHANICAL ROOF PLAN SHOWING THE LOCATIONS |
| OF THE CONDENSERS AND THEIR DISTANCES FROM THE ROOF |
| EDGES. PLEASE PROVIDE ADDITIONAL CLEARANCE DISTANCE |
| MEASUREMENTS FOR O/A INTAKES TO EXHAUST AND VENT |
| OPENINGS- SEE SECTIONS 304.11 AND 401.4. |
| |
| 10) PROVIDE A FL. PRODUCT APPROVAL OR MIAMI-DADE NOA |
| FOR THE CONDENSER STAND WITH REVIEW STAMP BY THE |
| ENGINEER OF RECORD. THE EOR SHALL CIRCLE, HIGHLIGHT, OR |
| OTHERWISE MARK ALL APPLICABLE INSTALLATION DETAILS AND |
| DESIGN PRESSURES SHOWN IN THE DOCUMENT, AND ALSO |
| PROVIDE THE WIND DESIGN CRITERIA ON THE PLAN- SECTION |
| 301.15. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 401 CLEMATIS STREET |
| WEST PALM BEACH FL 33401 |
| 561-805-6719 |
| [email protected] |
| |