2017-08-03 11:24:12 | PLAN |
| REVIEW COMMENTS |
| |
| 1ST REVIEW: FBC FIFTH EDITION (2014) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY MECHANICAL |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) SHOW THAT THE SECOND FLOOR DWELLING IS IN COMPLIANCE |
| WITH FBC-R303.9 REQUIRED HEATING. WHEN THE WINTER |
| DESIGN TEMPERATURE IN TABLE R301.2(1) IS BELOW 60 |
| DEGREES F , EVERY DWELLING UNIT SHALL BE PROVIDED WITH |
| HEATING FACILITIES CAPABLE OF MAINTAINING A MINIMUM |
| ROOM TEMPERATURE OF 68 DEGREES F AT A POINT 3 FEET (914 |
| MM) ABOVE THE FLOOR AND 2 FEET (610 MM) FROM EXTERIOR |
| WALLS IN ALL HABITABLE ROOMS AT THE DESIGN TEMPERATURE. |
| THE INSTALLATION OF ONE OR MORE PORTABLE SPACE HEATERS |
| SHALL NOT BE USED TO ACHIEVE COMPLIANCE WITH THIS |
| SECTION. |
| |
| 2) FBC-R - M1401.3 SIZING. HEATING AND COOLING |
| EQUIPMENT SHALL BE SIZED BASED ON BUILDING LOADS |
| CALCULATED IN ACCORDANCE WITH ACCA MANUAL J OR OTHER |
| APPROVED HEATING AND COOLING CALCULATION METHODOLOGIES. |
| PROVIDE EQUIPMENT SIZING CALCULATIONS. |
| |
| 3) FBC - 107.3.5.3 PROVIDE TWO SETS OF A MECHANICAL |
| PLAN TO SHOW EQUIPMENT AND LOCATION AND DUCT SYSTEMS |
| PER FBC-R M16 & BATH EXHAUST PER FBC-R M15. |
| |
| 4) FBC 107.2.1 PROVIDE THE MODEL NUMBERS AND |
| SPECIFICATIONS OF THE HEATING AND COOLING EQUIPMENT IN |
| AN EQUIPMENT SCHEDULE ON THE MECHANICAL PLAN THAT |
| CORRESPONDS WITH THE EQUIPMENT SIZING CALCULATIONS. |
| PROVIDE AN EQUIPMENT SCHEDULE ON THE MECHANICAL PLANS |
| THAT CORRESPONDS WITH THE EQUIPMENT SIZING |
| CALCULATIONS. FBC 107.3.5.3 |
| |
| 5) SHOW COMPLIANCE WITH FBC-R - M 1602.4 WHICH REQUIRES |
| BALANCED AIR RETURN AT THE BEDROOMS. |
| |
| 6) PROVIDE A WIND LOAD TIE DOWN/ANCHORING DETAIL FOR |
| THE A/C CONDENSING UNIT . FBC-R 301.1 |
| |
| |