Plan Review Notes
Plan Review Notes For Permit 17070538
Permit Number 17070538
Review Stop M
Sequence Number 1
Notes
Date Text
2017-08-03 11:24:12PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY MECHANICAL
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SHOW THAT THE SECOND FLOOR DWELLING IS IN COMPLIANCE
 WITH FBC-R303.9 REQUIRED HEATING. WHEN THE WINTER
 DESIGN TEMPERATURE IN TABLE R301.2(1) IS BELOW 60
 DEGREES F , EVERY DWELLING UNIT SHALL BE PROVIDED WITH
 HEATING FACILITIES CAPABLE OF MAINTAINING A MINIMUM
 ROOM TEMPERATURE OF 68 DEGREES F AT A POINT 3 FEET (914
 MM) ABOVE THE FLOOR AND 2 FEET (610 MM) FROM EXTERIOR
 WALLS IN ALL HABITABLE ROOMS AT THE DESIGN TEMPERATURE.
 THE INSTALLATION OF ONE OR MORE PORTABLE SPACE HEATERS
 SHALL NOT BE USED TO ACHIEVE COMPLIANCE WITH THIS
 SECTION.
  
 2) FBC-R - M1401.3 SIZING. HEATING AND COOLING
 EQUIPMENT SHALL BE SIZED BASED ON BUILDING LOADS
 CALCULATED IN ACCORDANCE WITH ACCA MANUAL J OR OTHER
 APPROVED HEATING AND COOLING CALCULATION METHODOLOGIES.
 PROVIDE EQUIPMENT SIZING CALCULATIONS.
  
 3) FBC - 107.3.5.3 PROVIDE TWO SETS OF A MECHANICAL
 PLAN TO SHOW EQUIPMENT AND LOCATION AND DUCT SYSTEMS
 PER FBC-R M16 & BATH EXHAUST PER FBC-R M15.
  
 4) FBC 107.2.1 PROVIDE THE MODEL NUMBERS AND
 SPECIFICATIONS OF THE HEATING AND COOLING EQUIPMENT IN
 AN EQUIPMENT SCHEDULE ON THE MECHANICAL PLAN THAT
 CORRESPONDS WITH THE EQUIPMENT SIZING CALCULATIONS.
 PROVIDE AN EQUIPMENT SCHEDULE ON THE MECHANICAL PLANS
 THAT CORRESPONDS WITH THE EQUIPMENT SIZING
 CALCULATIONS. FBC 107.3.5.3
  
 5) SHOW COMPLIANCE WITH FBC-R - M 1602.4 WHICH REQUIRES
 BALANCED AIR RETURN AT THE BEDROOMS.
  
 6) PROVIDE A WIND LOAD TIE DOWN/ANCHORING DETAIL FOR
 THE A/C CONDENSING UNIT . FBC-R 301.1
  
  