Date |
Text |
2017-07-21 13:41:48 | 1) SHOW THE DISTANCE FROM THE 2ND STAGE REGULATOR TO | | THE GENERATOR AND THE TYPE OF PIPING FROM THE REGULATOR | | TO THE GENERATOR. COMPLY WITH 2014 FBC-FUEL GAS OR NFPA | | 58 FOR PIPE SIZE REQUIREMENTS. SUBMIT TWO COPIES OF THE | | SIZING TABLE USED FOR THIS SECTION OF PIPE. | | 2) INDICATE THE PSI OF THE SYSTEM DOWNSTREAM OF THE 2ND | | STAGE REGULATOR AT THE GENERATOR. | | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE 2ND | | STAGE REGULATOR. WPB AMEND. TO FBC SEC. 107.2.1, 2014 | | FBC-FUEL GAS SEC.410.1. | | | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | PLUMBING PLAN REVIEW | | 561-805-6692 | | [email protected] | | | | |
|