Date |
Text |
2017-07-11 05:12:13 | 1) I HAVE RESEARCHED CITY RECORDS BACK TO 1996 AND |
| THERE IS NO RECORD OF A PERMIT FOR THE INSTALLATION OF |
| AN LP TANK. WHAT OTHER APPLIANCES/EQUIPMENT IS SUPPLIED |
| BY THIS "EXISTING " TANK? SINCE THERE IS NO RECORD OF A |
| PERMIT FOR THE LP TANK, THE TANK MUST BE INCLUDED IN |
| THIS PERMIT FOR THIS SCOPE OF WORK. WPB AMEND. TO FBC |
| SEC. 105.1. |
| 2) PROVIDE THE SIZE AND TYPE OF THE HOLD-DOWN |
| CABLES/STRAPS FOR THE TANK AND SUBMIT ANCHORING DETAILS |
| FOR THE LP TANK. NFPA 58-11 SEC. 5.2.4.3. |
| 3) SHOW THE DISTANCE FROM THE 2 PSI REGULATOR TO THE |
| GENERATOR AND SHOW THE TYPE OF PIPE MATERIAL. THE PIPE |
| SHALL BE SIZED IN ACCORDANCE WITH THE SPECIFIC SIZING |
| TABLES LISTED IN 2014 FBC-FUEL GAS TABLES 402.4 (25) |
| THROUGH 402.4 (37). SUBMIT TWO COPIES OF THE SPECIFIC |
| SIZING TABLE FOR THE LOW PRESSURE SYSTEM. |
| 4) REGULATORS INSTALLED OUTDOORS SHALL BE DESIGNED, |
| INSTALLED OR PROTECTED SO THEIR OPERATION WILL NOT BE |
| AFFECTED BY THE ELEMENTS. PROVIDE DOCUMENTATION FROM |
| THE MANUFACTURER THAT THE REGULATORS ARE APPROVED FOR |
| EXTERIOR USE. NFPA 58-11 SEC. 6.8.1.5. |
| 5) SHOW THE CAPACITY OF THE LP TANK ON THE PLANS AND |
| SHOW THE TYPE OF TANK ( HORIZONTAL ASME OR VERTICAL |
| ASME). |
| 6) SHOW THE TYPE OF FOUNDATION FOR THE LP TANK ON THE |
| PLAN. HORIZONTAL ASME CONTAINERS SHALL COMPLY WITH NFPA |
| 58 SEC.6.6.3.1. VERTICAL ASME CONTAINERS SHALL COMPLY |
| WITH NFPA 58-11 SEC. 6.6.4.1. |
| 7) SHOW THE DISTANCE OF THE LP TANK FROM THE EXTERIOR |
| WALL OF THE STRUCTURE TO THE CONTAINER SURFACE AND ALSO |
| FROM THE PROPERTY LINE TO THE CONTAINER SURFACE. COMPLY |
| WITH NFPA 58-11 SEC. 6.3.1 & TABLE 6.3.1. |
| 8) THE MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR |
| SHALL BE ONSITE FOR FINAL GAS INSPECTION. THE GENERATOR |
| SHALL BE LISTED AND APPROVED. NFPA 58 SEC. 5.20.1. THE |
| GENERATOR SHALL MEET THE REQUIREMENTS OF UL 2200. |
| 9) THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE |
| ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE |
| THE EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, |
| THE EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE |
| OPERATING SYSTEM. FGC SECS. 401.4, 401.8, 402.1, 402.2, |
| 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, G2413.2, |
| G2413.3. |
| |
| |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |