Date |
Text |
2017-07-31 14:34:24 | BUILDING PLAN REVIEW |
| W. P. B. REVISION: 17070136 |
| W. P. B. PERMIT: 15111020 |
| ADD: 1100 S. FLAGLER DR. |
| CONT: SUFFOLK CONSTRUCTION CO. |
| TEL: 561-832-1616 |
| E-MAIL: [email protected] / ED HANRATTY |
| |
| 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH |
| AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| ADMINISTRATION |
| |
| 1ST REVIEW |
| DATE: SAT. AUGUST 05/ 2017 |
| ACTION: DENIED |
| |
| 1) I MISSPOKE IN THE MEETING DATED JULY 26TH IN REGARDS |
| TO MECHANICAL CLOSETS IN RATED EXIT PASSAGE WAYS. |
| SHEETS 080-A2.01 & 098-A2.51A BOTH SHOW THE MECHANICAL |
| CLOSET 103A AND (2) DOORS, 103F & 103G THAT BOTH OPEN |
| INTO A 2 HOUR FIRE RATED EXIT PASSAGE WAY. PLEASE |
| REVIEW THE 2010 FBC-B SECTIONS 1023.1 AND EXCEPTION |
| 402.4.6 ALLOWS FOR MECHANICAL ROOMS, ELECTRICAL ROOMS |
| BUILDING SERVICE AREAS OPENING DIRECTLY INTO THE EXIT |
| PASSAGEWAY ARE ALLOWED!!! |
| |
| 2) PLEASE NOTE WHEN THE (2) REMAINING FLOOD ZONE |
| CERTIFICATES ARE REQUIRED. FLOOD ZONE CERTIFICATES/ |
| SURVEYORS- DEPT. OF AGRICULTURE |
| FBC BUILDING 1612 AND CITY OF WPB CODE OF ORDINANCES |
| SECTION 94-546. STRUCTURE IS LOCATED IN AN "A" FLOOD |
| ZONE. A FLOOD ELEVATION CERTIFICATE WILL BE REQUIRED. |
| PLEASE REVIEW CITY ORDINANCE FOR THE CITY REQUIREMENTS |
| REQUIRE AN ADDITIONAL 6 INCHES/ (12 INCHES OF ELEVATION |
| IF PERMIT APPLICATION IS ON OR AFTER SEPT. 12/2016. |
| |
| DURING THE PERMITTING OF THIS STRUCTURE THERE WILL BE |
| REQUIRED (3) DIFFERENT FLOOD ZONE CERTIFICATES |
| REQUIRED: |
| (1)COMPLETED. A FLOOD ZONE CERTIFICATE IS REQUIRED AS |
| PART OF THE PLAN REVIEW DOCUMENTS WITH THE PROPOSED |
| FINISH FLOOR HEIGHT. W. P. B. ADMINISTRATIVE CODE |
| 107.3.5.1.1 BUILDING MINIMUM PLAN REVIEW CRITERIA FOR |
| COMMERCIAL BUILDINGS. ( 8) FLOOD REQUIREMENTS |
| ELEVATIONS, ENCLOSURES, FLOOD DAMAGE-RESISTANT |
| MATERIALS. |
| |
| (2) ONCE THE FIRST FLOOR SLAB IS POURED THE 2ND |
| ELEVATION CERTIFICATE IS REQUIRED. W. P. B. |
| ADMINISTRATIVE CODE 110.3 REQUIRED INSPECTIONS 1.2 |
| FLOOR/ SLAB INSPECTION. IN FLOOD HAZARD AREAS, UPON |
| PLACEMENT OF THE LOWEST FLOOR, INCLUDING BASEMENT, AND |
| PRIOR TO FURTHER VERTICAL CONSTRUCTION, THE ELEVATION |
| CERTIFICATION, REQUIRED IN SECTION 1612.5, SHALL BE |
| SUBMITTED TO THE BUILDING OFFICIAL. |
| |
| (3) BEFORE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY |
| OR A CERTIFICATE OF COMPLETION THE 3RD FLOOD ZONE |
| CERTIFICATE IS REQUIRED WITH THE HEIGHT OF ALL EXTERIOR |
| ATTENDANTS A/C PADS OR OTHER SLABS FOR GENERATORS. |
| W. P. B. ADMINISTRATIVE CODE 110.3 REQUIRED INSPECTIONS |
| (6) FINAL INSPECTION. TO BE MADE AFTER THE BUILDING IS |
| COMPLETED AND READY FOR OCCUPANCY. 6.1. LOWEST FLOOR |
| ELEVATION. IN FLOOD HAZARD AREAS, AS PART OF THE FINAL |
| INSPECTION, A FINAL CERTIFICATION OF THE LOWEST FLOOR |
| ELEVATION SHALL BE SUBMITTED TO THE AUTHORITY HAVING |
| JURISDICTION. |
| |
| FEMA NEW FORM AVAILABLE JUNE 13/2016. |
| OMB NO. 1660-0008 |
| EXPIRATION DATE: NOV. 30/2018 |
| HTTP://WWW.FEMA.GOV/BUSINESS/NFIP/ELVINST.SHTM |
| |
| 3A) COMMENT AS TO SHEET 102-A2.52B AND SHEET 156-A4.13A |
| DETAIL # 5. THE PLANS SHOW DOUBLE WOOD SLEEPERS AND |
| WOOD DECK. THE PLANS ARE SILENT AS TO THE TYPE OF WOOD |
| THE SLEEPERS AND DECK WILL BE MADE. HOW THE DECK WILL |
| BE ANCHORED IN HIGH WIND EVENTS. SPACING OF THE |
| SLEEPERS, THICKNESS OF DECK MATERIALS, SPACING OF |
| MATERIAL AND THE COMPLIANCE WITH 2010 FBC-B 603.1.1 |
| FIRE RETARDANT TREATED WOODS. |
| |
| 3B) THERE ARE 2 OTHER CONCERNS ABOUT THE WOOD DECK |
| SHOWN ON SHEET 102-A2.52B, BETWEEN GRAPH LINES 9 & 10 |
| THERE IS A BALCONY DIVIDER AND TO THE RIGHT AT POINT P5 |
| THE WOOD DECK ENDS, HOW IS THE FINISH DECK ELEVATION |
| CHANGE IN REGARDS TO THE CONCRETE DECK TO THE RIGHT? |
| 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED. |
| |
| 3C) WITHOUT THE KNOWN ELEVATION CHANGE FROM THE WOOD |
| DECK TO THE FINISH CONCRETE DECK THE PROBLEM MAY OCCUR |
| IF THE CONCRETE DECK IS THE SAME HEIGHT THROUGHOUT ALL |
| OF THE 2ND FLOOR LEVEL AND THE WOOD DECK BEING 3 ? |
| INCHES HIGHER THAN THE CONCRETE DECK, THEN WE WOULD NOT |
| MET THE HEIGHT REQUIREMENT FOR THE GUARDRAIL OF 42 |
| INCHES, PER 2010 1013.2. |
| |
| 4A) THE MEETING HELD ON JULY 26TH/ 2017 IN THE PLANNING |
| DEPARTMENT INDICATED PLANS WILL NEED TO BE UPDATED IN |
| REGARDS TO THE USE OF 2 HR. RATED SHAFTS VERSES THE USE |
| OF FLAMEBAR. THE CURRENT SET OF REVISIONS SUBMITTED |
| SHOW ON SHEET 437-M5.01 IN NOTE 1 THE USE OF FLAMEBAR |
| ON ALL TOILET & KITCHEN EXHAUST DUCT HORIZONTAL OFFSETS |
| TO BE COMPLETED WITH FLAMEBAR DUCT. |
| SHEET $38-M5.02 A SIMILAR NOTE. SHEET 440-M504 NOTE 1 |
| ALL SMOKE EXHAUST, PRESSURIZATION DUCTS AND OUTSIDE AIR |
| HORIZONTAL OFFSETS SHALL BE DONE WITH FLAME BAR. PLEASE |
| NOTE ONCE THE DISCUSSION WAS STARTED IT APPEARS THE |
| PLANS ARE NOT CORRECT, AND FLAMEBAR IS TO BE USED |
| TOTALLY AND THE ELIMINATION OF ALL SHAFTS. |
| DISCUSSION BETWEEN THE ARCHITECT AND MECHANICAL |
| ENGINEER SHOWED TO DATE( 7/18/17 MEETING) THERE HADN?T |
| BEEN AN AGREEMENT REACHED. |
| IN DISCUSSION OVER E-MAILS THERE HAD BEEN TALK OF A |
| FLORIDA DECLARATORY STATEMENT, BUT TO DATE NONE HAS |
| BEEN PROVIDED. IN THE 2010 FBC-B IN SECTION 708.2 |
| PROVIDES WHERE SHAFTS ARE REQUIRED AND THE EXCEPTIONS. |
| IF THE DESIGNERS WOULD LIKE THE BUILDING DEPARTMENT TO |
| CONSIDER THIS UNDER THE 2010 WEST PALM BEACH AMENDMENTS |
| TO THE FLORIDA BUILDING CODE, CHAPTER 1, ADMINISTRATION |
| 104.11. ALTERNATE MATERIALS, DESIGN AND METHODS OF |
| CONSTRUCTION AND EQUIPMENT. THE DESIGNER MUST REQUEST |
| IN WRITING THAT THE BUILDING OFFICIAL WOULD REVIEW, AND |
| ALLOW THIS AS AN EQUAL TO THE CODE. |
| |
| 104.11 ALTERNATIVE MATERIALS, DESIGN AND METHODS OF |
| CONSTRUCTION AND EQUIPMENT. THE |
| PROVISIONS OF THIS CODE ARE NOT INTENDED TO PREVENT THE |
| INSTALLATION OF ANY MATERIAL OR TO PROHIBIT |
| ANY DESIGN OR METHOD OF CONSTRUCTION NOT SPECIFICALLY |
| PRESCRIBED BY THIS CODE, PROVIDED THAT |
| ANY SUCH ALTERNATIVE HAS BEEN APPROVED. AN ALTERNATIVE |
| MATERIAL, DESIGN OR METHOD OF |
| CONSTRUCTION SHALL BE APPROVED WHERE THE BUILDING |
| OFFICIAL FINDS THAT THE PROPOSED DESIGN IS |
| SATISFACTORY AND COMPLIES WITH THE INTENT OF THE |
| PROVISIONS OF THIS CODE, AND THAT THE MATERIAL, METHOD |
| OR WORK OFFERED IS, FOR THE PURPOSE INTENDED, AT LEAST |
| THE EQUIVALENT OF THAT PRESCRIBED IN THIS CODE IN |
| QUALITY, STRENGTH, EFFECTIVENESS, FIRE RESISTANCE, |
| DURABILITY AND SAFETY. WHEN ALTERNATE LIFE SAFETY |
| SYSTEMS ARE DESIGNED, THE SFPE ENGINEERING GUIDE TO |
| PERFORMANCE-BASED FIRE PROTECTION |
| ANALYSIS AND DESIGN OF BUILDINGS, OR OTHER METHODS |
| APPROVED BY THE BUILDING OFFICIAL MAY BE USED. |
| THE BUILDING OFFICIAL SHALL REQUIRE THAT SUFFICIENT |
| EVIDENCE OR PROOF BE SUBMITTED TO SUBSTANTIATE ANY |
| CLAIM MADE REGARDING THE ALTERNATIVE. |
| 104.11.1 RESEARCH REPORTS. SUPPORTING DATA, WHERE |
| NECESSARY TO ASSIST IN THE APPROVAL OF |
| MATERIALS OR ASSEMBLIES NOT SPECIFICALLY PROVIDED FOR |
| IN THIS CODE, SHALL CONSIST OF VALID |
| RESEARCH REPORTS FROM APPROVED SOURCES. |
| 104.11.2 TESTS. WHENEVER THERE IS INSUFFICIENT EVIDENCE |
| OF COMPLIANCE WITH THE PROVISIONS OF |
| THIS CODE, OR EVIDENCE THAT A MATERIAL OR METHOD DOES |
| NOT CONFORM TO THE REQUIREMENTS OF THIS |
| CODE, OR IN ORDER TO SUBSTANTIATE CLAIMS FOR |
| ALTERNATIVE MATERIALS OR METHODS, THE BUILDING |
| OFFICIAL SHALL HAVE THE AUTHORITY TO REQUIRE TESTS AS |
| EVIDENCE OF COMPLIANCE TO BE MADE AT NO |
| EXPENSE TO THE JURISDICTION. TEST METHODS SHALL BE AS |
| SPECIFIED IN THIS CODE OR BY OTHER |
| RECOGNIZED TEST STANDARDS. IN THE ABSENCE OF RECOGNIZED |
| AND ACCEPTED TEST METHODS, THE |
| BUILDING OFFICIAL SHALL APPROVE THE TESTING PROCEDURES. |
| TESTS SHALL BE PERFORMED BY AN APPROVED |
| AGENCY. REPORTS OF SUCH TESTS SHALL BE RETAINED BY THE |
| BUILDING OFFICIAL FOR THE PERIOD REQUIRED |
| FOR RETENTION OF PUBLIC RECORDS. |
| |
| 4B) THE OTHER ISSUE THAT WILL NEED TO BE CONSIDERED |
| WITH THE REMOVAL OF SHAFT WALL CONSTRUCTION, |
| (CONSIDERED COMMON AREAS) WILL BE THE REPLACEMENT WALL |
| SYSTEM, USUALLY A CHASE WALL SYSTEM POSSIBLY |
| WITH DRYWALL ON ONLY ONE SIDE, AND OR MAYBE INSULATION. |
| THIS WALL SYSTEM WOULD STILL NEED TO SHOW COMPLIANCE |
| WITH THE 2010 FBC-B 1207.2 AIR-BORNE SOUND. WALLS, |
| PARTITIONS AND FLOOR/CEILING ASSEMBLIES SEPARATING |
| DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR |
| SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS |
| (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR |
| AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E |
| 90. |
| |
| 5) DURING THE MEETING HELD ON 7/26/17 THERE WAS |
| DISCUSSION BETWEEN THE USE OF THE TYPE OF ROOFING |
| INSULATION TO BE USED. THE ARCHITECT SHOWS ON THE PLANS |
| THE USE POLYISOCYANURATE BOARD SHEET A4.31 DETAIL # 1. |
| THE ROOFING SPEC 07 5400 IS GIVEN. THE SPEC BOOKS ARE |
| NOT INCLUDED IN THE PLAN REVIEWS NOR DO WE REVIEW THEM. |
| IN THE MEETING IT WAS DISCUSSED POSSIBLY TO GOING AND |
| USING LIGHTWEIGHT CONCRETE INSTEAD OF POLYISOCYANURATE |
| BOARD. |
| |
| WHEN YOU REVIEW THE LIGHTWEIGHT SPEC SECTION 03 52 00 |
| FOR LIGHTWEIGHT CONCRETE ROOF INSULATION WRITER HAS |
| MANY OPTIONS AS TO HOW TO WRITE THE SPEC FOR VENTING |
| DEPENDING ON LOCATION TYPE OF DECK CONCRETE VERSES |
| STEEL DECK WITH VENTING OF DECK OR NON-VENTED STEEL |
| DECKING TO ALIEVE THE MOISTURE WITHIN THE LIGHTWEIGHT |
| CONCRETE. |
| |
| I COULD NOT FIND A ROOFING SPEC LISTED FOR 07 5400 BUT |
| DID FIND A ROOF SPEC 07 5300 FOR SINGLE PLY MEMBRANE |
| ROOFING, THE COMPANIES LISTED ARE CARLISLE, FLEX, GAF, |
| SIKA SARNAFIL, AND VERSICO EACH WRITING THEIR OWN |
| REQUIREMENTS FOR ROOF INSULATION AND INSTALLATION OF |
| SYSTEMS AND VENTING REQUIREMENTS. |
| |
| 6A) WITHIN THE MEETING HELD ON 7/26/2017 THERE WAS |
| DISCUSSION ON THE POOL AND REQUIREMENT FOR A SEPARATE |
| BUILDING PERMIT. IT WAS INDICATED THERE WILL BE A |
| PREFABRICATED WALL SYSTEM WITH POOL LINER. |
| THIS REVISION SHOWS DETAILS FOR THE MEMBRANE LINER, |
| SHEET 746-W5.1_04: |
| DETAIL 01 MAIN POOL TYPICAL EDGE |
| DETAIL 02 MAIN POOL STAIRS |
| DETAIL 03 MAIN POOL STRUCTURAL SYSTEM / HOT SPA WALL & |
| EDGE |
| THESE AND OTHER DETAILS SHOW THE PREFABRICATED WALL AND |
| STRUCTURAL BRACING/ STRUCTURAL WALL COMPONENT POOL WALL |
| SYSTEM WILL BE UNDER A SEPARATE POOL (BUILDING PERMIT) |
| OR WILL SUFFOLK CONSTRUCTION BE SUBMITTING THESE |
| DETAILS UNDER A FUTURE REVISION? 107.2.1.3. ADDITIONAL |
| INFORMATION REQUIRED? |
| |
| 6B) SHEET 746-W5-104 DETAIL 03, IN THE SUBMITTED DETAIL |
| IT WOULD APPEAR THERE WOULD BE GREATER WATER PRESSURE |
| ON THE POOL SIDE WALL SINCE IT IS DEEPER THAN THE SPA, |
| SHOULD THE LATERAL BRACING BE TURNED THE OPPOSITE WAY |
| TO HELPS SUPPORT, AND BRACE THE POOL WALL. 107.2.1.3 |
| ADDITIONAL INFORMATION REQUIRED. |
| |
| 7) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR |
| PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| |
| JAMES A. WITMER BN, PX, CBO |
| SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES |
| DEPARTMENT |
| 401 CLEMATIS ST. |
| WEST PALM BEACH. FL 33402 |
| TEL: 561-805-6715 |
| FAX: 561-805-6676 |
| E-MAIL: [email protected] |
| |
| |