2017-07-31 14:34:24BUILDING PLAN REVIEW
 W. P. B. REVISION: 17070136
 W. P. B. PERMIT: 15111020
 ADD: 1100 S. FLAGLER DR.
 CONT: SUFFOLK CONSTRUCTION CO.
 TEL: 561-832-1616
 E-MAIL: [email protected] / ED HANRATTY
  
 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 1ST REVIEW
 DATE: SAT. AUGUST 05/ 2017
 ACTION: DENIED
  
 1) I MISSPOKE IN THE MEETING DATED JULY 26TH IN REGARDS
 TO MECHANICAL CLOSETS IN RATED EXIT PASSAGE WAYS.
 SHEETS 080-A2.01 & 098-A2.51A BOTH SHOW THE MECHANICAL
 CLOSET 103A AND (2) DOORS, 103F & 103G THAT BOTH OPEN
 INTO A 2 HOUR FIRE RATED EXIT PASSAGE WAY. PLEASE
 REVIEW THE 2010 FBC-B SECTIONS 1023.1 AND EXCEPTION
 402.4.6 ALLOWS FOR MECHANICAL ROOMS, ELECTRICAL ROOMS
 BUILDING SERVICE AREAS OPENING DIRECTLY INTO THE EXIT
 PASSAGEWAY ARE ALLOWED!!!
  
 2) PLEASE NOTE WHEN THE (2) REMAINING FLOOD ZONE
 CERTIFICATES ARE REQUIRED. FLOOD ZONE CERTIFICATES/
 SURVEYORS- DEPT. OF AGRICULTURE
 FBC BUILDING 1612 AND CITY OF WPB CODE OF ORDINANCES
 SECTION 94-546. STRUCTURE IS LOCATED IN AN "A" FLOOD
 ZONE. A FLOOD ELEVATION CERTIFICATE WILL BE REQUIRED.
 PLEASE REVIEW CITY ORDINANCE FOR THE CITY REQUIREMENTS
 REQUIRE AN ADDITIONAL 6 INCHES/ (12 INCHES OF ELEVATION
 IF PERMIT APPLICATION IS ON OR AFTER SEPT. 12/2016.
  
 DURING THE PERMITTING OF THIS STRUCTURE THERE WILL BE
 REQUIRED (3) DIFFERENT FLOOD ZONE CERTIFICATES
 REQUIRED:
 (1)COMPLETED. A FLOOD ZONE CERTIFICATE IS REQUIRED AS
 PART OF THE PLAN REVIEW DOCUMENTS WITH THE PROPOSED
 FINISH FLOOR HEIGHT. W. P. B. ADMINISTRATIVE CODE
 107.3.5.1.1 BUILDING MINIMUM PLAN REVIEW CRITERIA FOR
 COMMERCIAL BUILDINGS. ( 8) FLOOD REQUIREMENTS
 ELEVATIONS, ENCLOSURES, FLOOD DAMAGE-RESISTANT
 MATERIALS.
  
 (2) ONCE THE FIRST FLOOR SLAB IS POURED THE 2ND
 ELEVATION CERTIFICATE IS REQUIRED. W. P. B.
 ADMINISTRATIVE CODE 110.3 REQUIRED INSPECTIONS 1.2
 FLOOR/ SLAB INSPECTION. IN FLOOD HAZARD AREAS, UPON
 PLACEMENT OF THE LOWEST FLOOR, INCLUDING BASEMENT, AND
 PRIOR TO FURTHER VERTICAL CONSTRUCTION, THE ELEVATION
 CERTIFICATION, REQUIRED IN SECTION 1612.5, SHALL BE
 SUBMITTED TO THE BUILDING OFFICIAL.
  
 (3) BEFORE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY
 OR A CERTIFICATE OF COMPLETION THE 3RD FLOOD ZONE
 CERTIFICATE IS REQUIRED WITH THE HEIGHT OF ALL EXTERIOR
 ATTENDANTS A/C PADS OR OTHER SLABS FOR GENERATORS.
 W. P. B. ADMINISTRATIVE CODE 110.3 REQUIRED INSPECTIONS
 (6) FINAL INSPECTION. TO BE MADE AFTER THE BUILDING IS
 COMPLETED AND READY FOR OCCUPANCY. 6.1. LOWEST FLOOR
 ELEVATION. IN FLOOD HAZARD AREAS, AS PART OF THE FINAL
 INSPECTION, A FINAL CERTIFICATION OF THE LOWEST FLOOR
 ELEVATION SHALL BE SUBMITTED TO THE AUTHORITY HAVING
 JURISDICTION.
  
 FEMA NEW FORM AVAILABLE JUNE 13/2016.
 OMB NO. 1660-0008
 EXPIRATION DATE: NOV. 30/2018
 HTTP://WWW.FEMA.GOV/BUSINESS/NFIP/ELVINST.SHTM
  
 3A) COMMENT AS TO SHEET 102-A2.52B AND SHEET 156-A4.13A
 DETAIL # 5. THE PLANS SHOW DOUBLE WOOD SLEEPERS AND
 WOOD DECK. THE PLANS ARE SILENT AS TO THE TYPE OF WOOD
 THE SLEEPERS AND DECK WILL BE MADE. HOW THE DECK WILL
 BE ANCHORED IN HIGH WIND EVENTS. SPACING OF THE
 SLEEPERS, THICKNESS OF DECK MATERIALS, SPACING OF
 MATERIAL AND THE COMPLIANCE WITH 2010 FBC-B 603.1.1
 FIRE RETARDANT TREATED WOODS.
  
 3B) THERE ARE 2 OTHER CONCERNS ABOUT THE WOOD DECK
 SHOWN ON SHEET 102-A2.52B, BETWEEN GRAPH LINES 9 & 10
 THERE IS A BALCONY DIVIDER AND TO THE RIGHT AT POINT P5
 THE WOOD DECK ENDS, HOW IS THE FINISH DECK ELEVATION
 CHANGE IN REGARDS TO THE CONCRETE DECK TO THE RIGHT?
 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
  
 3C) WITHOUT THE KNOWN ELEVATION CHANGE FROM THE WOOD
 DECK TO THE FINISH CONCRETE DECK THE PROBLEM MAY OCCUR
 IF THE CONCRETE DECK IS THE SAME HEIGHT THROUGHOUT ALL
 OF THE 2ND FLOOR LEVEL AND THE WOOD DECK BEING 3 ?
 INCHES HIGHER THAN THE CONCRETE DECK, THEN WE WOULD NOT
 MET THE HEIGHT REQUIREMENT FOR THE GUARDRAIL OF 42
 INCHES, PER 2010 1013.2.
  
 4A) THE MEETING HELD ON JULY 26TH/ 2017 IN THE PLANNING
 DEPARTMENT INDICATED PLANS WILL NEED TO BE UPDATED IN
 REGARDS TO THE USE OF 2 HR. RATED SHAFTS VERSES THE USE
 OF FLAMEBAR. THE CURRENT SET OF REVISIONS SUBMITTED
 SHOW ON SHEET 437-M5.01 IN NOTE 1 THE USE OF FLAMEBAR
 ON ALL TOILET & KITCHEN EXHAUST DUCT HORIZONTAL OFFSETS
 TO BE COMPLETED WITH FLAMEBAR DUCT.
 SHEET $38-M5.02 A SIMILAR NOTE. SHEET 440-M504 NOTE 1
 ALL SMOKE EXHAUST, PRESSURIZATION DUCTS AND OUTSIDE AIR
 HORIZONTAL OFFSETS SHALL BE DONE WITH FLAME BAR. PLEASE
 NOTE ONCE THE DISCUSSION WAS STARTED IT APPEARS THE
 PLANS ARE NOT CORRECT, AND FLAMEBAR IS TO BE USED
 TOTALLY AND THE ELIMINATION OF ALL SHAFTS.
 DISCUSSION BETWEEN THE ARCHITECT AND MECHANICAL
 ENGINEER SHOWED TO DATE( 7/18/17 MEETING) THERE HADN?T
 BEEN AN AGREEMENT REACHED.
 IN DISCUSSION OVER E-MAILS THERE HAD BEEN TALK OF A
 FLORIDA DECLARATORY STATEMENT, BUT TO DATE NONE HAS
 BEEN PROVIDED. IN THE 2010 FBC-B IN SECTION 708.2
 PROVIDES WHERE SHAFTS ARE REQUIRED AND THE EXCEPTIONS.
 IF THE DESIGNERS WOULD LIKE THE BUILDING DEPARTMENT TO
 CONSIDER THIS UNDER THE 2010 WEST PALM BEACH AMENDMENTS
 TO THE FLORIDA BUILDING CODE, CHAPTER 1, ADMINISTRATION
 104.11. ALTERNATE MATERIALS, DESIGN AND METHODS OF
 CONSTRUCTION AND EQUIPMENT. THE DESIGNER MUST REQUEST
 IN WRITING THAT THE BUILDING OFFICIAL WOULD REVIEW, AND
 ALLOW THIS AS AN EQUAL TO THE CODE.
  
 104.11 ALTERNATIVE MATERIALS, DESIGN AND METHODS OF
 CONSTRUCTION AND EQUIPMENT. THE
 PROVISIONS OF THIS CODE ARE NOT INTENDED TO PREVENT THE
 INSTALLATION OF ANY MATERIAL OR TO PROHIBIT
 ANY DESIGN OR METHOD OF CONSTRUCTION NOT SPECIFICALLY
 PRESCRIBED BY THIS CODE, PROVIDED THAT
 ANY SUCH ALTERNATIVE HAS BEEN APPROVED. AN ALTERNATIVE
 MATERIAL, DESIGN OR METHOD OF
 CONSTRUCTION SHALL BE APPROVED WHERE THE BUILDING
 OFFICIAL FINDS THAT THE PROPOSED DESIGN IS
 SATISFACTORY AND COMPLIES WITH THE INTENT OF THE
 PROVISIONS OF THIS CODE, AND THAT THE MATERIAL, METHOD
 OR WORK OFFERED IS, FOR THE PURPOSE INTENDED, AT LEAST
 THE EQUIVALENT OF THAT PRESCRIBED IN THIS CODE IN
 QUALITY, STRENGTH, EFFECTIVENESS, FIRE RESISTANCE,
 DURABILITY AND SAFETY. WHEN ALTERNATE LIFE SAFETY
 SYSTEMS ARE DESIGNED, THE SFPE ENGINEERING GUIDE TO
 PERFORMANCE-BASED FIRE PROTECTION
 ANALYSIS AND DESIGN OF BUILDINGS, OR OTHER METHODS
 APPROVED BY THE BUILDING OFFICIAL MAY BE USED.
 THE BUILDING OFFICIAL SHALL REQUIRE THAT SUFFICIENT
 EVIDENCE OR PROOF BE SUBMITTED TO SUBSTANTIATE ANY
 CLAIM MADE REGARDING THE ALTERNATIVE.
 104.11.1 RESEARCH REPORTS. SUPPORTING DATA, WHERE
 NECESSARY TO ASSIST IN THE APPROVAL OF
 MATERIALS OR ASSEMBLIES NOT SPECIFICALLY PROVIDED FOR
 IN THIS CODE, SHALL CONSIST OF VALID
 RESEARCH REPORTS FROM APPROVED SOURCES.
 104.11.2 TESTS. WHENEVER THERE IS INSUFFICIENT EVIDENCE
 OF COMPLIANCE WITH THE PROVISIONS OF
 THIS CODE, OR EVIDENCE THAT A MATERIAL OR METHOD DOES
 NOT CONFORM TO THE REQUIREMENTS OF THIS
 CODE, OR IN ORDER TO SUBSTANTIATE CLAIMS FOR
 ALTERNATIVE MATERIALS OR METHODS, THE BUILDING
 OFFICIAL SHALL HAVE THE AUTHORITY TO REQUIRE TESTS AS
 EVIDENCE OF COMPLIANCE TO BE MADE AT NO
 EXPENSE TO THE JURISDICTION. TEST METHODS SHALL BE AS
 SPECIFIED IN THIS CODE OR BY OTHER
 RECOGNIZED TEST STANDARDS. IN THE ABSENCE OF RECOGNIZED
 AND ACCEPTED TEST METHODS, THE
 BUILDING OFFICIAL SHALL APPROVE THE TESTING PROCEDURES.
 TESTS SHALL BE PERFORMED BY AN APPROVED
 AGENCY. REPORTS OF SUCH TESTS SHALL BE RETAINED BY THE
 BUILDING OFFICIAL FOR THE PERIOD REQUIRED
 FOR RETENTION OF PUBLIC RECORDS.
  
 4B) THE OTHER ISSUE THAT WILL NEED TO BE CONSIDERED
 WITH THE REMOVAL OF SHAFT WALL CONSTRUCTION,
 (CONSIDERED COMMON AREAS) WILL BE THE REPLACEMENT WALL
 SYSTEM, USUALLY A CHASE WALL SYSTEM POSSIBLY
 WITH DRYWALL ON ONLY ONE SIDE, AND OR MAYBE INSULATION.
 THIS WALL SYSTEM WOULD STILL NEED TO SHOW COMPLIANCE
 WITH THE 2010 FBC-B 1207.2 AIR-BORNE SOUND. WALLS,
 PARTITIONS AND FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR
 AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E
 90.
  
 5) DURING THE MEETING HELD ON 7/26/17 THERE WAS
 DISCUSSION BETWEEN THE USE OF THE TYPE OF ROOFING
 INSULATION TO BE USED. THE ARCHITECT SHOWS ON THE PLANS
 THE USE POLYISOCYANURATE BOARD SHEET A4.31 DETAIL # 1.
 THE ROOFING SPEC 07 5400 IS GIVEN. THE SPEC BOOKS ARE
 NOT INCLUDED IN THE PLAN REVIEWS NOR DO WE REVIEW THEM.
 IN THE MEETING IT WAS DISCUSSED POSSIBLY TO GOING AND
 USING LIGHTWEIGHT CONCRETE INSTEAD OF POLYISOCYANURATE
 BOARD.
  
 WHEN YOU REVIEW THE LIGHTWEIGHT SPEC SECTION 03 52 00
 FOR LIGHTWEIGHT CONCRETE ROOF INSULATION WRITER HAS
 MANY OPTIONS AS TO HOW TO WRITE THE SPEC FOR VENTING
 DEPENDING ON LOCATION TYPE OF DECK CONCRETE VERSES
 STEEL DECK WITH VENTING OF DECK OR NON-VENTED STEEL
 DECKING TO ALIEVE THE MOISTURE WITHIN THE LIGHTWEIGHT
 CONCRETE.
  
 I COULD NOT FIND A ROOFING SPEC LISTED FOR 07 5400 BUT
 DID FIND A ROOF SPEC 07 5300 FOR SINGLE PLY MEMBRANE
 ROOFING, THE COMPANIES LISTED ARE CARLISLE, FLEX, GAF,
 SIKA SARNAFIL, AND VERSICO EACH WRITING THEIR OWN
 REQUIREMENTS FOR ROOF INSULATION AND INSTALLATION OF
 SYSTEMS AND VENTING REQUIREMENTS.
  
 6A) WITHIN THE MEETING HELD ON 7/26/2017 THERE WAS
 DISCUSSION ON THE POOL AND REQUIREMENT FOR A SEPARATE
 BUILDING PERMIT. IT WAS INDICATED THERE WILL BE A
 PREFABRICATED WALL SYSTEM WITH POOL LINER.
 THIS REVISION SHOWS DETAILS FOR THE MEMBRANE LINER,
 SHEET 746-W5.1_04:
 DETAIL 01 MAIN POOL TYPICAL EDGE
 DETAIL 02 MAIN POOL STAIRS
 DETAIL 03 MAIN POOL STRUCTURAL SYSTEM / HOT SPA WALL &
 EDGE
 THESE AND OTHER DETAILS SHOW THE PREFABRICATED WALL AND
 STRUCTURAL BRACING/ STRUCTURAL WALL COMPONENT POOL WALL
 SYSTEM WILL BE UNDER A SEPARATE POOL (BUILDING PERMIT)
 OR WILL SUFFOLK CONSTRUCTION BE SUBMITTING THESE
 DETAILS UNDER A FUTURE REVISION? 107.2.1.3. ADDITIONAL
 INFORMATION REQUIRED?
  
 6B) SHEET 746-W5-104 DETAIL 03, IN THE SUBMITTED DETAIL
 IT WOULD APPEAR THERE WOULD BE GREATER WATER PRESSURE
 ON THE POOL SIDE WALL SINCE IT IS DEEPER THAN THE SPA,
 SHOULD THE LATERAL BRACING BE TURNED THE OPPOSITE WAY
 TO HELPS SUPPORT, AND BRACE THE POOL WALL. 107.2.1.3
 ADDITIONAL INFORMATION REQUIRED.
  
 7) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 JAMES A. WITMER BN, PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST.
 WEST PALM BEACH. FL 33402
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved