Plan Review Notes
Plan Review Notes For Permit 17070100
Permit Number 17070100
Review Stop G
Sequence Number 1
Notes
Date Text
2017-07-11 09:45:081) THE COPY OF SIZING TABLE 15.1 ( B) IS ILLEGIBLE.
 SUBMIT A CLEAR AND LEGIBLE COPY FOR REVIEW. WPB AMEND.
 TO FBC SEC. 107.2.1.
 2) SUBMIT TWO COPIES OF THE SIZING TABLES USED IN THE
 DESIGN FOR THIS GAS SYSTEM OR PLACE A NOTE ON BOTH SETS
 OF PLANS LISTING THE SIZING TABLES FROM THE GAS CODE OR
 OTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS
 SYSTEM. FGC SEC.402.3, FBCR SEC. G 2413.3. THE NOTE "
 "GAS CODES BASED ON 402.4 SERIES FBC CODES" IS VAGUE.
 CLARIFY.
 3) THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE
 ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE
 THE EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED,
 THE EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE
 OPERATING SYSTEM. FGC SECS. 401.4, 401.8, 402.1, 402.2,
 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, G2413.2,
 G2413.3.
 4) SUBMIT A CLEAR AND LEGIBLE SURVEY FOR REVIEW THAT
 CLEARLY SHOWS THE LOCATION OF THE EXISTING PROPANE
 TANK, METER, AND THE LOCATION OF THE NEW GENERATOR. WPB
 AMEND. TO FBC SEC. 107.2.1.
 5)SUBMIT TWO COPIES OF THE SPECIFIC SIZING TABLE FOR
 THE LOW PRESSURE SYSTEM.
 6) SHOW THE CAPACITY OF THE LP TANK ON THE PLANS AND
 SHOW THE TYPE OF TANK ( HORIZONTAL ASME OR VERTICAL
 ASME).
 7) SHOW THE TYPE OF FOUNDATION FOR THE LP TANK ON THE
 PLAN. HORIZONTAL ASME CONTAINERS SHALL COMPLY WITH NFPA
 58 SEC.6.6.3.1. VERTICAL ASME CONTAINERS SHALL COMPLY
 WITH NFPA 58-11 SEC. 6.6.4.1.
 8) SHOW THE DISTANCE OF THE LP TANK FROM THE EXTERIOR
 WALL OF THE STRUCTURE TO THE CONTAINER SURFACE AND ALSO
 FROM THE PROPERTY LINE TO THE CONTAINER SURFACE. COMPLY
 WITH NFPA 58-11 SEC. 6.3.1 & TABLE 6.3.1.
 9) THE MANUFACTURER'S SPECIFICATIONS FOR THE GENERATOR
 SHALL BE ONSITE FOR FINAL GAS INSPECTION. THE GENERATOR
 SHALL BE LISTED AND APPROVED. NFPA 58 SEC. 5.20.1. THE
 GENERATOR SHALL MEET THE REQUIREMENTS OF UL 2200.
 10) THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE
 ADDED INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE
 THE EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED,
 THE EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE
 OPERATING SYSTEM. FGC SECS. 401.4, 401.8, 402.1, 402.2,
 402.3 OR FBCR SECS.G2412.4, G2412.8, G2413.1, G2413.2,
 G2413.3.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR