2017-04-25 11:50:19 | 1ST REVIEW FBC-2014 MECHANICAL |
| PERMIT #17040865 |
| 4/25/17 |
| |
| 1) SHEET G-040.00: THE PROPOSED PROJECT IS CLASSIFIED |
| AS A CHANGE OF OCCUPANCY AS DEFINED BY SECTION 202 |
| FBC-14 EXISTING BUILDING CODE. PLEASE ADD THE REQUIRED |
| CODE DATA TO THE GENERAL PROJECT INFORMATION. |
| |
| 2) REVISE THE ENERGY CALCULATIONS TO INDICATE CHANGE OF |
| OCCUPANCY UNDER BUILDING CLASSIFICATION. |
| |
| 3) M0.1: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR |
| THE TOILET ROOMS AND THE ELECTRICAL AND SOILED ROOMS. |
| PLEASE INDICATE HOW THE FANS WILL OPERATE- CONTINUOSLY |
| OR INTERMITTENTLY. |
| |
| 4) SHEET M1.1: IT APPEARS RETURN GRILLS ARE MISSING IN |
| THE CEILINGS OF OFFICES # 25, 26, 27, 32, 33 & STAFF |
| LOUNGE #41. |
| |
| 5) M1.1: PLEASE LABEL THE CONDENSER SHOWN IN THE 2ND |
| FLOOR PLAN. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR |
| THE CONDENSER THAT INDICATE IT CAN BE INSTALLED ON THE |
| INTERIOR OF THE BUILDING. |
| |
| 6) THE ARCHITECTURAL AND STRUCTURAL PLANS ARE |
| CONFLICTING WITH THE MECHANICAL PLAN AS TO HOW THE NEW |
| ACCU-1 WILL BE MOUNTED ON THE ROOF- SEE A-111.00, |
| S-301, AND M3.0. IF USING THE STAND, PLEASE PROVIDE TWO |
| COPIES OF THE NOA BEARING THE APPROVAL STAMP OF THE |
| EOR. THE EOR SHALL ALSO CIRCLE, HIGHLIGHT, OR OTHERWISE |
| MARK ALL APPLICABLE NOTES, DETAILS, FASTENERS , AND |
| DESIGN |
| |
| PRESSURE TABLES ETC.THAT PERTAIN TO THE INSTALLATION. |
| SEE ALSO TABLE 1509.6.5 FBC-14 BUILDING AND SHOW THE |
| CLEARANCE HEIGHT FROM THE ROOM SURFACE TO THE BOTTOM OF |
| THE CU. |
| |