Plan Review Notes For Permit 17030699 |
Permit Number |
17030699 |
|
Review Stop |
FIRE |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2017-03-21 12:18:33 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | INSPECTION. | | | | | | 1) TEST AT 200 PSI FOR 2 HOURS PER NFPA 13. | | | | 24.2 ACCEPTANCE REQUIREMENTS. | | 24.2.1* HYDROSTATIC TESTS. | | 24.2.1.1 UNLESS PERMITTED BY 24.2.1.2 THROUGH 24.2.1.8, | | ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO | | SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED | | AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE | | WITHOUT LOSS FOR 2 HOURS. | | | | | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | |
|