2017-05-09 04:53:041) AS A NOTE OF INFORMATION, A SEPARATE PERMIT WILL BE
 REQUIRED FOR THE NEW BACKFLOW PREVENTER LOCATED AT THE
 NEW WATER METER. THE DEVICE SHALL BE LEAD- FREE AND
 COMPLY WITH THE CITY OF WPB CROSS-CONNECTION CONTROL
 MANUAL AND MUST ALSO BE ON THE UNIVERSITY OF SOUTHERN
 CALIFORNIA'S (USC) LIST OF APPROVED DEVICES. TWO COPIES
 OF THE MANUFACTURER'S SPECIFICATIONS SHALL BE SUBMITTED
 AT THE TIME OF PERMIT APPLICATION. 2014 FBC-PLUMBING
 SEC.605.2.1. THE CITY OF WPB CROSS-CONNECTION MANUAL
 CAN BE VIEWED AT HTTP://WPB.ORG/UTILITIES/BACKFLOW.
 2) SHT. A 8.02 - DETAIL #3 - THE SIDE WALL GRAB BAR
 NEXT TO THE WATER CLOSET SHALL BE LOCATED PER 2014
 FBC-ACCESS.SEC. 604.5.1 & FIGURE 604.5.1. THE GRAB BAR
 SHALL EXTEND A MINIMUM OF 54 INCHES FROM THE REAR
 WALL.THE DETAIL SHOWS THE GRAB BAR 10 1/2 INCHES FROM
 THE REAR WALL WHICH WILL PRODUCE 52 1/2 INCHES FROM THE
 REAR WALL USING A 42 INCH BAR AND A MINIMUM OF 54
 INCHES IS REQUIRED. 2ND REQUEST.
 3) SHT. A 8.02 - DETAILS #3 & #4 - THE TOILET PAPER
 DISPENSER SHALL BE LOCATED 7 INCHES MINIMUM AND 9
 INCHES MAXIMUM TO THE CENTER OF THE FIRST TOILET PAPER
 ROLL, NOT TO THE CENTER OF THE DOUBLE ROLL DISPENSER AS
 SHOWN ON THE PLANS.FBC-ACCESS SEC.604.7. 2ND REQUEST.
 4) THE DETAIL OF THE HOT WATER RECIRCULATING SYSTEM ON
 DETAIL #1 ON SHT.P0.1 DOES NOT APPEAR TO COMPLY WITH
 2014 FBC-PLUMBING SEC.607.2.2. I DO NOT SEE A HOT WATER
 RETURN LINE COMING FROM THE FIXTURES BACK TO THE WATER
 HEATERS. PLEASE REFER TO THE FOLLOWING TEXT FROM THE
 PLUMBING CODE:
 607.2.2 RECIRCULATING PUMP.
 WHERE A THERMOSTATIC MIXING VALVE IS USED IN A SYSTEM
 WITH A HOT WATER RECIRCULATING PUMP, THE HOT WATER OR
 TEMPERED WATER RETURN LINE SHALL BE ROUTED TO THE COLD
 WATER INLET PIPE OF THE WATER HEATER AND THE COLD WATER
 INLET PIPE OR THE HOT WATER RETURN CONNECTION OF THE
 THERMOSTATIC MIXING VALVE.
 5) THE DESIGN OF THE GREASE INTERCEPTOR SHALL COMPLY
 WITH THE CITY OF WEST PALM BEACH STANDARD DRAWING GS-7
 FOR CONCRETE TANKS AND DRAWING GS-7.1 FOR
 HYDR-MECHANICAL TANKS. I HAVE INCLUDED COPIES OF THESE
 STANDARD DRAWINGS IN THE PERMIT APPLICATION SUBMITTAL
 PACKAGE FOR YOUR PERUSAL. AS A NOTE OF INFORMATION, THE
 INTERCEPTOR SHALL BE PERMITTED UNDER A SEPARATE PERMIT.
 ENSURE THE SIZE AND LOCATION OF THE FLOW THROUGH HOLE
 IN THE BAFFLE COMPLIES WITH THE CITY'S STANDARD
 DRAWING.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved