2018-09-11 12:35:15 | 3ND REVIEW |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER LL |
| CITY OF WEST PALM BEACH |
| DEVELOPMENT SERVICES |
| BUILDING DIVISION |
| 561-805-6711 |
| [email protected] |
| |
| GAS COMMENTS: PREVIOUS COMMENTS |
| |
| PARTIALLY COMPLIED 1. 1. SUBMIT AN ISOMETRIC DRAWING |
| THAT CLEARLY SHOWS ALL CUT SECTIONS OF PIPE AND |
| CORRESPONDING LENGTHS PER FBC-2014 FUEL GAS, SECS. |
| 402.4.1, 402.4.2. AND BTU LOAD OF EACH APPLIANCE. ALSO |
| SHOW ALL VALVE DRIP LEGS AND REGULATORS REFER TO THE |
| FBC-2014 FUEL GAS SECS. 401.8 THRU 402.6.1 AND TABLES |
| 402.4(1) THRU 402.4(37). |
| PLEASE PROVIDE THE LENGTH OF EACH CUT SECTION OF PIPE. |
| PLEASE SHOW BTU LOAD FOR EACH GAS APPLIANCE.THE NUMBERS |
| ON THE ENLARGE BANQUET KITCHEN ISO DO NOT ALL MATCH THE |
| GAS EQUIPMENT SCHEDULE. |
| |
| 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| FBC-2014 FUEL GAS CODE SEC. 304. PLEASE PROVIDE |
| COMBUSTION AIR CALC FOR THE KITCHEN APPLIANCES. |
| |
| 3. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE |
| SEC. 502 THRU 505. IN YOUR RESPONSE YOU NOTE VENT |
| DETAILS ON SHT P-3.0.08 I COULD NOT LOCATE ANY VENT |
| DETAILS ON THAT SHT PLEASE CLARIFY. |
| |
| 4. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 WE NEED |
| THESE TO VERIFY BTU LOADS-IF THEY CAN NOT BE PROVIDED |
| FOR PLAN REVIEW PLACE A NOTE ON THE PLAN TO BE ON |
| JOBSITE FOR FIRST ROUGH INSPECTION. |
| |
| 2ND REVIEW COMMENTS: NOT COMPLIED |
| |
| 1. SHT. P-3.0.08 ON THE GAS ISOMETRIC THE 2ND BRANCH |
| UPSTREAM OF THE METER HAS IS LABELED AS MAIN KITCHEN |
| SHT. P-1.5.07 WHICH LABELS IT AS THE BANQUET KITCHEN |
| PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| |
| 4. WHAT IS THE 3/4" BRANCH WITH THE NOTE FIX TAG PLEASE |
| CLARIFY. PER WPB AMEND TO FBC 107.2.1 |
| |
| 5. WHAT IS THE 2" AT THE UPSTREAM END OF THE ISOMETRIC |
| WITH THE TAG XXXMBH/L.F.=XX' PLEASE CLARIFY. PER WPB |
| AMEND TO FBC 107.2.1 |
| |
| 6. ON THE ENLARGED ISOMETRIC DRAWING PLEASE SHOW THE |
| PRESSURE REGULATORS AND THE VALVES ALSO SHOW THE LENGTH |
| AND SIZE OF THE PIPING BETWEEN THE REGULATOR AND THE |
| APPLIANCE. PER WPB AMEND TO FBC 107.2.1 |
| |
| 7. PLEASE LABEL THE ENDS OF THE PIPE WHERE THEY |
| CONTINUES. PER WPB AMEND TO FBC 107.2.1 |
| |
| |
| FYI A COMPLETE AND THOROUGH REVIEW CANNOT BE DONE AT |
| THIS TIME. UPON RESUBMITTAL THERE MAYBE ADDITIONAL |
| COMMENTS. |
| |
| WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES |
| AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW |
| COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE |
| AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW. |
| |
| |