Plan Review Notes
Plan Review Notes For Permit 17020696
Permit Number 17020696
Review Stop P
Sequence Number 3
Notes
Date Text
2017-04-24 09:50:311ST REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1. IN BOTH PLAN SETS THERE ARE TWO M-2A AND M-5 SHTS
 ONE SHOULD BE MARKED AS VOID OR THE BEST PRACTICE IS TO
 REMOVE THE OLD SHEET.
  
 2. PROVIDE ON THE PLAN THE BTU LOAD OF EXISTING BOILER.
 PER WPB AMEND TO FBC 107.2.1
  
 3. SHOW SIZE OF EXISTING GAS LINE. PER WPB AMEND TO FBC
 107.2.1
  
 4. SHT. M-5 SHOWS RECONNECTION OF EXISTING POTABLE
 WATER SUPPLY TO TOWER SHOW TYPE OF BACK FLOW IF IT IS A
 DEVISE AND NOT AN AIR GAP IT SHALL BE CERTIFIED . FBC
 PL 608.1
  
  
 FYI A COMPLETE AND THOROUGH REVIEW CANNOT BE DONE AT
 THIS TIME. UPON RESUBMITTAL THERE MAYBE ADDITIONAL
 COMMENTS.
  
 WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES
 AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE
 AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved